| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-Finance | ₹7.0 L | L1 | Accepted-Finance The rates quoted by the contractor are lowest, hence accepted. |
| 2 | L2₹7.4 LRejected-Finance C O SH LEKH RAM PANWAR NIWAS NEAR BHAGWATI MANDIR LOWER KALINI SHIMLA DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹7.4 L | L2 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| 3 | L3₹9.8 LRejected-Finance SHANTI COTTAGE BELOW PASSPORT OFFICE PANTHAGHATI SHIMLA DISTT SHIMLA HP | SHIMLA | SHIMLA | HP | 171009 | ₹9.8 L | L3 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| 4 | L4₹9.9 LRejected-Finance | ₹9.9 L | L4 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| 5 | L5₹10.0 LRejected-Finance | ₹10.0 L | L5 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| Sl No | Description | Qty | Unit | Dalip Singh L2 | Mohit Verma L5 | Saurabh Sharma L3 | AAKASH PALSRA L4 | DHANVEER SINGH L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All the surplus excavated earth to be dumped at approved dumping site Bharyal. Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 562.5 | P.Cum | 170 ₹95,625 | 328 ₹1.8 L | 310 ₹1.7 L | 310 ₹1.7 L | 180 ₹1.0 L |
| 2.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 18 | P.Cum | 275 ₹4,950 | 350 ₹6,300 | 350 ₹6,300 | 350 ₹6,300 | 190 ₹3,420 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 2.7 | P.cum | 3,500 ₹9,450 | 4,300 ₹11,610 | 4,000 ₹10,800 | 4,300 ₹11,610 | 3,600 ₹9,720 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 60 | P.sqm | 375 ₹22,500 | 430 ₹25,800 | 430 ₹25,800 | 430 ₹25,800 | 140 ₹8,400 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 53.95 | P.Cum | 5,200 ₹2.8 L | 6,100 ₹3.3 L | 6,000 ₹3.2 L | 6,100 ₹3.3 L | 5,890 ₹3.2 L |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1,620.53 | P.Kg | 78 ₹1.3 L | 97 ₹1.6 L | 95 ₹1.5 L | 97 ₹1.6 L | 78 ₹1.3 L |
| 7.00 | Stone filling behind retaining walls & B/wall :including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 13.5 | P.Cum | 1,800 ₹24,300 | 2,200 ₹29,700 | 2,200 ₹29,700 | 2,200 ₹29,700 | 800 ₹10,800 |
| 8.00 | Carriage of material by mechanical transport including Loading & unloading & stacking of Muck/Debries in approved M.C. Dumping site at bharyal(10 km) Tansporation charges will be paid extra (10km) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 309.5 | P.cum | 400 ₹1.2 L | 650 ₹2.0 L | 650 ₹2.0 L | 650 ₹2.0 L | 299 ₹92,540.50 |
| 9.00 | Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and comber including spreading, watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification. 100mm spread thickness (finished work including materials and labour)including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 22.5 | P.Cum | 2,200 ₹49,500 | 2,300 ₹51,750 | 2,300 ₹51,750 | 2,300 ₹51,750 | 1,200 ₹27,000 |
Tender Value
₹9.7 L
EMD Value
₹19,300
Closing Date
17 Mar 2026, 5:00 pmClosed
Executive Engineer R B MC Shimla
Executive Engineer R B MC Shimla
C O MC Parking near Primary School Lower Panthaghati SH C O RCC wall and Cutting work etc in ward No 26
2026_MC_130786_11
470dated02032026
Open Tender
Civil Works
60 days
Shimla
Please refer to tender documents
7 documents required · 7 mandatory
₹413
Executive Engineer R B MC Shimla
₹19,300
30 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All the surplus excavated earth to be dumped at approved dumping site Bharyal. Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Stone filling behind retaining walls & B/wall :including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Carriage of material by mechanical transport including Loading & unloading & stacking of Muck/Debries in approved M.C. Dumping site at bharyal(10 km) Tansporation charges will be paid extra (10km) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and comber including spreading, watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification. 100mm spread thickness (finished work including materials and labour)including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.30 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_193725.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid