| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.0 LAccepted-AOC | ₹67.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹74.1 LRejected-Finance NULL | ₹74.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹77.9 LRejected-Finance | ₹77.9 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M. Vettivelan L3 | RAHUL L1 | R BALAKRISHNAN L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of Storm water Drain | ||||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 815 | m3 | 110 ₹89,650 | 96.5 ₹78,647.50 | 106.8 ₹87,042 |
| 1.02 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) | 117 | m3 | 5,400 ₹6.3 L | 4,963.6 ₹5.8 L | 5,489.7 ₹6.4 L |
| 1.03 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 1,989 | m2 | 617 ₹12.3 L | 361.1 ₹7.2 L | 399.4 ₹7.9 L |
| 1.04 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M- Sand) and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 262 | m3 | 5,690 ₹14.9 L | 5,105 ₹13.4 L | 5,646.2 ₹14.8 L |
| 1.05 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 728 | m2 | 585 ₹4.3 L | 521.1 ₹3.8 L | 576.3 ₹4.2 L |
| 1.06 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 116 | m3 | 7,965 ₹9.2 L | 7,094.7 ₹8.2 L | 7,846.8 ₹9.1 L |
| 1.07 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 8,700 | kg | 92 ₹8.0 L | 80.8 ₹7.0 L | 89.4 ₹7.8 L |
| 1.08 | Supplying and fixing of rubber moulded grey premimum concrete kerb of size 450x100x300mm using M30 concrete. The concrete shall be moulded by table mount vibrate with polypropylene fibers at 5pct.and curing compound. The rate shall include cost of all materials, transportation,moulding charges, loading, unloading charges and pointing with CM 1:3 to full depth curing thread lining etc., complete as directed by the departmental officers. - 100CFT | 970 | m | 460 ₹4.5 L | 495 ₹4.8 L | 547.5 ₹5.3 L |
| 1.09 | Paving pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm
thick of approved quality and colour laid in accordance with IS 1443 in Cement Mortar 1:3 (One Cement and Three crushed stone sand), with required Cement Slurry and Mortar Plasticizer, 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) | 1,151 | m2 | 1,490 ₹17.1 L | 1,356.4 ₹15.6 L | 1,500.2 ₹17.3 L |
Tender Value
Refer Docs
EMD Value
₹94,000
Closing Date
22 Dec 2025, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Construction of Storm water Drain at Collectorate junction to Chettikulam junction (Left Side)
2025_MAWS_630158_1
18/2025-26/CE_15th CFC
Open Tender
Civil Works
90 days
Nagercoil Corporation Construction of Storm water
Registered Contractor
4 documents required · 4 mandatory
₹0
₹94,000
City Municipal Corporation Office Nagercoil
31 Jan 2026
8 Dec 2025
22 Dec 2025
8 Dec 2025
22 Dec 2025
8 Dec 2025
15 Dec 2025
Amount
Construction of Storm water Drain
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28)
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M- Sand) and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309)
Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Supplying and fixing of rubber moulded grey premimum concrete kerb of size 450x100x300mm using M30 concrete. The concrete shall be moulded by table mount vibrate with polypropylene fibers at 5pct.and curing compound. The rate shall include cost of all materials, transportation,moulding charges, loading, unloading charges and pointing with CM 1:3 to full depth curing thread lining etc., complete as directed by the departmental officers. - 100CFT
Paving pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in accordance with IS 1443 in Cement Mortar 1:3 (One Cement and Three crushed stone sand), with required Cement Slurry and Mortar Plasticizer, 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
R BALAKRISHNAN (BID ID -1541842)
M. Vettivelan (BID ID -1541119)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_753559.xls
BOQ • 0.28 MB
bid-doc-18.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid