Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Experience Certificate not submitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical EMD Not submitted |
| Sl No | Description | Qty | Unit | BHASKAR BARMAN L1 | RIJU SARMA L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Intake well | 1 | Job | 6,06,108.55 ₹6.1 L | 6,38,009 ₹6.4 L |
| 2.00 | 65 mm dia Raw water pumping main | 1 | Job | 1,82,812.3 ₹1.8 L | 1,92,434 ₹1.9 L |
| 3.00 | HP Centrifugal type Raw water pump sets: | 1 | Job | 1,25,901.6 ₹1.3 L | 1,32,528 ₹1.3 L |
| 4.00 | Cost of Treatment Plant: .158 MLD | 1 | Job | 9,74,187.95 ₹9.7 L | 10,25,461 ₹10.3 L |
| 5.00 | Filter Under Drainage System, Internal Connection, Filter | 1 | Job | 1,54,609.65 ₹1.5 L | 1,62,747 ₹1.6 L |
| 6.00 | Cost of 30 Cu.m capacity Underground clear water sump | 1 | Job | 3,60,549.7 ₹3.6 L | 3,79,526 ₹3.8 L |
| 7.00 | Chemical Dosing (Electro Chlorinator with Test Kit): | 1 | Job | 48,538.35 ₹48,538.35 | 51,093 ₹51,093 |
| 8.00 | Clear water pump house | 1 | Job | 1,44,189.1 ₹1.4 L | 1,51,778 ₹1.5 L |
| 9.00 | 3.0 HP capacity Clear Water Pump Set: | 1 | Job | 96,409.8 ₹96,409.80 | 1,01,484 ₹1.0 L |
| 10.00 | 65 mm dia Clear Water Pumping main: | 1 | Job | 35,792.2 ₹35,792.20 | 37,676 ₹37,676 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
25 Nov 2020, 3:00 pmClosed
Director, PHED, BTC, Kokrajhar
O/o the Director, PHED, BTC, Kokrajhar
Greater Uttarkuchi PWSS under the programme of JJM for the year 2020-21 under PHE Baksa Division
2020_BoTC_19285_1
BTC/PHED/7/2021 - 7/1
Open Tender
Construction Works
120 days
BAKSA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
Principal Secratary, BTC
₹2.2 L
Yes
9 Dec 2020
13 Nov 2020
25 Nov 2020
13 Nov 2020
25 Nov 2020
13 Nov 2020
13 Nov 2020 - 25 Nov 2020
Amount
Construction of Intake well
65 mm dia Raw water pumping main
HP Centrifugal type Raw water pump sets:
Cost of Treatment Plant: .158 MLD
Filter Under Drainage System, Internal Connection, Filter
Cost of 30 Cu.m capacity Underground clear water sump
Chemical Dosing (Electro Chlorinator with Test Kit):
Clear water pump house
3.0 HP capacity Clear Water Pump Set:
65 mm dia Clear Water Pumping main:
Const. of 60 Cum capacity RCC O.H.R with 16 m.
Cost of Distribution Network:
Accommodation for operating staff i) For intake point
ii) For Tratment Plant
ASEB Power Connection including power line i) For intake point
ii) For Tratment Plant
Site Development
Compound Fencing
Compound Electrification and lighting
Approach Road with Box Culvert
T&P Materials
Trial Run
Miscellaneous
Diesel Generating Set : A) At Intake location 7.5 KVA
B) At Treatment Plant 7.50 KVA
Cost of House Service Connection 293
Cost of Laboratory equipment
Cost of 2.0 Sq.m. Toilet in Treatment Plant
Provision for safe disposal of waste water (0.5% of the project cost)
RIJU SARMA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
SBD_07_PHE.pdf
Tender Documents • 0.33 MB
BOQ_29903.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid