| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-Finance | ₹9.4 L | L1 | Accepted-Finance ok |
| 2 | L2₹9.4 LAccepted-Finance | ₹9.4 L | L2 | Accepted-Finance ok |
| 3 | L3₹9.4 LAccepted-Finance | ₹9.4 L | L3 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | ELECTRO POWER SERVICES AND SOLUTIONS L2 | KPS ENTERPRISES L1 | exSel Corporation L3 |
|---|---|---|---|---|---|---|
| 1.00Scope: Supply , installation and configuration of Gateway for telementary data over IEC104 protocal to SLDC Lucknow and Modipuram at 132kV S/s Colonenganj under ETD GONDA. | ||||||
| 1.01 | Providing & Installation of New Gateway at 132kV S/s Colonenganj under ETD GONDA with following specification as follows -
(1) Multiple-Master Communication capabil
(2) Support IEC60870-5-101/103/104, DNP3serial/TCP MODBUS RTU/ASCII/TCP,IEC62056-DLMS, IEC61850, SNMP, SNTP,MQTT
(3) Data Point Support:-5000
(4) Port Connectors: 4 Serial (RS232/485) and 2 Ethernet
(5) Power Supply (AC-DC) 85-265VAC 50-60HZ or 100-370VDC
(6) Realiability: IEC61850-3 complitant hardware,
(7) Time Sync based on NTP/SNTP/NEMA/Protoco specific Synchronization (IEC104/DNP3.0etc)
Suitable for Existing ALSTOM Make SCADA System as Installed at 132kV S/s Colonenganj under ETD GONDA work Included as Installation & all Software configuration and its testing if required as per site condition. | 1 | Nos. | 2,15,000 ₹2.1 L | 2,13,500 ₹2.1 L | 2,15,000 ₹2.1 L |
| 1.02 | Following work to be carried out for Lucknow SLDC -
Work Included:-
(a)Complete checking of SAS gateway panel included architecture and settings.
(b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Lucknow
(c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Lucknow | 1 | Nos. | 99,500 ₹99,500 | 99,400 ₹99,400 | 1,00,000 ₹1 L |
| 1.03 | Following work to be carried out for Modipuram ALDS -
Work Included:-
(a)Complete checking of SAS gateway panel included architecture and settings.
(b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Modipuram.
(c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Modipuram. | 1 | Nos. | 99,500 ₹99,500 | 99,400 ₹99,400 | 1,00,000 ₹1 L |
| 1.04 | IEC61850 based BCPUs. ICD/.CID file configuration of ALSTOM make relays for 132kV & 33kV Feeders.
i). 132kV Feeders-7Nos
ii). 33kV Feeders-12Nos | 19 | Nos. | 8,500 ₹1.6 L | 8,450 ₹1.6 L | 8,500 ₹1.6 L |
| 1.05 | Supply and Installation of GPS time synchronization receiver with display Suitable to make all BCPUs/Relays must be time synch. | 1 | Nos. | 1,97,500 ₹2.0 L | 1,97,500 ₹2.0 L | 1,98,000 ₹2.0 L |
| 1.06 | Providing and installation of the UPS 1KVA of backup of 30min. | 2 | Nos. | 12,300 ₹24,600 | 12,300 ₹24,600 | 12,500 ₹25,000 |
Tender Value
₹9.4 L
EMD Value
₹9,411
Closing Date
27 Mar 2026, 12:00 pmClosed
SE ETC Gonda
OFFICE OF SE ETC GONDA, 220 KV SUBSTATION CAMPUS JAIL ROAD GONDA
WORK
2026_UPTCL_1127214_1
09/ETC(GD)/2025-26
Open Tender
Miscellaneous Works
30 days
GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
EE ETD GONDA
₹9,411
15 Apr 2026
18 Mar 2026
27 Mar 2026
18 Mar 2026
27 Mar 2026
18 Mar 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: SUPERINTENDING ENGINEER, ELECTRICITY TRANSMISSION CIRCLE - GONDA.
Name of Work:- Work for installation, supply and configuration of Gateway for telementary data over IEC104 protocal to SLDC Lucknow and Modipuram at 132kV S/s Colonenganj under Electricity Transmission Circle – Gonda.
Tender No: E-Tender No- 09/ETC(GD)/2025-26, Due on 27.03.2026
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Work/Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Scope: Supply , installation and configuration of Gateway for telementary data over IEC104 protocal to SLDC Lucknow and Modipuram at 132kV S/s Colonenganj under ETD GONDA. 6Core x 2.5 Sq mm
1.01 Providing & Installation of New Gateway at 132kV S/s Colonenganj under ETD GONDA with following specification as follows - (1) Multiple-Master Communication capabil (2) Support IEC60870-5-101/103/104, DNP3serial/TCP MODBUS RTU/ASCII/TCP,IEC62056-DLMS, IEC61850, SNMP, SNTP,MQTT (3) Data Point Support:-5000 (4) Port Connectors: 4 Serial (RS232/485) and 2 Ethernet (5) Power Supply (AC-DC) 85-265VAC 50-60HZ or 100-370VDC (6) Realiability: IEC61850-3 complitant hardware, (7) Time Sync based on NTP/SNTP/NEMA/Protoco specific Synchronization (IEC104/DNP3.0etc) Suitable for Existing ALSTOM Make SCADA System as Installed at 132kV S/s Colonenganj under ETD GONDA work Included as Installation & all Software configuration and its testing if required as per site condition. 0.0 Nos. Excess(+) Full Conversion INR
1.02 Following work to be carried out for Lucknow SLDC - Work Included:- (a)Complete checking of SAS gateway panel included architecture and settings. (b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Lucknow (c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Lucknow 0.0 Nos. Excess(+) Full Conversion INR
1.03 Following work to be carried out for Modipuram ALDS - Work Included:- (a)Complete checking of SAS gateway panel included architecture and settings. (b) Programming and Configuration of gateway with address & settings(provided by client) to link from Substation to data centre Modipuram. (c) Complete testing of SAS gateway and complete data communication link b/w Substation to data centre Modipuram. Erection of new 33 KV VCB in proper alignment and cable termination of circuit breaker as per logic for tripping/closing, spring charging/indication/supervision circuit with proper ferruling and checking out of breaker operation from local/remote including earthing & connection of both side jumpers and works related to complete the erection work. All required T&P skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost. 0.0 Nos. Excess(+) Full Conversion INR
1.04 IEC61850 based BCPUs. ICD/.CID file configuration of ALSTOM make relays for 132kV & 33kV Feeders. i). 132kV Feeders-7Nos ii). 33kV Feeders-12Nos 0.0 Nos. Excess(+) Full Conversion INR
1.05 Supply and Installation of GPS time synchronization receiver with display Suitable to make all BCPUs/Relays must be time synch. 0.0 Nos. Excess(+) Full Conversion INR
1.06 Providing and installation of the UPS 1KVA of backup of 30min. 6Core x 2.5 Sq mm 0.0 Nos. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Note: The Rates quoted against each items/work by Bidders herein shall be inclusive GST i.e. (Basic Rate Per Unit + Tax Amount) as applicable.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_2102352.pdf
techsummary_2102352.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2102352.xls
BOQ • 0.23 MB
TD09.pdf
Tender Documents • 1.45 MB
Download all tender documents and submit your bid