| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-Finance NO 9 1 3RD FLOOR RATHINAM KANNUSAMY COMPLEX AGILMEDU 6TH STREET ERODE 638 001 | ERODE | TAMIL NADU | 638001 | L1 | Accepted-Finance First lowest |
| Sl No | Description | Qty | Unit | REALITY ENGINEERS L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 27.43 | M3 | 256 ₹7,022.08 Lowest |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 30.02 | M3 | 270 ₹8,105.4 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 18.56 | M3 | 522 ₹9,688.32 Lowest |
| 4.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for foundation including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 6.08 | M3 | 5,400 ₹32,832 Lowest |
| 5.00Brick work in following Cement Mortar 1:5 using best quality country Brick of size 8 3/4" x 4 1/4" x 2 3/4" conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. | ||||
| 5.01 | In Foundation and basement | 13.5 | M3 | 6,300 ₹85,050 Lowest |
| 5.02 | In Ground floor | 18.17 | M3 | 6,400 ₹1,16,288 Lowest |
| 6.00Brick partition walls of 10.80cm thickness using best quality Country Brick of size 8-3/4” x 4-1/4” x 2-3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | ||||
| 6.01 | In Ground Floor | 119.6 | M2 | 900 ₹1,07,640 Lowest |
| 7.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 59.11 | M2 | 910 ₹53,790.1 Lowest |
Tender Value
₹20.8 L
EMD Value
₹20,800
Closing Date
6 Aug 2026, 3:00 pmClosed
Executive Engineer
O/o.Executive Engineer, PWD., Buildings (C and M) Division, Tirunelveli
Construction of Girls Toilet in Government Higher Secondary School at Thulukkarpatti in Tirunelveli District
2026_PWD_687821_1
2(2) EE/2026-27 Dated 21.07.2026
Open Tender
Civil Works - Buildings
Lump-sum
120 days
Thulukkarpatti
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,800
25 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 27.43 | M3 | - | - |
| 2 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 30.02 | M3 | - | - |
| 3 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 18.56 | M3 | - | - |
| 4 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for foundation including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 6.08 | M3 | - | - |
| 5Brick work in following Cement Mortar 1:5 using best quality country Brick of size 8 3/4" x 4 1/4" x 2 3/4" conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. | |||||
| 5.01 | In Foundation and basement | 13.5 | M3 | - | - |
| 5.02 | In Ground floor | 18.17 | M3 | - | - |
| 6Brick partition walls of 10.80cm thickness using best quality Country Brick of size 8-3/4” x 4-1/4” x 2-3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 6.01 | In Ground Floor | 119.6 | M2 | - | - |
| 7 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 59.11 | M2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tenderconditionthulukarpatti.pdf
Tender Documents • 1.03 MB
BOQ_826708.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .