Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹19.9 L (13.3%)Rejected-Finance VINOD VIHAR COLONY HATHRAS | HATHRAS | UTTAR PRADESH | 202139 | ₹1.7 Cr+₹19.9 L (13.3%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | SUNIL KUMAR CONTRACTOR L2 | AASTHA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and throny jungle without uprooting, with its proper disposal outside the inspection house including all cost of labour, T&P etc complete as per direction of Engineer-in-charge. | 10,300 | Sqm | 2.3 ₹23,690 | 2 ₹20,600 Lowest |
| 2.00 | Dismantling of R.C.C. work with its proper stacking including all cost of labour, T&P etc. as per direction of Engineer incharge. | 86.99 | Cum | 500 ₹43,495 | 400 ₹34,796 Lowest |
| 3.00 | Dismantling of C.C. work with its proper stacking including all cost of labour, T&P etc. as per direction of Engineer incharge. | 54.64 | Cum | 400 ₹21,856 | 300 ₹16,392 Lowest |
| 4.00 | Dismantelling of old plaster including raking out joints and disposal of debris with 60 metres distance i/c T&P, labour, etc complete as per direction of Engineer incharge. | 4,504.11 | Sqm | 18 ₹81,073.98 | 15 ₹67,561.65 Lowest |
| 5.00 | Dismantelling Brick work with proper stacking of usable bricks, brick rora and debris saperately including all cost of labour, T&P etc. as per direction of Engineer incharge. | 45.65 | Cum | 418 ₹19,081.7 | 350 ₹15,977.5 Lowest |
| 6.00 | Earth work in foundation in all type of soil including all lift and lead also including backfilling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth with all cost of labour, T&P etc complete as per direction of Engineer in charge. | 858.17 | Cum | 90 ₹77,235.3 | 56 ₹48,057.52 Lowest |
| 7.00 | Providing and Laying cement concrete A20,M10 (1 Cement : 3 Coarse sand: 6 graded stone aggregate) in foundation or flooring including all cost of material, labour, T&P etc complete as required for proper completion of work. | 154.55 | Cum | 4,350 ₹6,72,292.5 | 4,000 ₹6,18,200 Lowest |
| 8.00 | 1st class Brick (M-150) work with 1:4 cement mortar with all cost of material, labour,T&P etc complete as required for proper completion of work. | 311.29 | Cum | 5,420 ₹16,87,191.8 | 4,500 ₹14,00,805 Lowest |
| 9.00 | Ordinary Centering and shuttering of R.C.C. including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintels, sun shades, columns & walls etc complete. | 1,853 | Sqm | 515 ₹9,54,295 | 442.75 ₹8,20,415.75 Lowest |
| 10.00 | Providing and Laying RCC A20,M20 (1 Cement : 1.5 Coarse sand: 3 graded stone aggregate) in foundation or slab or column or beam or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 485.42 | Cum | 5,600 ₹27,18,352 Lowest | 5,871.48 ₹28,50,133.82 |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
24 Sept 2025, 3:00 pmClosed
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1074837_1
07/SE-1/2025-26
Open Tender
Civil Works
Piece-work
180 days
Muzaffar Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.8 L
SE OFFICE 1ST IWC MEERUT
19 Nov 2025
18 Sept 2025
24 Sept 2025
18 Sept 2025
24 Sept 2025
18 Sept 2025
20 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .