Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹169.9 CrAdmitted-Finance SHIV SHAKTI VIHAR OPP 200 K POWER HOUSE JAIPUR ROAD BIKANER 334022 | BIKANER | BIKANER | RAJASTHAN | 334022 | L1 | Admitted-Finance | ||
| 2 | L2₹194.9 Cr+₹25.0 Cr (14.7%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee 52 118 SECTOR 5 PRATAPNAGAR SANGANER JAIPUR 302033 | JAIPUR | RAJASTHAN | 302033 | - | Not Admitted-Fee Fee not received | ||
| 4 | Not Admitted-Fee | - | Not Admitted-Fee Fee not received |
Tender Value
₹203.5 Cr
EMD Value
₹4.1 Cr
Closing Date
19 Sept 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE WR ZONE KOTA
CE WR ZONE KOTA
Strengthening of Parwati Main Canal of Parwati Canal System Tehsil Baran, district -Baran
2023_WRDAS_363781_1
CE WR ZONE KOTA NITNO-20-2023-24
Open Tender
Civil Works
Percentage
1095 days
BARAN
Please refer Tender documents.
3 documents required · 3 mandatory
₹40,000
40000 EE WR DIV.I BARAN
₹4.1 Cr
Yes
CE WR ZONE KOTA
26 Sept 2023
5 Sept 2023
20 Sept 2023
5 Sept 2023
19 Sept 2023
5 Sept 2023
11 Sept 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 18.1 Cutting and clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
18.1.1 Ordinary | 35,71,500 | sqm | 1.45 | ₹51,78,675 |
| 2 | Excavation including loading, unloading, disposal and dressing of
excavated earth within initial lead of 50m and lift up to 1.5m including
dressing of excavated area and dewatering wherever required complete in all respect
(b)Hard / dense soil | 2,94,557.13 | Cum | 95 | ₹2,79,82,927.35 |
| 3 | Excavation with line drilling, controlled blasting near structures,
populated area (situated within 50m) including dewatering, loading,
unloading, disposal and dressing within initial lead of 50m and lift upto
1.5m complete in all respect in dry or moist and also including
compensation of damages if any , in :
(a) Phylite and other hard rock requiring nominal blasting | 2,447.2 | Cum | 561 | ₹13,72,879.2 |
| 4 | 9.8 Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto
9.8.3 40 mm | 5,051 | cum | 5,092 | ₹2,57,19,692 |
| 5 | 9.8 Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto
9.8.4 20 mm | 19,329.67 | cum | 5,150 | ₹9,95,47,800.5 |
| 6 | 9.1 Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;
(For mix design Cement content considered 320 kg/ cum of concrete)
9.1.4 20 mm | 86,839.05 | cum | 5,775 | ₹50,14,95,513.75 |
| 7 | 9.2 Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;
(For mix design Cement content considered 400 kg/ cum of concrete)
9.2.4 20 mm | 9,646.15 | cum | 6,340 | ₹6,11,56,591 |
| 8 | 9.3 Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;
(For mix design Cement content considered 420 kg/ cum of concrete)
9.3.4 20 mm | 4,690.18 | cum | 6,600 | ₹3,09,55,188 |
| 9 | 10.9.2 Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using.
10.9.2.2 Tor or ribbed bars (IS :1786) | 22,42,693.88 | KG | 89 | ₹19,95,99,755.32 |
| 10 | 10.1 Side shuttering including propping etc. complete (to achieve finish F 2 for
10.1.3 Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 5,77,361.9 | sqm | 220 | ₹12,70,19,618 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.56 MB
Bid-Document.pdf
Tender Documents • 4.94 MB
BOQ_647351.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .