| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.7 L+₹25,098.09 (10.1%)Rejected-AOC | ₹2.7 L+₹25,098.09 (10.1%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | BALAMURUGAN ENTERPRISES L2 | SRI ABIRAMI ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | 1. Dismantling the damaged Brick wall as per Instruction of departmental officers..including all initial lead and lift etc complete. | 2.5 | M³ | 300 ₹751.2 | 283 ₹708.63 Lowest |
| 2.00 | 2. Earthwork excavation in all soils including all initial lead and lift etc complete. | 5 | M³ | 150 ₹750.3 | 135 ₹675.27 Lowest |
| 3.00 | 3. Providing plain cement concrete 1:4:8 using 40mm hbg metal including all cost etc complete | 3.5 | M³ | 5,350 ₹18,708.95 | 5,338 ₹18,666.99 Lowest |
| 4.00 | 4. Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block, Staircase waist and landing slabs landing beams, canopy etc., in all floor with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm X 25 X 3mm for boarding laid over country wood joinsts of size 10cm X 6.50 cm spaced at about 90cm C/C and supports by Causrina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123 | 13 | M³ | 1,100 ₹14,300 | 1,045 ₹13,585 Lowest |
| 5.00 | 5. Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M Sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 1.5 | M³ | 9,200 ₹13,803.68 | 9,181 ₹13,775.17 Lowest |
| 6.00 | 6. Supplying and fabricating and placing in postion MS or RTS Bar reinforcement to all RCC Works as per the design given including cost of steel and bending wire also all floors. | 1.5 | Qtl | 9,200 ₹13,800 | 9,152 ₹13,728 Lowest |
| 7.00 | 7. Fly ash Brick work in CM 1:5 (one cement & five sand) using size 9"X4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification | 4.5 | M³ | 7,100 ₹31,967.04 | 7,093 ₹31,935.52 Lowest |
| 8.00 | 8. Plastering in CM 1:5 to 12 mm thick incuding all cost etc complete. | 100 | M² | 500 ₹50,000 | 290 ₹29,000 Lowest |
| 9.00 | 9. Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel
reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x
102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals. Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug. | 4.5 | M² | 9,000 ₹40,500 | 8,313 ₹37,408.5 Lowest |
| 10.00 | 10. Supply and fixing of mild steel door using all round "L" angle 25 X 25 X 6mm thick, cross bracing 20 X 6mm M.S.Flat with necessary locking arrangements including cost and conveyance etc., Size : 0.60 X 1.85 = 1.11 m2 | 2.56 | M2 | 1,496 ₹3,829.76 Lowest | 1,496 ₹3,829.76 Lowest |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
19 Mar 2025, 3:00 pmClosed
Assistant Commissioner
westzone, coimbatore corporation
Mainteniance and Repair work to the Division Office at Madathur Junction Thiyagi kumaran nagar in Ward No 41of West Zone.
2025_MAWS_531810_24
E7/WESTZONE/2025
Open Tender
Civil Works
Works
90 days
westzone, coimbatore corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹3,000
11 May 2026
12 Mar 2025
20 Mar 2025
12 Mar 2025
19 Mar 2025
12 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
BOQ_633191.xls
BOQ • 0.33 MB
Building.pdf
Tender Documents • 0.68 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .