| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC MUNGADIH POST BAKSAHI TAH PALI KORBA CG 495449 | KORBA | KORBA | CHHATTISGARH | 495449 | ₹12.0 L | L1 | Accepted-AOC Technically and financially eligible L1 Bidder |
| 2 | L2₹13.2 L+₹1.2 L (10.2%)Rejected-Finance 197 NEAR ASHRAY HOTEL SITAMANI CHOUK KORBA C G 495677 | KORBA | CHHATTISGARH | 495677 | ₹13.2 L+₹1.2 L (10.2%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹15.8 L+₹3.8 L (31.4%)Rejected-Finance B 407 ANANT IMAGINE APARTMENT OLD BUS STAND KORBA DIST KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹15.8 L+₹3.8 L (31.4%) | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹16.1 L+₹4.1 L (34.3%)Rejected-Finance BEHIND OF PAWAN TALKIES ROAD KORBA CG 495678 | 495678 | ₹16.1 L+₹4.1 L (34.3%) | L4 | Rejected-Finance Not L1 Bidder |
| 5 | L5₹19.2 L+₹7.1 L (59.5%)Rejected-Finance | ₹19.2 L+₹7.1 L (59.5%) | L5 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | RAKESH KUMAR RANJAN L5 | Amit Agrawal L2 | AEKANSH GROUP L3 | SATPAL SHARMA L4 | M/S DEEPAK KUMAR DIXENA L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in soil using Hydraulic Excavator and tippers with disposal up to 1000metres. | 4,728.5 | cum | 77 ₹3,64,094.5 | 30 ₹1,41,855 | 34 ₹1,60,769 | 34.85 ₹1,64,786.33 | 28 ₹1,32,398 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 33 | Cum | 3,527 ₹1,16,391 | 2,884 ₹95,172 | 3,471 ₹1,14,543 | 3,539.39 ₹1,16,799.74 | 2,500 ₹82,500 Lowest |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size derived fro natural resources) | 87 | Cum | 4,557 ₹3,96,459 | 3,777 ₹3,28,599 | 4,544 ₹3,95,328 | 4,634.28 ₹4,03,182.11 | 3,500 ₹3,04,500 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 27 | cum | 4,567 ₹1,23,309 | 3,508 ₹94,716 | 4,221 ₹1,13,967 | 4,304.65 ₹1,16,225.42 | 3,250 ₹87,750 Lowest |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 6,960 | Kg | 77 ₹5,35,920 | 56 ₹3,89,760 | 67 ₹4,66,320 | 68.71 ₹4,78,251.67 | 54.5 ₹3,79,320 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns. | 122 | Sqm | 177 ₹21,594 | 144 ₹17,568 | 174 ₹21,228 | 177.43 ₹21,646.45 | 60 ₹7,320 Lowest |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 371 | Sqm | 177 ₹65,667 | 146 ₹54,166 | 175 ₹64,925 | 179.21 ₹66,487.01 | 65 ₹24,115 Lowest |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 2,92,218.21 ₹2,92,218.21 | 2,01,930.48 ₹2,01,930.48 | 2,40,674.4 ₹2,40,674.4 | 2,46,128.17 ₹2,46,128.17 | 1,83,222.54 ₹1,83,222.54 Lowest |
Tender Value
₹21.3 L
EMD Value
₹26,700
Closing Date
24 Sept 2025, 5:00 pmClosed
Staff Officer Civil SECL Korba Area
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Deeping and Beautification of Pond at Talapara village at Saraipali OCP of Korba Area (Re-tender)
2025_SECL_343504_1
SECL/GM/KA/C/e-Tender/25-26/85 Dt. 08.09.2025
Open Tender
Civil Works - Others
Item Rate
180 days
Office of General Manager SECL Korba Area
As per NIT
3 documents required · 3 mandatory
₹26,700
16 Dec 2025
9 Sept 2025
26 Sept 2025
10 Sept 2025
24 Sept 2025
10 Sept 2025
10 Sept 2025 - 13 Sept 2025
Amount
Excavation in soil using Hydraulic Excavator and tippers with disposal up to 1000metres.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size derived fro natural resources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Total impact of GST for the purpose of CTC
Amit Agrawal (BID ID -1186760)
AEKANSH GROUP (BID ID -1186811)
SATPAL SHARMA (BID ID -1183452)
RAKESH KUMAR RANJAN (BID ID -1185979)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_356151.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .