| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAccepted-AOC | ₹8.9 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹10.2 Cr+₹1.3 Cr (14.0%)Rejected-Finance | ₹10.2 Cr+₹1.3 Cr (14.0%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹10.8 Cr+₹1.8 Cr (20.7%)Rejected-Finance | ₹10.8 Cr+₹1.8 Cr (20.7%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹11.0 Cr+₹2.0 Cr (22.6%)Rejected-Finance | ₹11.0 Cr+₹2.0 Cr (22.6%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹11.5 Cr+₹2.6 Cr (28.6%)Rejected-Finance | ₹11.5 Cr+₹2.6 Cr (28.6%) | L5 | Rejected-Finance Being L5 |
Tender Value
₹12.2 Cr
EMD Value
₹24.5 L
Closing Date
21 Mar 2019, 6:00 pmClosed
M.AJITHA AGM (E-C)
M.AJITHA AGM (E-C), Operational offices building, AAI, SR, Chennai Airport, Chennai-27
Construction of Compound wall for the bifurcation of operational area and for newly acquired land of AAI at Tuticorin Airport ( Phase -II)
2019_AAI_23704_1
2019_AAI_23704_1
Open Tender
Civil Works
Item Rate
270 days
TUTICORIN
Please refer Tender documents.
12 documents required · 12 mandatory
₹3,540
Airports Authority of India
₹24.5 L
30 Jun 2021
9 Mar 2019
27 Mar 2019
9 Mar 2019
21 Mar 2019
9 Mar 2019
9 Mar 2019 - 21 Mar 2019
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock
Carriage of material by mechanical transport including loading, unloading and stacking. a)Earth for lead of 2 km.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone
b) 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone
Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns, piers, abutments, pillars,posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : a) 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“ (Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). a) All works upto plinth level
b) All works above plinth level upto floor V level
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. a)Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. a)Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for all heights : a) Foundations, footings, bases of columns, etc. for mass concrete
b) Lintels, beams, plinth beams, girders, bressumers and cantilevers
c) Columns, Pillars, Piers, Abutments, Posts and Struts
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse Sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse Sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. a)In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
12 mm cement plaster of mix a) 1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix: a) 1:6 (1 cement: 6 coarse sand)
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Barbed wire fencing in angle iron post placed at required distance embedded in cement concrete blocks, provided with horizontal lines interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. a) G.I. barbed wire
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Providing, Casting and Erecting RCC pre-cast compound wall in panels of 3.0 meter width, 3.30 meter height (minimum total height) and 0.10 meter thickness as per the following specification and as per the enclosed tentative drawing, including supply of all materials, excavation, foundation, erection of wall panels and scaffolding required for the work etc., complete as follows: i. Earth work excavation for the Pre- cast raft footing and for the compound wall panels. ii. Providing & laying in situ Plain Cement Concrete 1:4:8 (One cement, four sand and eight 40mm BG metal) for 100 mm thickness for the raft footings and for any other required areas. iii. Providing and Casting RC Pre Cast Concrete raft footing of minimum size 1.0m x 1.0m size x 150 mm thick and wall panels of 100 mm thick, 3.0 meter width and 3.30 meter minimum height using M 30 mix as per relevant BIS and with the reinforcements as per BIS. Necessary MS lugs shall be provided in the panels to receive/weld the MS frame work for fixing Concertina coil fence. The rate shall include all labour charges, providing necessary moulds, demoulding after required setting of concrete, lifting using mechanical accessories, etc., complete. The rate shall include necessary curing. iv. Erecting the raft footings over the PCC base under para (ii) above,and erecting the vertical compound wall panels over the above raft footing in the earmarked alignment using cranes with proper levels, verticality with expansion joints at every 30 meters spacing. v. Providing & laying in situ RCC, M30 mix concrete for counterfort retaining wall (to keep the vertical panel wall in correct alignment and verticality). Grouting the expansion joints with necessary chemical grouts. vi. Back filling the excavated trench with the excavated earth and consolidation of the same to the required level. vii. Anchor bolt for fixing Y angles (cost excluding Y- angles) The rate shall be inclusive of conducting the, preparing design & drawing duly vetted by a Reputed Govt.Engineering Institution and carrying out the works as per approved drawings, checking the structural stability etc., and all necessary works for a complete Design and Build Construction on a Turnkey procedure as per the Direction of Engineer-In-Charge.
Total excluding GST
Add prevailing GST @18%
THREEKAY BUILDERS
Stanch Projects Private Limited
G ILANGUMARAN
Naagar Infrastructure Pvt Ltd
S.Thartius Engineering Contractors
Renaatus Projects Pvt Ltd
TTK Construction
DMW Infrastructures India Private Limited
R R THULASI BUILDERS (I) PVT LTD
M.D. ESTHAPPAN INFRASTRUCTURES (P) LTD
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .