Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC | ₹10.2 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹10.2 L+₹914.66 (0.09%)Rejected-Finance | ₹10.2 L+₹914.66 (0.09%) | L2 | Rejected-Finance Highest Rate |
Tender Value
₹12.0 L
EMD Value
₹24,000
Closing Date
18 Feb 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER, RURAL ENGINEERING DEPARTMENT, DIVISION DEORIA
GHUSWA UDAYPURA MARG SE PRATHAMIK VIDYALAY JANE WALI MARG KA CC ROAD NIRMAN KARYA
2026_REDUP_1114918_1
1695/RED DEORIA/E-TENDER/2025-26. DATED 07.01.2026
Open Tender
Civil Works
Percentage
120 days
DEORIA
Please Refer Tender Document
2 documents required · 2 mandatory
₹766
₹24,000
Yes
21 Sept 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Foundation in ordinary soil including lift upto 1.5 m as per S.I. No.-251 | 15.21 | Cum | 114 | ₹1,733.94 |
| 2 | Cement Concrete with 4.0 cm gauge brick ballast fine sand of 1.25 fineness modulus and cement in the proportion 12:6:1 in foundation and under floors including supply of all Materials labour and Tools and plants etc. required for the proper Completion of work. As Per S.I. No.-273 | 7.6 | Cum | 3,011.5 | ₹22,902.46 |
| 3 | Providing, laying and spreading and compacting stone ballast of specific Sizes to Water bound mecadam speci. inc. spreading in uniform thickness, hand packing,rolling with theree wheel 8-10 ton static roller in stages 2 proper grade and camber, applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical spec. clause 405.3 compacted thickness 75 mm | 38.97 | Cum | 4,881.39 | ₹1,90,244.56 |
| 4 | Class 150 sub class A brick work in 1:4 cement and sand mortar in foundation and plinth including supply of aii matarials , labour and T&P etc required for the proper completion of the work As Per S.I. No.-305 | 11.66 | Cum | 4,327.25 | ₹50,455.74 |
| 5 | Providing and laying 125 micron polysheet on road top over PCC in respect of all complete | 557.7 | Sqm | 22.71 | ₹12,662.58 |
| 6 | Laying Cement Concrete on Base Road Top with 2.0 cm gauge Stone ballast,coarse sand and cement in the proportion 3:1.5:1 over prepared subgrade including supply of all materials labour and tools and plants etc. required for the proper completion of work S.I.No. 773(2) | 83.66 | cum | 8,692.5 | ₹7,27,171.09 |
| 7 | Making of Construction Joint | 184.8 | Rm | 35.42 | ₹6,544.88 |
| 8 | Sign Board/Photography of Site | 1 | job | 5,700 | ₹5,700 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_2068128.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .