| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-Finance | ₹3.2 L | 1 | Accepted-Finance Accepted |
| 2 | 2₹4.6 LAccepted-Finance | ₹4.6 L | 2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Satyawan Singh Contractor L1 | J.C. Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Regular Operation and Maintenance of Water Supply Scheme (Through canal water supply) and mud pumps with material at Udyog Vihar Ph-I, II & Residencial colony. Contractor have to undertake the following activities:- (a). Regular supervision and de-silting of inlet channel (minimum 15 days)/pipe line from canal to storage tank and to ensure adequate storage of raw water. (b). To maintain slow/sand filter, clearing the overburden, on filter media at regular intervals (minimum 15 days). (c)Operating pumping sets to lift water from storage tank to slow and sand filter as per requirement of the area. (d)Operation & maintenance of pumping sets connecting CWR to SR as per requirement of the area. (e) Regular maintenance of pipeline for rising main, distribution, sluice valve etc. of complete water supply scheme including removing of leakage as and when required & including jointing material. | 12 | Complete Job Per month | 11,000 ₹1.3 L | 13,000 ₹1.6 L |
| 2.00 | Repair & maintenance of existing distribution / rising main pipe line system consisting of AC Pressure Pipeline / PVC/uPVC/HDPE/CI/ DI Lines for maintaining smooth water supply in area covered under the scope of work.The scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of Bituminous / Cement Concrete / WBM / WMM surface at any site of work at no extra cost.It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T&P and jointing materials, however the pipe line and sluice valves (if required) etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of any material or transportation charges. | 12 | Complete Job Per month | 11,000 ₹1.3 L | 13,000 ₹1.6 L |
| 3.00 | Regular operation and maintenance of pump houses located at WSS Complex/Complexes.The work includes operation of distribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal / Monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pump sets with regular up-keepment of log books, repair of leakages in pump glans and MS/CI/AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge | 12 | Per pump house per month | 4,300 ₹51,600 | 12,500 ₹1.5 L |
Tender Value
₹3.4 L
EMD Value
₹6,864
Closing Date
22 May 2026, 6:00 pmClosed
Udyog Vihar, Sriganganagar
OFFICE OF THE REGIONAL MANAGER RIICO, UDYOG VIHAR, SRIGANGANAGAR
Regular Operation and Maintenance of Water Supply Scheme and Mud Pump at Industrial Area Udyog Vihar Ph-I and II, Sriganganagar
2026_RIICO_559490_1
09/2026-27/(A)
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
365 days
UDYOG VIHAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
RIICO LTD.,
₹6,864
Yes
25 May 2026
15 May 2026
25 May 2026
15 May 2026
22 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Regular Operation and Maintenance of Water Supply Scheme (Through canal water supply) and mud pumps with material at Udyog Vihar Ph-I, II & Residencial colony. Contractor have to undertake the following activities:- (a). Regular supervision and de-silting of inlet channel (minimum 15 days)/pipe line from canal to storage tank and to ensure adequate storage of raw water. (b). To maintain slow/sand filter, clearing the overburden, on filter media at regular intervals (minimum 15 days). (c)Operating pumping sets to lift water from storage tank to slow and sand filter as per requirement of the area. (d)Operation & maintenance of pumping sets connecting CWR to SR as per requirement of the area. (e) Regular maintenance of pipeline for rising main, distribution, sluice valve etc. of complete water supply scheme including removing of leakage as and when required & including jointing material. | 12 | Complete Job Per month | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Repair & maintenance of existing distribution / rising main pipe line system consisting of AC Pressure Pipeline / PVC/uPVC/HDPE/CI/ DI Lines for maintaining smooth water supply in area covered under the scope of work.The scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of Bituminous / Cement Concrete / WBM / WMM surface at any site of work at no extra cost.It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T&P and jointing materials, however the pipe line and sluice valves (if required) etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of any material or transportation charges. | 12 | Complete Job Per month | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Regular operation and maintenance of pump houses located at WSS Complex/Complexes.The work includes operation of distribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal / Monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pump sets with regular up-keepment of log books, repair of leakages in pump glans and MS/CI/AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge | 12 | Per pump house per month | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tabdc.pdf
Other Document • 7.51 MB
TformA.pdf
Tender Documents • 0.19 MB
BOQ_996033.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid