| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.3 LAccepted-AOC BAMUNIMAIDAM MRD ROAD HOUSE NO 48 CITY GUWAHATI PO BAMINIMAIDAM PS NOONMATI DISTRICT KAMRUP METRO PIN 781021 | KAMRUP METRO | ASSAM | 781021 | ₹46.3 L | L1 | Accepted-AOC Awarded Contract Bidder |
| 2 | L2₹53.6 LRejected-Finance GALIAHATI HOUSE NO 34 CITY TOWN BARPETA P O BARPETA P S BARPETA DIST BARPETA PIN 781301 | BARPETA | ASSAM | 781301 | ₹53.6 L | L2 | Rejected-Finance Rejected as L2 |
| Sl No | Description | Qty | Unit | NIRMAL PATHAK L2 | M/S Prakalpa L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801
a) 600mm Equilateral triangle
ii) Br. No. 6/1 on Fullung Bezera Road | 2 | Each | 4,000 ₹8,000 | 6,000 ₹12,000 |
| 2.00 | Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801
a) 600mm Equilateral triangle
i) Br. No. 3/1 on Fullung Bezera Road | 2 | Each | 4,000 ₹8,000 | 6,000 ₹12,000 |
| 3.00 | Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801
b) 600mm Circular
ii) Br. No. 6/1 on Fullung Bezera Road | 2 | Each | 5,300 ₹10,600 | 6,000 ₹12,000 |
| 4.00 | Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801
b) 600mm Circular
i) Br. No. 3/1 on Fullung Bezera Road | 2 | Each | 5,300 ₹10,600 | 6,000 ₹12,000 |
| 5.00 | Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801
c) 600mm x 450mm Rectangular
ii) Br. No. 6/1 on Fullung Bezera Road | 2 | Each | 5,200 ₹10,400 | 6,000 ₹12,000 |
| 6.00 | Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801
c) 600mm x 450mm Rectangular
i) Br. No. 3/1 on Fullung Bezera Road | 2 | Each | 5,200 ₹10,400 | 6,000 ₹12,000 |
| 7.00 | Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm of 12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1
ii) Br. No. 6/1 on Fullung Bezera Road | 1 | Each | 26,373.62 ₹26,373.62 | 12,000 ₹12,000 |
| 8.00 | Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm of 12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1
i) Br. No. 3/1 on Fullung Bezera Road | 1 | Each | 26,373.62 ₹26,373.62 | 12,000 ₹12,000 |
| 9.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications.
ii) Br. No. 6/1 on Fullung Bezera Road | 2.33 | Sqm | 600 ₹1,399.80 | 2,500 ₹5,832.50 |
| 10.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications.
i) Br. No. 3/1 on Fullung Bezera Road | 2.33 | Sqm | 600 ₹1,399.80 | 2,500 ₹5,832.50 |
Tender Value
₹52.2 L
EMD Value
₹1.0 L
Closing Date
10 Nov 2025, 2:00 pmClosed
Chief Engineer (EAP), PWRD
O/o the Chief Engineer (EAP), PWRD, Fatasil Ambari
CE/EAP/ARRBP/OCB/Bridges-2/Kamrup/25 Construction of Bridges in Kamrup district i) Br. No. 3/1 on Fullung Bezera Road ii) Br. No. 6/1 on Fullung Bezera Road
2025_PWRDW_48257_5
CE/EAP/693196/03
Open Tender
Civil Works - Bridges
540 days
Kamrup
Please refer Tender documents
7 documents required · 7 mandatory
₹1,000
Yes
₹1.0 L
Yes
23 Jun 2026
28 Oct 2025
10 Nov 2025
28 Oct 2025
10 Nov 2025
28 Oct 2025
28 Oct 2025 - 3 Nov 2025
Amount
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801 a) 600mm Equilateral triangle ii) Br. No. 6/1 on Fullung Bezera Road
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801 a) 600mm Equilateral triangle i) Br. No. 3/1 on Fullung Bezera Road
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801 b) 600mm Circular ii) Br. No. 6/1 on Fullung Bezera Road
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801 b) 600mm Circular i) Br. No. 3/1 on Fullung Bezera Road
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801 c) 600mm x 450mm Rectangular ii) Br. No. 6/1 on Fullung Bezera Road
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per approved drawings and Technical Specification Clause 801 c) 600mm x 450mm Rectangular i) Br. No. 3/1 on Fullung Bezera Road
Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm of 12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 ii) Br. No. 6/1 on Fullung Bezera Road
Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm of 12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 i) Br. No. 3/1 on Fullung Bezera Road
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications. ii) Br. No. 6/1 on Fullung Bezera Road
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications. i) Br. No. 3/1 on Fullung Bezera Road
Providing and fixing of road stud 100x100 mm die cast in aluminium, restant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic suface by drilling holes 30 mm upto a depth of 600mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973. ii) Br. No. 6/1 on Fullung Bezera Road
Providing and fixing of road stud 100x100 mm die cast in aluminium, restant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic suface by drilling holes 30 mm upto a depth of 600mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973. i) Br. No. 3/1 on Fullung Bezera Road
Reinforced cement concrete M15 grade of boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering as per drawing and technical specification clause 1704. ii) Br. No. 6/1 on Fullung Bezera Road
Reinforced cement concrete M15 grade of boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering as per drawing and technical specification clause 1704. i) Br. No. 3/1 on Fullung Bezera Road
Dismantling guard rails by manual means and disposal of dismantled material with all lifts and lead, stacking serviceable materials and unserviceable materials separately as per Technical Specification Clause 202. ii) Br. No. 6/1 on Fullung Bezera Road
Dismantling guard rails by manual means and disposal of dismantled material with all lifts and lead, stacking serviceable materials and unserviceable materials separately as per Technical Specification Clause 202. i) Br. No. 3/1 on Fullung Bezera Road
Dismantling kerb stones by manual means and disposal of dismantled material with all lifts and lead as per Technical Specification Clause 202. ii) Br. No. 6/1 on Fullung Bezera Road
Dismantling kerb stones by manual means and disposal of dismantled material with all lifts and lead as per Technical Specification Clause 202. i) Br. No. 3/1 on Fullung Bezera Road
Chipping of detoriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement following by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete. ii) Br. No. 6/1 on Fullung Bezera Road
Chipping of detoriorated concrete and removal of all loose & friable materials and fully exposing rusted reinforcement following by proper cleaning and removing of rusts and other foreign materials using sand blasting/ emery cloths/ wire brush etc. including formwork as directed and specified by the department complete. i) Br. No. 3/1 on Fullung Bezera Road
Removal of existing asphaltic wearing coat comprising of 50mm thick asphaltic concrete laid over 12 mm tick mastic asphalt including disposal with all lift and lead. ii) Br. No. 6/1 on Fullung Bezera Road
Removal of existing asphaltic wearing coat comprising of 50mm thick asphaltic concrete laid over 12 mm tick mastic asphalt including disposal with all lift and lead. i) Br. No. 3/1 on Fullung Bezera Road
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer :TATA /SAIL/Esser Steel/Jindal steel/ Shyam steel/RINL) in superstructure complete as per drawings and technical specifications clauses 1002, 1010 & 1202. ii) Br. No. 6/1 on Fullung Bezera Road
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer :TATA /SAIL/Esser Steel/Jindal steel/ Shyam steel/RINL) in superstructure complete as per drawings and technical specifications clauses 1002, 1010 & 1202. i) Br. No. 3/1 on Fullung Bezera Road
Drilling 32 mm dia hole and upto depth of 400 mm and grounting with epoxy resin of reinforcement steel of 25 mm dia of all manpower and equipments complete in all respect. ii) Br. No. 6/1 on Fullung Bezera Road
Drilling 32 mm dia hole and upto depth of 400 mm and grounting with epoxy resin of reinforcement steel of 25 mm dia of all manpower and equipments complete in all respect. i) Br. No. 3/1 on Fullung Bezera Road
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification including steel shuttering formwork. Without Plasticiser RCC/PSC Grade M35 Using Concrete Mixer For T-beam & Slab Height upto 5m ii) Br. No. 6/1 on Fullung Bezera Road
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification including steel shuttering formwork. Without Plasticiser RCC/PSC Grade M35 Using Concrete Mixer For T-beam & Slab Height upto 5m i) Br. No. 3/1 on Fullung Bezera Road
Epoxy Bonding of new concrete to old concrete. ii) Br. No. 6/1 on Fullung Bezera Road
Epoxy Bonding of new concrete to old concrete. i) Br. No. 3/1 on Fullung Bezera Road
Drainage Spouts complete as per drawing and Technical specifications. ii) Br. No. 6/1 on Fullung Bezera Road
Drainage Spouts complete as per drawing and Technical specifications. i) Br. No. 3/1 on Fullung Bezera Road
Replacement of Expansion joints complete as per drawings ii) Br. No. 6/1 on Fullung Bezera Road
Replacement of Expansion joints complete as per drawings i) Br. No. 3/1 on Fullung Bezera Road
Providing and laying of an elastomeric slab seal expansion joint complete as per approved drawings and approved specification to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturers instructions for installation and as per technical specification clause 1207.2.5 ii) Br. No. 6/1 on Fullung Bezera Road
Providing and laying of an elastomeric slab seal expansion joint complete as per approved drawings and approved specification to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturers instructions for installation and as per technical specification clause 1207.2.5 i) Br. No. 3/1 on Fullung Bezera Road
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. M 40 grade concrete ii) Br. No. 6/1 on Fullung Bezera Road
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. M 40 grade concrete i) Br. No. 3/1 on Fullung Bezera Road
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per rawing and Technical Specifications ii) Br. No. 6/1 on Fullung Bezera Road
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per rawing and Technical Specifications. i) Br. No. 3/1 on Fullung Bezera Road
Painting Two Coats on New Concrete Surfaces Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per drawing and technical specification Clause 1701 ii) Br. No. 6/1 on Fullung Bezera Road
Painting Two Coats on New Concrete Surfaces Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per drawing and technical specification Clause 1701 i) Br. No. 3/1 on Fullung Bezera Road
Non-destructive tecting with Rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the finding in proper comprehensible format . ii) Br. No. 6/1 on Fullung Bezera Road
Non-destructive tecting with Rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the finding in proper comprehensible format. i) Br. No. 3/1 on Fullung Bezera Road
Non-destructive tecting with Ultrasonic Pulse velocity Meter with Data Storage facility for detection of cracks voids and other imperfections in Reinforced concrete structures and furnishing the finding thereof in proper comprehensible format complete as directed by the Department. ii) Br. No. 6/1 on Fullung Bezera Road
Non-destructive tecting with Ultrasonic Pulse velocity Meter with Data Storage facility for detection of cracks voids and other imperfections in Reinforced concrete structures and furnishing the finding thereof in proper comprehensible format complete as directed by the Department. i) Br. No. 3/1 on Fullung Bezera Road
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling with approved material. Ordinary Soil Mechanical means With Dewatering Upto 3m depth ii) Br. No. 6/1 on Fullung Bezera Road
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling with approved material. Ordinary Soil Mechanical means With Dewatering Upto 3m depth i) Br. No. 3/1 on Fullung Bezera Road
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 25 kg beyond curtain wall ii) Br. No. 6/1 on Fullung Bezera Road
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 25 kg beyond curtain wall i) Br. No. 3/1 on Fullung Bezera Road
Providing concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifications Clause 802, 803, 1202 & 1203. With Crushed Stone Nominal mix (1:2.5:5) ii) Br. No. 6/1 on Fullung Bezera Road
Providing concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifications Clause 802, 803, 1202 & 1203. With Crushed Stone Nominal mix (1:2.5:5) i) Br. No. 3/1 on Fullung Bezera Road
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. I - Without Plasticiser A - PCC Grade M-15 ii) Br. No. 6/1 on Fullung Bezera Road
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. I - Without Plasticiser A - PCC Grade M-15 i) Br. No. 3/1 on Fullung Bezera Road
Planting of trees and their Maintenance for three year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/ sludge mannure, planting the saplings, backfilling the trenches, watering, fixing the tree guard and maintaining the plants for three year. ii) Br. No. 6/1 on Fullung Bezera Road
Planting of trees and their Maintenance for three year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/ sludge mannure, planting the saplings, backfilling the trenches, watering, fixing the tree guard and maintaining the plants for three year. i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Ambient Air Monitoring: At pre-construction Stage: At minimum 2 locations (twice a week) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Ambient Air Monitoring: At pre-construction Stage: At minimum 2 locations (twice a week) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Ambient Air Monitoring: At construction Stage: At minimum 2 locations including construction camp (Two consecutive day) (Twice a week) (Biannually) for one year (Total 8 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Ambient Air Monitoring: At construction Stage: At minimum 2 locations including construction camp (Two consecutive day) (Twice a week) (Biannually) for one year (Total 8 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: At Operation Stage: At 2 locations (Two consecutive day) (Twice a week) (Biannually) for one year (Total 8 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: At Operation Stage: At 2 locations (Two consecutive day) (Twice a week) (Biannually) for one year (Total 8 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Water Monitoring: At pre-construction Stage: At minimum 2 locations (2 samples) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Water Monitoring: At pre-construction Stage: At minimum 2 locations (2 samples) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Water Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year (Total 4 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Water Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year (Total 4 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: At Operation Stage: At 2 locations (except monsoon) (Biannually) (Total 4 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: At Operation Stage: At 2 locations (except monsoon) (Biannually) (Total 4 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Noise Monitoring: At Pre-Construction Stage At minimum 2 locations ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Noise Monitoring: At Pre-Construction Stage At minimum 2 locations i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Noise Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year (Total 4 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Noise Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year (Total 4 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Noise Monitoring: At Operation stage: At 2 locations (except monsoon) (Biannually) (Total 4 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Noise Monitoring: At Operation stage: At 2 locations (except monsoon) (Biannually) (Total 4 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Soil Monitoring At Pre-Construction Stage: At minimum 2 locations ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Soil Monitoring At Pre-Construction Stage: At minimum 2 locations i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Soil Monitoring At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year (Total 4 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Soil Monitoring At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year (Total 4 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Soil Monitoring At Operation Stage: At 2 locations (except monsoon) (Biannually) (Total 4 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Soil Monitoring At Operation Stage: At 2 locations (except monsoon) (Biannually) (Total 4 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Ecology: At construction stage At 2 locations (bi-annually) for one year (Total 4 samples) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Ecology: At construction stage At 2 locations (bi-annually) for one year (Total 4 samples) i) Br. No. 3/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Ecology: At Operation Stage: At 2 locations (bi-annually) (Total 4 samples in 1 year) ii) Br. No. 6/1 on Fullung Bezera Road
Implementation of Environmental and Social Management Plan: Ecology: At Operation Stage: At 2 locations (bi-annually) (Total 4 samples in 1 year) i) Br. No. 3/1 on Fullung Bezera Road
Community meetings in village, 2 times. ii) Br. No. 6/1 on Fullung Bezera Road
Community meetings in village, 2 times. i) Br. No. 3/1 on Fullung Bezera Road
A Provisional sum (Fixed Amount) for the items of Occupational Health & Safety of Rs. 2,311.00 (not to be changed by the Bidders in BOQ) i) Br. No. 3/1 on Fullung Bezera Road
A Provisional sum (Fixed Amount) for the items of Occupational Health & Safety of Rs. 2,307.00 (not to be changed by the Bidders in BOQ) ii) Br. No. 6/1 on Fullung Bezera Road
NIRMAL PATHAK (BID ID -285515)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Drawings_Kamrup_25.pdf
Additional Documents • 3.01 MB
Technical_Specification.pdf
Additional Documents • 3.77 MB
Kamrup_25_ESMP.pdf
Additional Documents • 2.47 MB
LOT.pdf
Additional Documents • 0.16 MB
LOF.pdf
Additional Documents • 0.15 MB
Annexure-X.pdf
Additional Documents • 0.35 MB
SBD_Kamrup_25.pdf
Tender Documents • 1.40 MB
BOQ_76769.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid