| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.5 LAccepted-AOC 368 MAHESHPUR SECTOR 21 PANCHKULA HR 134112 | PANCHKULA | PANCHKULA | HARYANA | 134112 | L1 | Accepted-AOC L1 | |
| 2 | L2₹39.7 L+₹6.2 L (18.5%)Rejected-Finance N A | L2 | Rejected-Finance Being Higher Bidder | |
| 3 | L3₹40.9 L+₹7.4 L (22.2%)Rejected-Finance 216 BHARAT NAGAR INDRAPURI BHOPAL MADHYA PRADESH 462021 | BHOPAL | MADHYA PRADESH | 462021 | L3 | Rejected-Finance Being Higher Bidder | |
| 4 | L4₹44.5 L+₹11.0 L (32.8%)Rejected-Finance 672 PART 2 SECTOR 15 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L4 | Rejected-Finance Being Higher Bidder | |
| 5 | L5₹47.5 L+₹14.0 L (41.7%)Rejected-Finance | L5 | Rejected-Finance Being Higher Bidder |
Tender Value
₹41.5 L
EMD Value
₹83,100
Closing Date
18 Nov 2023, 6:00 pmClosed
CWE (AF) Agra
HQ CWE (AF) Agra PIN 282008
PROVN OF FIRE HYDRANT SYSTEM FOR SRE ATCR-33 S RADAR SYSTEM AND EMERGENCY EXIT AT AF STN AGRA
2023_MES_625536_1
80023-21/E8
Open Tender
Miscellaneous Works
Item Rate
180 days
GE(AF) Tech Area
As per Tender documents
9 documents required · 9 mandatory
₹500
GE(AF) Tech Area, Agra
₹83,100
Yes
13 Feb 2024
28 Oct 2023
25 Nov 2023
28 Oct 2023
18 Nov 2023
11 Nov 2023
Amount
Supply, Installation, Testing & Commissioning of MS Seamless Cylinder made by hot spinning process, confirming to IS:7285 (Part 2) 2004, of capacity 140 Liter ,Cylinder neck size - 25E , working pressure 300 Bar, fully filled along with IG-100 Gas including Cylinder valve and Cylinder valve assembly DN12, working pressure upto 300 Bar at 15 Deg.C, suitable for manual, pneumatic, pneumatic-manual and electrical activation, Valve outlet thread-M24 x 1.5 complete tested at 450 Bar complete all as specified and directed. Cylinder Make: RAMA/EKC/MKC Valve and valve Assembly Make: Ceasefire/Fiwarec/Siemens /Rotarex Note :- Contractor shall submit certification / apprval for TPED (Directive 2010/35) ,CPR (Regulation 305/2011/EU),and LPCB (DIN EN 12094-4)
Supply, Installation, Testing & Commissioning of 24 VDC Electric Control, Head operated from the Detection & Control System and locally with a manual lever on the control head complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Lever operated Reset Tool for Solenoid actuator complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Pressure gauge with switch contact having Range 0 to 400 Bar, Switching Point 270 Bar complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens
Supply, Installation, Testing & Commissioning of BRASS PNEUMATIC ACTUATOR, minimal pilot pressure- 8 Bar suitable for 300 Bar system) complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens
Supply, Installation, Testing & Commissioning of Manual Actuator with lever thread size M36x1.5 complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens
Supply, Installation, Testing & Commissioning of Pilot hose Flexible 800mm long , 4mm dia , working pressure 360 Bar complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Pilot hose Flexible 1000mm long , 4mm dia , working pressure 360 Bar complete all as specified and directed . Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Adaptor for pilot line / Pilot Hose Adaptor complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Bleed valve for use in pilot lines of fixed fire extinguishing systems complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Screw Plug complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Discharge Hose of suitable length, Nominal dia -12mm, Working Pressure 360 Bar complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Check Valves for discharge hose pipe complete all as specified and directed . Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Discharge Nozzles designed to provide the proper flow rate and distribution of Gas to total flood a hazard area : 180 deg. / 360 deg ( 10NB to 50NB ) complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens /Rotarex
Supply, Installation, Testing & Commissioning of Manifold of suitable length (M.S. Seamless to ASTM A-106, SCH 160) 4 way - 2" BW x sch 160, ASTM A-106 Gr.B. including necessary fittings complete all as specified and directed . Make: Fabricated to specifications
Supply, Installation, Testing & Commissioning of Actuation System including the following: a). 2kg M.S. Seamless Cylinder filled with CO2 gas along with wall/structure mountings. b). Cylinder valve for CO2 (DN12) actuation cylinder c). Manual Activation including mechanical box - 02 Nos, SS wire - 24 Mtrs, Aluminium Sleeve - 24 Mtrs, Corner Pulley - 12 Nos and End of Line - 4 Nos.
