Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC Work order issued | |
| 2 | L2₹1.9 L+₹116 (0.06%)Rejected-Finance BODA PALLY MANIK DANGA RD KOL 700110 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700110 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹1.9 L+₹193 (0.10%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical 21 KBM CHAKDAH P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | - | Rejected-Technical Improper credential |
Tender Value
₹1.9 L
EMD Value
₹3,865
Closing Date
15 Jul 2026, 2:00 pmClosed
Executive Engineer
office of the E.E., Jhargram Division, S.S. P.W.D
Reconstruction of dilapidated boundary wall of ladies hostel compound under Jhargram Raj College at Jhargram in the Financial Year 2026-27.
2026_WBPWD_5016320_2
WBPWD/SS/EE-J.D./e-NIT -01/2026-27
Open Tender
CIVIL WORKS
Percentage
60 days
Jhargram
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,865
Yes
10 Aug 2026
3 Jul 2026
17 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. | 5.25 | Cum. | 447 | ₹2,346.75 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | - | %Cum. | 11,927 | - |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation of foundation. | 16.04 | %Cum. | 7,754 | ₹1,24,374.16 |
| 4 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). | - | %Cum. | 59,961 | - |
| 5 | 250 mm thick Brick work with Fly Ash Bricks (250mmx125mmx75mm) as per IS 12894:2002 in cement mortar (1:4). In foundation and plinth. | 1.21 | Cum. | 4,333.21 | ₹5,243.18 |
| 6 | 125 mm. thick Flyash brick work as per IS 12894:2002 in cement mortar (1:4) in ground floor. | 1 | Sqm. | 575.53 | ₹574.95 |
| 7 | Ordinary Cement Concrete(mix 1:1.5:3) with graded stone chips (20 mm. nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS Codes. Pakur Variety. | 0.4 | Cum. | 5,714.53 | ₹2,285.24 |
| - | Labour for scrapping and picking up old dilapidated mortar / plaster (Cement / Surki / Lime mortar) from the surface of old Brick faces including cleaning the frog without damaging the Brick and stacking the Bricks at Site / Stacking yard as per direction of Engineer-in-charge including removing all debris rubbish from site complete. | 817 | 1000 Nos. | 950 | ₹7,76,150 |
| - | Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. | 25.57 | Sqm. | 40 | ₹1,022.8 |
| - | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor).Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. | - | Sqm. | 357 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
2911.pdf
Tender Documents • 0.52 MB
BOQ_5085703.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .