Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹35.6 L+₹47,154.60 (1.34%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹36.5 L+₹1.3 L (3.76%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹37.4 L+₹2.3 L (6.56%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹37.6 L+₹2.5 L (7.16%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VIRINDER SINGH L8 | s l sharma and sons L7 | VISHWANATH AND SONS L4 | r k builders L9 | M/S K N INFRASTRUCTURE L6 | M/s Susheel Kumar Govt. Contractor L1 | BHAGWATI TRADERS L2 | ANIL KUMAR SHARMA L3 | M/s AKHIL SHARMA L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster of any description on concrete surfaces such as soffit of RCC slab, chajjas and brick walls etc including raking out joints, hacking for key, scrubbing down with water etc. all as specified and directed by Engr-in-charge | 985 | Sqm | 1 ₹985 Lowest | 2 ₹1,970 | 10 ₹9,850 | 5 ₹4,925 | 10 ₹9,850 | 3 ₹2,955 | 3 ₹2,955 | 5 ₹4,925 | 5 ₹4,925 |
| 2.00 | Taking down chowkat or frame with shutters n.exe 1.50 sqm (without taking off shutter from frame) each all as specified and directed by Engr-in-charge | 20 | Each | 20 ₹400 Lowest | 20 ₹400 Lowest | 55 ₹1,100 | 50 ₹1,000 | 50 ₹1,000 | 48 ₹960 | 30 ₹600 | 30 ₹600 | 50 ₹1,000 |
| 3.00 | Taking down chowka tor frame with shutters.exe 1.50 sqm and n exe 4 sqm (without taking off shutter from the frame) each all as specified and directed by Engr-in-charge | 15 | Each | 20 ₹300 Lowest | 20 ₹300 Lowest | 55 ₹825 | 60 ₹900 | 50 ₹750 | 48 ₹720 | 30 ₹450 | 30 ₹450 | 50 ₹750 |
| 4.00 | Dismantling, floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store yard and rubbish off the premises all as specified and directed by Engr-in-charge | 595 | Sqm | 2 ₹1,190 Lowest | 10 ₹5,950 | 30 ₹17,850 | 10 ₹5,950 | 10 ₹5,950 | 2 ₹1,190 Lowest | 8 ₹4,760 | 5 ₹2,975 | 5 ₹2,975 |
| 5.00 | Dismantling of plain or corrugated steel sheeting any gauge and thickness including Nainiital or similar pattern roof coveriongs complete all as specified and directed by Engr-in-charge | 791 | Sqm | 2 ₹1,582 Lowest | 10 ₹7,910 | 20 ₹15,820 | 20 ₹15,820 | 10 ₹7,910 | 2 ₹1,582 Lowest | 5 ₹3,955 | 5 ₹3,955 | 5 ₹3,955 |
| 6.00 | Dismantling wall and ceiling boards, fibre pulp insulation etc) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and directed by Engr-in-charge | 460 | Sqm | 2 ₹920 Lowest | 2 ₹920 Lowest | 13 ₹5,980 | 5 ₹2,300 | 10 ₹4,600 | 2 ₹920 Lowest | 5 ₹2,300 | 5 ₹2,300 | 5 ₹2,300 |
| 7.00 | Demolition of brick work built in cement mortar all as specified and directed by Engr-in-charge | 37 | Cum | 20 ₹740 Lowest | 20 ₹740 Lowest | 55 ₹2,035 | 100 ₹3,700 | 400 ₹14,800 | 45 ₹1,665 | 70 ₹2,590 | 70 ₹2,590 | 50 ₹1,850 |
| 8.00 | Demolition of cement concrete (unreinforced) in ground floors and paving n. exc 15 cm thickness below or above GL all as specified and directed by Engr-in-charge | 44 | Cum | 20 ₹880 Lowest | 20 ₹880 Lowest | 55 ₹2,420 | 150 ₹6,600 | 150 ₹6,600 | 45 ₹1,980 | 70 ₹3,080 | 70 ₹3,080 | 50 ₹2,200 |
| 9.00 | Demolition of reinforced cement conrete (reinforcement cut as required to facilitate demoletion) of roofs, floors (other than ground floors), beams, staircases, landings, chajjas and similar suspended work complete all as specified and directed by Engr-in-charge | 5 | Cum | 50 ₹250 | 20 ₹100 Lowest | 55 ₹275 | 150 ₹750 | 400 ₹2,000 | 100 ₹500 | 80 ₹400 | 70 ₹350 | 50 ₹250 |
| 10.00 | Excavation in trenches and exceeding 1.5m wide and not exc 1.5m in depth in hard and dence soil and getting out complete all as specified and directed by Engr In Charge. | 25.92 | Cum | 50 ₹1,296 Lowest | 100 ₹2,592 | 55 ₹1,425.6 | 150 ₹3,888 | 200 ₹5,184 | 140 ₹3,628.8 | 100 ₹2,592 | 100 ₹2,592 | 100 ₹2,592 |
Tender Value
₹48.2 L
EMD Value
₹97,000
Closing Date
11 Sept 2026, 6:00 pmClosed
GE SOUTH UDHAMPUR
GE SOUTH UDHAMPUR
SPL REPAIR TO BLDG NO NP17 NP23 AND NP40 UNDER AGE BRI AND REPAIR REPLACEMENT OF CERTAIN BER SUMMER WINTER APPLIANCES UNDER GE SOUTH UDHAMPUR
2026_MES_785795_1
GE/S(U)-95/2026-27
Open Tender
Civil Works
Works
180 days
GE SOUTH UDHAMPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE SOUTH UDHAMPUR
₹97,000
18 Sept 2026
21 Aug 2026
12 Sept 2026
21 Aug 2026
11 Sept 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster of any description on concrete surfaces such as soffit of RCC slab, chajjas and brick walls etc including raking out joints, hacking for key, scrubbing down with water etc. all as specified and directed by Engr-in-charge | 985 | Sqm | - | - |
| 2 | Taking down chowkat or frame with shutters n.exe 1.50 sqm (without taking off shutter from frame) each all as specified and directed by Engr-in-charge | 20 | Each | - | - |
| 3 | Taking down chowka tor frame with shutters.exe 1.50 sqm and n exe 4 sqm (without taking off shutter from the frame) each all as specified and directed by Engr-in-charge | 15 | Each | - | - |
| 4 | Dismantling, floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store yard and rubbish off the premises all as specified and directed by Engr-in-charge | 595 | Sqm | - | - |
| 5 | Dismantling of plain or corrugated steel sheeting any gauge and thickness including Nainiital or similar pattern roof coveriongs complete all as specified and directed by Engr-in-charge | 791 | Sqm | - | - |
| 6 | Dismantling wall and ceiling boards, fibre pulp insulation etc) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and directed by Engr-in-charge | 460 | Sqm | - | - |
| 7 | Demolition of brick work built in cement mortar all as specified and directed by Engr-in-charge | 37 | Cum | - | - |
| 8 | Demolition of cement concrete (unreinforced) in ground floors and paving n. exc 15 cm thickness below or above GL all as specified and directed by Engr-in-charge | 44 | Cum | - | - |
| 9 | Demolition of reinforced cement conrete (reinforcement cut as required to facilitate demoletion) of roofs, floors (other than ground floors), beams, staircases, landings, chajjas and similar suspended work complete all as specified and directed by Engr-in-charge | 5 | Cum | - | - |
| 10 | Excavation in trenches and exceeding 1.5m wide and not exc 1.5m in depth in hard and dence soil and getting out complete all as specified and directed by Engr In Charge. | 25.92 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
TENDER.pdf
Tender Documents • 1.05 MB
BOQ_880559.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .