Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC 13TH FLOOR DN 18 SALTEE TECH PARK COLLEGE MORE SALT LAKE KOLKATA 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹5.4 Cr+₹1.1 Cr (26.1%)Rejected-Finance 40 1 SY NO 592 AND 124 JIGANI INDUSTRIAL AREA 1ST PHASE JIGANI ANEKAL TALUK BENGALURU RURAL BANGALORE KARNATAKA 560105 | BENGALURU URBAN | KARNATAKA | 560105 | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.8 Cr+₹1.5 Cr (35.6%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹6.9 Cr
EMD Value
₹13.7 L
Closing Date
10 Sept 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er. Gurpreet Singh Bhains
Office of the Executive Engineer, Electrical Division No. 1, Sector-9,Chandigarh.
Providing Flood Lighting for Athletic Track at Sports Complex, Sector-7, Chandigarh.
2026_CHD_94860_1
E1/TN-294
Open Tender
Electrical Works
Percentage
120 days
Chandigarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13.7 L
Chandigarh
20 Nov 2026
17 Aug 2026
10 Sept 2026
17 Aug 2026
10 Sept 2026
25 Aug 2026
25 Aug 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, supply, installation, testing and commissioning of High Power LED Sports Light Luminaires with non-integral drivers of suitable wattage, complete with the following specifications.,(As per Complete Item No. 1 of the DNIT). | 1 | Per.Job | 5,22,76,478 | ₹5,22,76,478 |
| 2 | SITC of High Mast Pole with Head Frame
The firm shall carry out the complete design, supply, installation, testing and commissioning of the High Mast System in accordance with the following design parameters and the requirements of the Department.,(As per Complete Item No. 2 of the DNIT). | 4 | Each | 21,95,030 | ₹87,80,120 |
| 3 | Supply, Fabrication, Erection, Testing and Commissioning of Double Door Feeder Pillar Panel, outdoor type, minimum IP54 conforming to IEC 60529/IS 12063, suitable for 415 V, 3-Phase, 4-Wire, 50 Hz AC supply system, complete with RCC foundation, cable termination and all associated accessories.,(As per Complete Item No. 3 of the DNIT). | 4 | Per.Job | 1,43,328 | ₹5,73,312 |
| 4FOUNDATION FOR 35 MTR. LONG HIGH MAST: Design and casting of suitable raft-type foundation for the High Mast complete with all civil works, as per the specifications under S. No. 1 above. The foundation shall be designed based on the Safe Bearing Capacity (SBC) of the soil as per the soil investigation report. (As per Complete Item No. 4 of the DNIT). | |||||
| 4.01 | All kinds of soil (Size 6.2m x 6.2m x 3.3m= 126.85 cum) (4 nos. x 126.85= 507.40 cum) | 507.4 | Per Cum | 253 | ₹1,28,372.2 |
| 4.02 | DSR Item No. 4.1.11 (Civil Work)Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: | - | - | - | - |
| 4.03 | 1:5:10 (1 cement: 5 fine sand derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Size: 6.2m x 6.2m x 0.10m =3.84 cum.(4 nos. x 3.84= 15.37 cum) | 15.37 | Per Cum | 6,023 | ₹92,573.51 |
| 4.04 | DSR Item No. 5.22.6 (Civil Work) Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 8,632 | Per.Kg | 105 | ₹9,06,360 |
| 4.05 | DSR Item No. 5.2.2 (Civil Work) Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: | - | - | - | - |
| 4.06 | 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources)Size 6.0 x 6.0 x 0.6 = 21.60 cumSize 3.9 x 3.9 x 0.5 = 07.60 cumSize 1.8 x 1.8 x 1.9 = 06.15 cumTotal (21.60 + 7.60 + 6.15 = 35.35 cum.)(4 Nos. x 35.35 = 141.40 cum) | 141.4 | Per Cum | 10,560 | ₹14,93,184 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.32 MB
BOQ_116412.xls
BOQ • 0.29 MB
Axxexure-1.pdf
Tender Documents • 0.32 MB
294c.pdf
PDF • 0.75 MB
294c.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .