| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹2.1 L+₹12,540 (6.28%)Rejected-Finance | L2 | Rejected-Finance Highest | |
| 3 | L3₹2.2 L+₹19,331 (9.68%)Rejected-Finance | L3 | Rejected-Finance Highest |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
22 Jan 2022, 1:00 pmClosed
SE EDC-I, Mathura
Near Kali Mandir, Mathura Cantt, Mathura
The work of Construction HT/LT Line and Double Pole and other work for realeasing new connection at various places under Deposit Scheme in jurisdiction of E.D.D.-Ist, Mathura
2022_DVVNL_670426_1
68/EDC-I(M)/2021-22
Open Tender
Electrical Works
Item Rate
180 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
Dvvnl Agra
₹2,000
Yes
20 Oct 2022
3 Jan 2022
22 Jan 2022
3 Jan 2022
22 Jan 2022
3 Jan 2022
Amount
Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 11/13 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 100 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
Carriage of 25 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
Carriage of 16 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of single pole structure 11/13 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 13 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing and binding of Arial Bunch Conductor size 3x50/95/120 sqmm. on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual.
Fixing of LT Distribution Box of erected pole including jumpering of service cable connectons as per direction by supervising engineer.
Chopping of Tree branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc.
Mounting of 100 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Mounting of 25 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Mounting of 16 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Cutting of CC Road for making depth foundation for erection of pole.
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
Shanti Enterprises
GIRDHAR LAL AND SONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .