Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC | ₹22.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.8 LRejected-AOC | ₹22.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | HATHIKA CONSTRUCTION L2 | LK Constructions L1 |
|---|---|---|---|---|---|
| 1.00Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, Conveyance of surplus earth upto 2Km etc., complete complying with standard specification. | |||||
| 1.01 | For Column | 55.38 | cum | 209.2 ₹11,585.5 | 204.8 ₹11,341.82 Lowest |
| 1.02 | For Beam | 5.6 | cum | 106.4 ₹595.84 | 102 ₹571.2 Lowest |
| 1.03 | drain | 12 | cum | 106.4 ₹1,276.8 | 102 ₹1,224 Lowest |
| 1.04 | sump | 27.4 | cum | 209.2 ₹5,732.08 | 204.8 ₹5,611.52 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying water carrying with all leads of good water compacting and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 10.6 | cum | 5,108.3 ₹54,147.98 | 5,103.9 ₹54,101.34 Lowest |
| 3.00Suppying and erecting shuittering including necessary supports for plane surface in foundation and basement for RCC roof slabbeams , column footing, plinth beam, grade beam, criical piers, sill slabs, steps, etc using suitable mild steel sheets of B. G. 10 stiffened with welded suitable mild steel angles for boardings supported by casuarina props 10cm to 13cm dia spaced at suitable intervals etc complete as directed by thr deopartmental officetrs complying with standard specifications. | |||||
| 3.01 | Column | 79.5 | sqm | 1,231.2 ₹97,880.4 | 1,226.8 ₹97,530.6 Lowest |
| 3.02 | Beam | 42.8 | sqm | 497.6 ₹21,297.28 | 493.2 ₹21,108.96 Lowest |
| 3.03 | drain | 36 | sqm | 497.6 ₹17,913.6 | 493.2 ₹17,755.2 Lowest |
Tender Value
₹23 L
EMD Value
₹23,000
Closing Date
6 Oct 2025, 3:00 pmClosed
Commr
Tiruvannamalai City Municipal corporation
Construction of compound wall and painting , paver block at Anna nagar old booster in Tiruvannamalai city municipal corporation.
2025_MAWS_610845_1
5788/2025/E2
Open Tender
Civil Works
Works
90 days
Tiruvannamalai City Municipal corporation
Places Refer Tender Notices
2 documents required · 2 mandatory
₹0
₹23,000
27 Aug 2026
2 Oct 2025
6 Oct 2025
2 Oct 2025
6 Oct 2025
2 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].