Supply, Installation, Testing & Commissioning of MS Seamless pipe schedule 80 of pipe size 25mm dia with all fittings/fixtures, nut bolts, U clamps etc including cutting, welding, moulding, drilling etc with supporting structure all as specified and directed.
Supply, Installation, Testing & Commissioning of MS Seamless pipe schedule 80 of pipe size 32mm dia with all fittings/fixtures, nut bolts, U clamps etc iincluding cutting, welding, moulding, drilling etc with supporting structure all as specified and directed.
Supply, Installation, Testing & Commissioning of MS Seamless pipe schedule 80 of pipe size 50mm dia with all fittings/fixtures, nut bolts, U clamps etc including cutting, welding, moulding, drilling etc with supporting structure all as specified and directed.
Material and labour for Cross arms, bracings, supports, clamps and back plates fabricated from structural steel sections including nuts, bolts, washers, welding, bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint all as specified and directed.
Supply, Installation, Testing & Commissioning of 3 Zone Automatic Gas Extinguishing Panel, supports 3 conventional detection zones and 1 flooding/extinguishing zone. Designed and approved for EN 54-2, 4, & 13, EN12094-1 by BSI complete all as specified and directed. Make: CEASEFIRE/ADVANCE/LST
Supply, Installation, Testing & Commissioning of Manual Release Switch compatible with Rapid-Sense 3 Zone Automatic Gas Extinguishing Panel complete all as specified and directed.
Supply, Installation, Testing & Commissioning of Manual Abort Switch compatible with Rapid-Sense 3 Zone Automatic Gas Extinguishing Panel complete all as specified and directed
Supply, Installation, Testing & Commissioning of Conventional Rate of Rise Heat Detector, heat alarm threshold temperature 58°C, central LED for 360° status visibility complete all as specified and directed
Supply, Installation, Testing & Commissioning of A Conventional Detector Mounting Base associated with the CDX Range of Detectors and Beacons and is fully compatible with conventional fire alarm control panels complete all as specified and directed. Make: CEASEFIRE/ADVANCE/LST
Supply, Installation, Testing & Commissioning of Conventional Photoelectric Smoke Detector (White), fully compatible with the Conventional systems. A third terminal provides an integral remote indicator output complete all as specified and directed
Supply, Installation, Testing & Commissioning of Conventional Wall Sounder with Beacon, 3 level of volume adjustment, 32 recognised tones, 100 dB(A) output @1M, IP 65, EN 54-3, EN 54-23, LPCB complete all as specified and directed. Make: CEASEFIRE/ADVANCE/LST
Supply, Installation, Testing & Commissioning of Supply of 2C x 1.5 Sq.mm FRLS PVC insulated copper conductor armoured cable complete all as specified and directed. Make: POLYCAB/KEI/FINOLEX
Supply, Installation, Testing & Commissioning of Non-Return Valve suitable for pilot line complete all as specified and directed
Supply, Installation, Testing & Commissioning of constant pressure regulator which is used to reduce the agent pressure comes out from high pressurecylinder which is filled at 300 or 200 bar complete all as specified and directed. Make: Ceasefire/Fiwarec/Siemens
Supply ,installation , testing and commissioning of single phase online Inverter/UPS of cap 4 KVA , sinewave technology, with FOUR Nos. tall tubular batteries of cap 12 volt,150 AH each including initial charging and filled with electrolyte ( 12 x 4 =48 volt ) complete with all safety measures, requisite copper cable connection and brass connectors complete all as specified and as directed. Make - Luminious , Model-Cruze,/Microtech
Final Testing , commissining and proper resetting the entire system after insttalation of all items for checking proper working of entire system . Testing should be in presence of user rep , Engr-in -Charge.Clearance certificate issued by fire safety officer of approved agencies or central govt/state govt is to be submitted by the contractor after testing.The charges/ fees for fire safety officer of central govt/state govt is to be born by contractor. Note :- 1. Layout plan of Gas suppression system showing all the items should be approved before starting the work. 2. If any additional items which are not included in the BOQ /CA ,and required for making proper functioning the rate for the same may be included in the quoted rate.
SKYLIGHT INNOVATIONS
FIRE PROTECTION SYSTEM
MINOS SOLUTIONS PRIVATE LIMITED
KnowledgeOps Software Solutions Private Limited
TRIVENI CONSTRUCTIONS
ROHINI TRADELINKS PRIVATE LIMITED
shree balaji builders
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .