Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC 127 182 JUHI GADADA KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹6.4 L | L1 | Accepted-AOC Deed Complete |
| 2 | L2₹6.4 LSame as L1Rejected-Finance | ₹6.4 LSame as L1 | L2 | Rejected-Finance Rejected in lottery |
| 3 | L2₹6.4 LSame as L1Rejected-Finance | ₹6.4 LSame as L1 | L2 | Rejected-Finance Rejected in lottery |
| 4 | L2₹6.4 LSame as L1Rejected-Finance 127 102 JUHI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹6.4 LSame as L1 | L2 | Rejected-Finance Rejected in lottery |
Tender Value
₹7.5 L
EMD Value
₹75,333
Closing Date
17 Dec 2025, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Improvement work of the road cut by Jal Sansthan from 7 Bungalows to Pamkot Apartment under Zone-04 Ward-61.
2025_NNKAN_1098730_1
291/AA-4/25-26
Open Tender
Civil Works
Percentage
45 days
Ward-61
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹75,333
4 May 2026
12 Dec 2025
17 Dec 2025
12 Dec 2025
17 Dec 2025
12 Dec 2025
Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m ,as directed by engg-in-charge:2.1.1 All kinds of soil. Extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials
Supplying and filling in plinth with sand under under floors, including watering, ramming, cosolidating and dressing complete.
Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401.
Providing, laying, spreading and compacting stone agreegate of specific size to water bound macadam-3 speicfication including spreading in uniform thickness, hand packing, rolling with 3-wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and chamber, applying and brooming requisite type of screening/binding materials to fill up the coarse aggretgates, watering and compacting to the required density.
Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.30Kg/sqm on prepared bituminous surface/granular treated with primer & cleaned with hydraulic broom
Dense graded Bituminous macadam (DGBM) Prov./laying Dense graded bitumionor macadam with 60-9TPH batch type HMP prouducing an average output of 75 tonnes per hour crushed
Providing and laying Bituminous Concrete (B.C.) with 50mm thick (average) with computrished HMP type hot mix plant producing an average output of 75 tonnes per tonnes per hour crushedaggregateof specified grading permixed with bitumenour binder.
Add 18 % G.S.T.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2023910.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.93 MB
AFFIDAVIT_FORMAT.pdf
Tender Documents • 0.46 MB
BOQ_2023910.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .