Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-AOC BHAKTINAGAR NJP STATION ROAD DIST JALPAIGURI WB WEST BENGAL 734007 | JALPAIGURI | WEST BENGAL | 734007 | ₹33.6 L Quoted ₹34.4 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹35.8 LRejected-Finance RANGAPAHAR RAILWAY CROSSING GATE NO 1 DIMAPUR 797112 NAGALAND | DIMAPUR | NAGALAND | 797112 | ₹35.8 L | L2 | Rejected-Finance Not Lowest Bidder |
| 3 | L3₹38.3 LRejected-Finance VILL DANGAPARA NEAR SAHID BEDI PO RAHARAH PS KHARDAH KOLKATA 700 118 | 24 PARAGANAS NORTH | WEST BENGAL | 700118 | ₹38.3 L | L3 | Rejected-Finance Not Lowest Bidder |
| 4 | L4₹38.9 LRejected-Finance MILITARY ROAD OPP RHYTHM SHIVMANDIR PO KADAMTALA DARJEELING 734 011 | DARJEELING | WEST BENGAL | 734011 | ₹38.9 L | L4 | Rejected-Finance Not Lowest Bidder |
| 5 | L5₹39.5 LRejected-Finance ATUL PRASAD SARANI DUDH MORE SILIGURI 734006 DARJEELING WB | JALPAIGURI | WEST BENGAL | 734006 | ₹39.5 L | L5 | Rejected-Finance Not Lowest Bidder |
| Sl No | Description | Qty | Unit | MAURYA CONSTRUCTIONS L2 | MS UNITY CONSTRUCTION CO L5 | SHANTI UDYOG L3 | M/S ASHRAFI CONSTRUCTION L1 | G C DUTTA N CO L4 | A K ENTERPRISES L7 | VICKY ENTERPRISES L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc. 1.50 m wide and not exc. 1.50 m in depth for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exc. 10 Sqm on plan and not exceeding 1.5 m in depth getting out in soft / loose soil complete all as specified and directed. | 21.7 | Cum | 250 ₹5,425 | 255 ₹5,533.50 | 250 ₹5,425 | 210 ₹4,557 | 249 ₹5,403.30 | 265 ₹5,750.50 | 242 ₹5,251.40 |
| 2.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc. 25 cm thick in each layer as in soil complete all as specified and directed. | 14.4 | Cum | 100 ₹1,440 | 160 ₹2,304 | 200 ₹2,880 | 130 ₹1,872 | 157 ₹2,260.80 | 165 ₹2,376 | 150 ₹2,160 |
| 3.00 | Excavating post holes or similar holes, each not exceeding 0.5 Cum, getting out in Soft/ Loose soil, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, watering, and removing surplus soil to a distance n exc 50 m and making good surface complete all as specified and directed. | 107 | Each | 100 ₹10,700 | 140 ₹14,980 | 200 ₹21,400 | 115 ₹12,305 | 137 ₹14,659 | 145 ₹15,515 | 132 ₹14,124 |
| 4.00 | Removing Excavated soils not exc 50 M and depositing where directed at a level not exc1.5 M above the starting point complete all as specified and directed. | 6.3 | Cum | 140 ₹882 | 180 ₹1,134 | 270 ₹1,701 | 145 ₹913.50 | 173 ₹1,089.90 | 190 ₹1,197 | 168 ₹1,058.40 |
| 5.00 | M&L PCC 1:3:6 type C-2 (using 40 mm graded crushed stone aggregate) as in foundation, filling and mass concrete complete all as specified and directed. | 13 | Cum | 4,500 ₹58,500 | 5,300 ₹68,900 | 5,300 ₹68,900 | 4,425 ₹57,525 | 5,180 ₹67,340 | 5,500 ₹71,500 | 5,500 ₹71,500 |
| 6.00 | M&L for Plain Cement Concrete Type D2 1:4:8 (using 40 mm graded stone aggregate) in foundations, filling and mass concrete complete all as specified and directed. | 0.29 | Cum | 3,900 ₹1,131 | 4,510 ₹1,307.90 | 4,500 ₹1,305 | 3,950 ₹1,145.50 | 4,418 ₹1,281.22 | 4,400 ₹1,276 | 4,000 ₹1,160 |
| 7.00 | M&L for Plain Cement Concrete Type C2 1:3:6 (using 40 mm graded stone aggregate) in surface channels and drains, hardstanding including necessary form work complete all as specified and directed. | 0.05 | Cum | 5,000 ₹250 | 5,340 ₹267 | 5,570 ₹278.50 | 4,500 ₹225 | 5,230 ₹261.50 | 5,200 ₹260 | 5,260 ₹263 |
| 8.00 | M & L for providing Reinforced cement concrete 1:2:4, Type B-1, Nominal Mix using 20 mm graded stone aggregate as in foundation including rafts, footing, foundation beams, plinth beams, bases for columns, basement slabs, under-reamed piles and mass concrete complete all as specified and directed.
Note-(Reinforcement shall be measured and paid seperately) | 0.73 | CUM | 6,500 ₹4,745 | 6,740 ₹4,920.20 | 6,700 ₹4,891 | 6,700 ₹4,891 | 6,601 ₹4,818.73 | 6,700 ₹4,891 | 6,425 ₹4,690.25 |
| 9.00 | M & L for providing reinforced cement concrete 1:2:4, Type B-1, Nominal Mix using 20 mm graded stone aggregate as in columns, pillars, piers, posps and struts complete all as specified and directed.
(Note :- Reinforcement shall be measured and paid separately.) | 1.44 | Cum | 6,500 ₹9,360 | 6,740 ₹9,705.60 | 6,800 ₹9,792 | 6,700 ₹9,648 | 6,601 ₹9,505.44 | 6,700 ₹9,648 | 6,320 ₹9,100.80 |
| 10.00 | M&L brick work with fly ash brick, straight or curved on plan exc. 6 m mean radius built in CM 1:6 complete all as specified and as directed. | 1.5 | Cum | 7,500 ₹11,250 | 8,285 ₹12,427.50 | 8,100 ₹12,150 | 7,200 ₹10,800 | 8,115 ₹12,172.50 | 8,200 ₹12,300 | 8,050 ₹12,075 |
Updated dates
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
17 Mar 2026, 6:00 pmClosed
Garrison Engineer Sukna
Garrison Engineer Sukna, Post-Simulbari, Dist-Darjeeling, WB-734009
SPL REPAIR AT BLDG NO P-878 AND SECURITY FENCING AND BACK GATE OF COMN COMPLEX UNDER AGE B/R-II AND AGE E/M OF GE SUKNA AT MIL STN SUKNA
2026_MES_752808_1
GE Sukna/8990
Open Tender
Civil Works
180 days
SUKNA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE SUKNA
₹72,000
18 May 2026
16 Feb 2026
20 Mar 2026
17 Feb 2026
17 Mar 2026
2 Mar 2026
17 Feb 2026 - 10 Mar 2026
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tenderdoc8990.pdf
Tender Documents • 1.76 MB
BOQ_843259.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid