Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
1 May 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit III Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 4 GC 1 Changing the defective valves ES 3 etc
2025_EB_546448_1
CE / MTPS-I / SE / M-I / TM /OT.20 / 2025-26
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,700
Yes
3 May 2025
17 Apr 2025
2 May 2025
17 Apr 2025
1 May 2025
17 Apr 2025
Amount
Overhauling and Gasket renewal of LP Heater 3 or 4. a) Removing of water box and placing it on the repair bay.(Tag.No: LP Heaters- 3 or 4)
b) Lifting of tube nest, placing it on the T.G. floor, inspection, cleaning of tube nest and shell etc
c) Preparation of gaskets for the tube nest, water box inlet and outlet pipe line flanges etc.
d) Providing new gaskets for the tube nest and placing the tube nest inside the shell.
e) Cleaning and checking of drip line Header Nozzle holes, Checking the tube nest for leak if any plugging of all punctured tubes, placing the water box on the tube nest and tightening of main flange, Condensate inlet and outlet flanges after providing new gaskets.
Overhauling and Gasket renewal of Gland Cooler 1 a) Removal of Water box, flange bolts and nuts, Condensate inlet and outlet flanges, lifting the water box, placing it on the floor and cleaning of all flange surfaces. (Tag.No. GC No. 1)
b) Lifting of tube nest, Placing it on the floor, inspection, cleaning of tube nest and hydraulic testing etc.
c) Providing new gasket, for the tube nest and placing the tube nest inside the shell
d) Placing the water box on the tube nest and tightening the main flange, Condensate inlet and outlet flanges after providing new gasket
Labour charges for replacement of valves, pipes, stubs, bends and Reducers by IBR welding works. Replacing the defective existing ES-3 Valve with spool piece by new valve Size GV 200mm / 250 ATA / MO, pipe size OD 219.1 X 6.35 mm thick.
Stress Relieving charges for newly welded ES-3 valve welding joints of pipe size: OD 219.1 X 6.35 mm thick
Checking and cleaning of new valves. Cutting the existing Valves of VDAS-122 of size 100 mm / 1500 Class, Edge preparation, positioning the valve with pipe lines, checking the alignment for welding by IBR welder with TIG and Arc welding as per IBR specification
Stress Relieving charges for newly welded VDAS-122 welding joints of pipe size: 100 mm / 1500 Class (Rate for 1 sectional joint)
Replacing the existing damaged Metallic expansion bellow of Flash tank-I vent line to condenser (Tag No- E-5) by a new Metallic expansion bellow and spool piece by cutting, edge preparation and NON IBR welding. Cutting the damaged metallic expansion by providing necessary box type line support to arrest the movement of pipe line and removal of the chequered plate etc.
Grinding the cutting surface of the pipe and edge preparation of the pipe at both sides, suit the new bellow and positioning the metallic expansion bellow in the line.
Welding the both sides of the Metallic expansion bellow and providing the chequered plate, beams and removal of pipe supports.
Charges for cutting, edge preparation and welding of spool piece (One Joint)
Labour charges for replacement of valves, pipes, stubs, bends and Reducers by Non IBR welding works. Replacing the defective drain line valves or equivalent in Heater drip, condenser air, Auxiliary steam, and drain water lines etc by Non IBR welder.
Gasket renewing for 250/300/350 mm valve, This work involves Removing the valve from line, Cleaning the flange surface on both sides, Preparation of gaskets for both ends, positioning the valve in the Line with gaskets and tightening the flange bolts & nuts. (Tag No: Deaerator Pressure Control Valve-1No - Total= 1 No)
Transportation of valve from central store to site Transporting the valve and pipes from central store to Unit-II repair bay and repair bay to Unit-III work spot. (Tag No:- ES-3 Valve, D/A Pr.control Valve, VDAS-122, HD-14 &15)
Cost of welding electrodes for IBR welding. (For Item Sl. No:10 & 12)
Cost of welding electrodes for Non-IBR welding. (For Item Sl.No:18)
Cost of Argon Gas used for cutting and preheating for welding work for Item Sl.No. 10 & 12
Cost of Cutting Gas for cutting the pipes, valves & bends wherever necessary.
SS Pipe Grade 304/ 4”/ OD-114.3x6mm Thick, length 220mm
SS Elbow, Grade 304 /4”
SS Reducer Grade 304 / 4”x 3”
SS Reducer Grade 304 / 4”x 2”
SS Pipe Grade 304 / 3”, length 60mm
SS Pipe Grade 304 / 2”, length 60mm
Consumables & T&Ps (Sl.No. 1 to 20)
NEW SRI VENKATESWARA ENGINEERING WORKS (BID ID -1307094)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .