| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | ₹4.9 L | L1 | Accepted-Finance as per financial evaluation |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance as per financial evaluation |
| Sl No | Description | Qty | Unit | SKP AND CO L2 | AJS Contractors L1 |
|---|---|---|---|---|---|
| 1.00Providing cover slab for open drain from pethanur common well to Manickam house at Pethanur H/o Dhalavaipatty | |||||
| 2.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,. complete | 117.6 | sqm | 560 ₹65,856 | 543.42 ₹63,906.19 |
| 3.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1.18 | Mt | 91,870.5 ₹1.1 L | 91,858.5 ₹1.1 L |
| 4.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 26.46 | sqm | 9,215.6 ₹2.4 L | 9,202.6 ₹2.4 L |
| 5.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 75,259 ₹75,259 | 74,844 ₹74,844 |
Tender Value
₹5.0 L
EMD Value
₹4,980
Closing Date
5 Dec 2025, 3:00 pmClosed
Senthilmurugan V
BDO Office, Salem
Salem Block -Union General Fund 2025-26- Providing cover slab for open drain from pethanur common well to Manickam house at Pethanur H/o Dhalavaipatty
2025_RDTN_627213_1
1281/2022/A2
Open Tender
Civil Works - Others
30 days
BDO Office
as per document
3 documents required · 3 mandatory
₹0
₹4,980
Yes
12 Jan 2026
28 Nov 2025
5 Dec 2025
28 Nov 2025
5 Dec 2025
28 Nov 2025
Amount
Providing cover slab for open drain from pethanur common well to Manickam house at Pethanur H/o Dhalavaipatty
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,. complete
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SKP AND CO (BID ID -1524725)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
08.pdf
Tender Documents • 0.78 MB
BOQ_749927.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid