Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10.0 L+₹3,335.42 (0.33%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical KATRA BUS STAND NIHARIKA BHAWAN BAN GANGA ROAD KATRA REASI | REASI | JAMMU AND KASHMIR | 182301 | - | Not Admitted-Fee/PreQual/Technical Others-Latest GST-3B not found and date of treasury challan not as per published e-NIT |
Tender Value
₹11.9 L
EMD Value
₹23,820
Closing Date
30 Jul 2026, 5:00 pmClosed
EXECUTIVE ENGINEER PWD (RNB) DIVISION KATRA
EXECUTIVE ENGINEER PWD (RNB) DIVISION KATRA
BOQ
2026_PWDJK_317501_1
Fresh-e-NIT No. 21 of 2026-27 Dt. 23-07-2026
Open Tender
Civil Works
Percentage
30 days
KATRA
NIT
2 documents required · 2 mandatory
₹600
Yes
EXECUTIVE ENGINEER PWD (RNB) DIVISION KATRA
₹23,820
Yes
8 Aug 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
30 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10sqm on plan including disposal of excavated earth lead upto 50 mtr., lift upto 1.50 Mtr. as directed by the Engineer-In-charge; all kinds of soil. | 148.5 | sqm | 91.75 | ₹13,624.88 |
| 2 | Treatment of soil for anti termite and Weedicide using chemical emulsion @ 1litre/hole 300mm including drilling 12mm diameter holes and plugging with cement mortar 1:2 including cost of chemical emulsion | 148.5 | sqm | 50 | ₹7,425 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4coarse sand: 8 graded stone aggregate 40mm nominal size). | 14.85 | cum | 5,202.9 | ₹77,263.06 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size) | 14.85 | cum | 7,788.4 | ₹1,15,657.74 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,485 | kg | 123.2 | ₹1,82,952 |
| 6 | 40mm thick marble chips flooring rubbed and polished to granolithic finish, under layer 28mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) and top layer 12mm thick with white, black, chocolate, grey, yellow or green marble chips of sizes from 7 mm to 10mm nominal size, laid in cement marble powder mix 3:1 (3 cement : 1 marble powder) by weight in proportion of 2:3 (2 cement marble powder mix :3 marble chips) by volume including cement slurry and curing complete : Ordinary cement without any pigment. | 148.5 | sqm | 958.6 | ₹1,42,352.1 |
| 7 | Providing and laying ITF Approved 1-Star Synthetic Acrylic Cushioned Sports Flooring for Badminton Court over a properly prepared cement concrete/bituminous base, comprising an eight-layer acrylic coating system consisting of :-
1. Two coats of acrylic resurfacer, (2) four coats of rubberized acrylic cushion coating, (3) two coats of premium acrylic colour coating, and badminton court line marking with approved acrylic line marking paint, including surface preparation, minor crack filling and surface corrections, all materials, labour, tools and plants, machinery, consumables, loading, unloading, carriage, handling, testing, quality control, all leads and lifts, contractor’s overheads and profit, complete in all respects as per the manufacturer’s specifications and as directed by the Engineer-in-Charge. | 148.5 | sqm | 1,600 | ₹2,37,600 |
| 8 | Providing, supplying, installing, testing and commissioning of height-adjustable badminton net posts fabricated from heavy-duty powder-coated steel tubular sections, complete with standard competition nylon badminton net, precision net tensioning mechanism, floor sockets or portable weighted base as specified, anchor bolts, clamps, nuts, bolts, washers, fasteners, locking arrangement and all other fixtures and accessories, including transportation, loading, unloading, assembly, alignment, fixing in position, testing, commissioning and making good all disturbed surfaces after installation, complete in all respects as per the approved specifications and directions of the Engineer-in-Charge. | 1 | set | 15,000 | ₹15,000 |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and thelike not exceeding 10sqm on plan, depth upto 1.5mtr.including disposal of excavated earth upto 1 mtr fromcutting edge, disposed earth is to be levelled and neatly dressed in All kinds of soil. | 20.52 | cum | 479.3 | ₹9,835.24 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.42 | cum | 4,826.5 | ₹16,506.63 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_1040698.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .