Loading…
Loading…
Tender ID
Tender Value
₹20.2 Cr
EMD Value
₹11.6 L
Closing Date
10 Mar 2026, 12:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
TELE
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where: - V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause no. 10.2 of Chapter I
SIMILAR NATURE OF WORK: "Any OFC Work"
TECHNICAL ELIGIBILITY: - (a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. As per clause no. 10.1 of Chapter-I
Bid Capacity: The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI.
9 conditions · 3 needing a document upload
I) Certificates which may be an attested Certificate from the client, Audited Balance Sheet duly certified by the Chartered Accountant etc. regarding contractual payments received in the past. 2) The list of personnel / organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
As per Tender documents
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The following Mandatory documents to be submitted by Tenderer along with bid, offers without these mandatory documents will be summarily rejected. i) Technical Credential for Completed similar nature of Works as per Chapter -I, Clause No.10(Annexure A/B or both as per Clause no. 10.1). ii) Details of FINANCIAL CREDENTIAL: As per Chapter -I, second sheet para 10.2. iii) Certificate of Annexure-V on ireps module. iv) Bid Security as per Annexure-VI A if submitted in the form of Bank Guarantee. v) Bid capacity as per Clause No. 10.3 of Chapter-I. vi) Compliance of Technical specification of Tender as per Annexure R of Section-II. vii) Certificate of Local content as per Form-1 under clause 51 of Chapter-III.
All documents as mentioned in Instructions of Tender must be duly signed and submitted along with the tender documents.
Guidelines of Indian Railway Telecom Manual to be followed for this work including OFC cable laying portion.
Provision of 4 x 48 fiber OFC for communication backbone in section Kamakhya (KYQ) -Guwahati (GHY) - Lumding (LMG) (191 RKM) of Lumding Division under HUN6 sections covered within sanctioned KAVACH territory.
N_02_HQ-2025-26-RT
N_02_HQ-2025-26-RT
Open
Works - General
24 Months
Kamrup, Assam
₹0
₹11.6 L
10 Mar 2026
6 Feb 2026
47 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 20,18,18,619.09 | ||
| — | 654.00 | — | — | ||
| Supply of permanently lubricated HDPE Pipe of size 40/33 mm (nominal) along with sockets and Couplers as per specification no. RDSO/SPN/TC/45/2013 Rev.2.0 Amdt.3 or latest and as per technical specification. | — | — | — | 3,38,39,601.54 | |
| — | 142.00 | — | — | ||
| Supply, installation, testing and commissioning of FDMS (48 Fiber on each side) as per RDSO specification No. RDSO/SPN/TC/37/2020 Rev.4.0 or latest and as per TS. | — | — | — | 33,70,815.88 | |
| — | 309.00 | — | — | ||
| Supply of OFC Cable Joint enclosure as per RDSO/SPN/TC/68/2025 Rev 2 or latest for splicing of Optic fibre cable (48 fibres) as per TS. | — | — | — | 8,53,906.05 | |
| — | 309.00 | — | — | ||
| Installation of OFC joint enclosure and splicing & testing of 48 fiber OFC cable as per technical specification. | — | — | — | 11,39,833.02 | |
| — | 282000.00 | — | — | ||
| Digging of 1.20 Meter deep and 0.3 Meter wide trenches including clearing of roots of trees and bushes and temporary obstruction on the selected route, as per technical specifications and cable route plan. Note: In case where digging of trench up to 1.20 Meter depth and 0.3 meter wide is not possible or bigger size trench is required to lay more cables or loose soil/ muck is encountered, the depth can be reduced / increased as per directions of the Engineer-in-charge of the works, the payment will be decreased/increased proportionate to the depth & width of excavation compared to 1.20 Meter deep and 0.3 Meter wide. In all type of soils including soft rock. Note: In case where digging of trench up to 1.20 Meter depth and 0.3 meter wide is not possible or bigger size trench is required to lay more cables or loose soil/ muck is encountered, the depth can be reduced / increased as per directions of the Engineer-in-charge of the works, the payment will be decreased/increased proportionate to the depth & width of excavation compared to 1.20 Meter deep and 0.3 Meter wide. In all type of soils including soft rock. | — | — | — | 1,76,22,180 | |
| — | 1280.00 | — | — | ||
| Excavation of trench to a depth of 1 Mtr. for track crossing of cables, laying of HDPE/DWC/ RCC pipes with collar/coupling, refilling of trench by ramming and consolidating it as per the instructions of Railway representative at site. During excavation of trench it has to be ensured that the excavated soil does not mix with the ballast available. The depth of 1m trench shall be from the bottom of sleepers for track crossings as per TS. | — | — | — | 2,89,369.6 | |
| — | 19100.00 | — | — | ||
| All works of excavation of cable trench 1.0 Meter deep, 0.3 Meter wide on pucca platform/on Road for road crossing and restoration of the platform/Road surface to original condition with contractor's material, after laying of GI/DWC pipes and then re-fill as per TS. | — | — | — | 1,10,85,258 | |
| — | 85400.00 | — | — | ||
| Transportation of HDD machine with accessories including handling of stores materials, supply of HDPE/DWC pipe of adequate dia. sizes as per instruction of Engineer in charge, preparation of site, entry, and exit pit(1mX1mX1m) and boring of size 110 mm dia. for placing of HDPE Silicore duct/DWC of adequate dia. size as per instruction of site engineer for 6 Quad cable /OFC cable /other cables for crossing Track/Pucca Road /Congested area. Boring trench shall be minimum 3(three) meter below the river bed/Track and 1(one) meter below the Road/Pucca road crossing area including supply of accessories for pulling HDPE pipe. All other petty materials with earth work, jointing of the duct is to be done by Contractor as per TS. | — | — | — | 10,77,54,304 | |
| — | 654000.00 | — | — | ||
| Laying of HDPE/DWC pipe of various sizes - as advised by Engineer-in-charge and as per TS. | — | — | — | 13,86,480 | |
| — | 654000.00 | — | — | ||
| Blowing of OFC through HDPE pipe for 48 Fiber OFC cable as per TS | — | — | — | 29,95,320 | |
| — | 292000.00 | — | — | ||
| Back filling and consolidating of cable trench first for 5 CM (in case where bricks are to laid over cables) after laying of cables and then complete back filling & Ramming of loose soil as per the technical specifications. | — | — | — | 6,89,120 | |
| — | 5178.00 | — | — | ||
| Supply of galvanized trunking with cover of same material as per DRG No. RDSO/TCDO/COP-12 or latest and fixing on girder bridges including supply of channel angle iron bracket unit, nuts and bolts of proper sizes and filling of support at an interval of one meter including laying of cable inside the trough and filling with bitumen compound as per TS. | — | — | — | 43,82,607.42 | |
| — | 64.00 | — | — | ||
| Taking the all types of cables inside station relay rooms/ABS Huts, location boxes and junction boxes etc. and sealing of cable entry pit etc. as per Technical specifications, complete with contractors' material as per TS. | — | — | — | 5,63,717.76 | |
| — | 7650.00 | — | — | ||
| Supply , transportation at site& erection of concreting base RCC cable route marker as per technical specification as per TS. | — | — | — | 22,96,606.5 | |
| — | 2.00 | — | — | ||
| Supply of Optical Fiber Splicing Machine conforming to TEC/ GR/TS/OSM-001/04/Sep- 12 or latest with all accessories along with high precision fiber clever, stripping tools and other accessories & sufficient no. of splice protection sleeves and isopropyl alcohol to be supplied for test splice as per TS. | — | — | — | 8,09,601.74 | |
| — | 2.00 | — | — | ||
| Supply of Cable route tracer cum RFID marker locator with GPS tagging facility along with GPS device as per TEC 73070-2025 or latest and as per TS. | — | — | — | 10,47,297.32 | |
| — | 2.00 | — | — | ||
| Supply of Optical time domain Reflectometer (OTDR) as per TEC/GR/TX/OTD-001/05 /Sep-19 or latest and additional requirement as per technical specification. | — | — | — | 6,88,650.58 | |
| — | 281.00 | — | — | ||
| Loading and transportation of S&T cable from the stores and unloading at the site of laying as per TS | — | — | — | 9,33,369.6 | |
| — | 96.00 | — | — | ||
| Supply of 9U Racks and all accessories required for installation purpose of switches/FDMS as per TS | — | — | — | 8,05,187.52 | |
| — | 64.00 | — | — | ||
| Supply, transportation and installation of RCC joint chamber with two piece top cover and bottom cover with holes for drainage and cable entry, as per TS. This includes trenching for jointing pit, back filling and ramming of the pit after placing the joint closure and cable loop in the chamber without causing any damage to the same and consolidation of soil as well as disposal of excess oil as per TS. | — | — | — | 2,08,248.96 | |
| — | 3820.00 | — | — | ||
| Supply of smart Electronic RFID cable marker with capability of saving the user specific data inside the marker memory chip, later readable by locator (during locating, floating coil to keep detection circuit always horizontal for better detection) as per TEC 73070-2025 or latest and as per TS. | — | — | — | 74,21,572.4 | |
| — | 3820.00 | — | — | ||
| Transportation to site and installation of electronic cable Route Marker for route, track and road crossing marking along the route of cable laying as per TS. | — | — | — | 4,53,663.2 | |
| — | 191.00 | — | — | ||
| Programming and Geo Tagging by taking latitude & longitude of RFID Markers by using Integrated Locator in new cable laying & existing cable laying route with Digital mapping thru mobile application. Provision of hard copy of Digital route plan and Geotagging Data with Railway track to cable distance on digital mapping as per TS | — | — | — | 11,81,908 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril2022uptoACS10combined.pdf
JPO.pdf
Re-TenderDocLMGFinal.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .