Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹1,389.76 (1.00%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.4 L+₹2,779.52 (2.00%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹3,000
Closing Date
2 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.C.E (SWM-I)
48, MARKET STREET Kolkata-700 087 West Bengal
CONSTRUCTION OF R.C.C UNDER GROUND WATER RESERVOIR ALONG WITH PUMP ROOM AT DIST.-I GARAGE,UNDER SWM-II.
2026_KMC_1045293_1
SWM-I/SKP/31/2026-2027
Open Tender
CIVIL WORKS
Percentage
35 days
DIST.-I GARAGE
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹3,000
23 Nov 2026
9 Oct 2026
4 Nov 2026
12 Oct 2026
2 Nov 2026
13 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.11 | %M3 | 11,927 | ₹1,357.89 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | 5.7 | M3 | 447 | ₹2,547.9 |
| 3 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof. | 0.83 | M3 | 1,956 | ₹1,613.7 |
| 4 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 6 | SQM | 358 | ₹2,148 |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion | 0.6 | M3 | 4,572 | ₹2,743.2 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. ( Ref :PWD (Bldg.)-2017, It. No. 40, Page No. 43 Annexture-I , Format-B, & 2nd Corrigenda Addenda dtd-04.06.2018, p-1,2, I-43) | 0.25 | MT | 70,426.38 | ₹17,675.4 |
| 7 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 2.76 | M3 | 6,216 | ₹17,156.16 |
| 8 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36.Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work | 16.85 | SQM | 369 | ₹6,217.65 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 17. 125 mm. thick brick work with 1st class bricks in cement mortar (1:3) in ground floor. | 24.4 | SQM | 753 | ₹18,373.2 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor | 0.5 | M3 | 5,798 | ₹2,899 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_2562660.xls
BOQ • 0.37 MB
form.pdf
Tender Documents • 1.02 MB
drawing.pdf
Tender Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .