Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC AT KANIHA TALCHER ANGUL ODISHA 759117 | KANIHA | ANGUL | ODISHA | 759117 | ₹6.7 L | L1 | Accepted-AOC LOA ISSUED |
| 2 | L2₹6.9 LRejected-Finance | ₹6.9 L | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹7.8 LRejected-Finance | ₹7.8 L | L3 | Rejected-Finance BEING L3 |
| Sl No | Description | Qty | Unit | RAJ KUMAR MOHARANA L2 | LIKU SAHOO L1 | M/s. MAA HINGULA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications) | 15,487 | CUM | 44 ₹6.8 L | 43.1 ₹6.7 L | 49.93 ₹7.7 L |
| 2.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 6,814.28 ₹6,814.28 | 6,674.9 ₹6,674.90 | 7,732.66 ₹7,732.66 |
Updated dates
Tender Value
₹14.9 L
EMD Value
₹18,700
Closing Date
3 Apr 2026, 5:00 pmClosed
STAFF OFFICER CIVIL KANIHA AREA
STAFF OFFICER CIVIL KANIHA AREA MCL TALCHER ANGUL ODISHA
Making garland drain, cleaning and renovation of existing garland drain at Jamania Brajasar Nallah and Z- Patch drain and the external part of Kaniha OCP of KA of for monsoon period for FY 2026-27
2026_MCL_356872_1
MCL/GM(KA)/SO(C)/25-26/763 DT. 17.03.2026
Open Tender
Civil Works - Others
120 days
KANIHA OCP
AS PER NIT
3 documents required · 3 mandatory
₹18,700
29 May 2026
17 Mar 2026
6 Apr 2026
18 Mar 2026
3 Apr 2026
18 Mar 2026
18 Mar 2026 - 23 Mar 2026
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications)
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tendernotice_2.pdf
PDF • 2.44 MB
BOQ_369731.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid