| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹6.0 L+₹4,765 (0.80%)Rejected-Finance MIRZAPUR MUMTAZ NAGAR AYODHYA AYODHYA UTTAR PRADESH 224001 | AYODHYA | UTTAR PRADESH | 224001 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Eligible for Part I |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
10 Feb 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Supertending Engineer, EDC Ayodhya
EDC, Ayodhya
119 H(F)(W)/2024-25
2025_MVVNL_1000989_1
119 H(F)(W)/2024-25
Open Tender
Electrical Works
Item Wise
180 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹6,000
4 Mar 2025
3 Feb 2025
11 Feb 2025
3 Feb 2025
10 Feb 2025
3 Feb 2025
Amount
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 50 Km.)
Safe cartage of 8.5/9.0 Mtr. Long PCC poles.
Safe cartage of 11.0 Mtr. Long ST poles.
ACSR Weasel Conductor
AB Cable (1x16+1x25) sqmm
AB Cable (3x50+1x35+1x16) sqmm Three Phase AB Cable (3x95+1x70+1x16) sqmm
AB Cable (3x120+1x95+1x16) sqmm
Distribution Box Three Phase/Single Phase
Transformer 25 KVA
Transformer 63 KVA
Transformer 100 KVA
11 KV Cable Jointing Kit Outdoor 3x70 sqmm
11 KV Cable Jointing Kit Outdoor 3x120 sqmm
33 KV Cable Jointing Kit Outdoor 3x300 sqmm
33 KV Cable Jointing Kit Staight Through 3x300 sqmm
11 KV XLPE Cable 3x70mm2
11 KV XLPE Cable 3x120 mm2
33 KV XLPE Cable 3x300 sqmm
Cable Route Marker
11 KV Pilfer Proof Metring Cubical
33 KV Pilfer Proof Metring Cubical
Other Line material i.e. cross arm /conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of PCC/ST Pole as per RESPO Norms.
Fabrication and Erection of Single Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Double Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Four Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Erection of Stud Stay Support on PCC/ST Pole with fixing of necessary clamp and other accessories requied for erection including its painting .
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Stringing, Sagging, binding and jumpering of ACSR Weasel as per RESSPO Norms
Stringing, Sagging, binding and jumpering of AB Cable Size (1x16+1x25)/ (3x50+1x35+1x16)/ (3x95+1x70+1x16) and (3x120+1x95+1x16) as per RESSPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
Mounting of 63 KVA Transformer as per RESSPO Norms.
Mounting of 100 KVA Transformer as per RESSPO Norms.
Erection & Commissioning of of Single/Three Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms.
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x70 mm2/3x120 sqmm and 33 KV 3x300 sqmm confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 33 KV XLPE cable 3x300 sqmm confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Laying of underground 11 KV 3x70/3x120/3x300 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x70 mm2/3x120 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contractor)
High Pressure testing with to which 11 and 33 KV line to be stand for duration of 5 Minutes after Completion of laying Stringing, Sagging, binding and jumperingof ACSR Conductor. (Testing Equipment will be arranged by the Contractor.)
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Installation of 11 KV Pilfer Proof Metering Cubical
Installation of 33 KV Pilfer Proof Metering Cubical
Dismantalling of old line (05 Nos. Rail. Pole ACSR Conductor 55 Kg., Steel Scrap 200 Kg.)
Hindustan Electric Work (BID ID -4934903)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .