Loading…
Loading…
Tender Value
₹5.6 Cr
EMD Value
₹11.2 L
Closing Date
4 Sept 2026, 5:00 pm
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Resurfacing of 45.00 mtr wide road between TS-02 and pocket 7C pocket-7Cand7B, pocket 7D and 7B along pocket -7D and pocket -7E in sector -18 with five maintenance yeida.WC-01
2026_YEIDA_1178363_14
YEA/GM(PROJECT)/2026/566 DT-18/08/2026
Open Tender
Civil Works
Fixed-rate
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,670
₹11.2 L
21 Aug 2026
21 Aug 2026
7 Sept 2026
21 Aug 2026
4 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Wet Mix Macadam:-Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 1,278 | Cum | 4,195.39 | ₹53,61,708.42 |
| 2 | Providing & applying tack coat bituman emulsion confirming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. On WMM/[email protected]/sqm | 65,178 | Sqm | 23 | ₹14,99,094 |
| 3 | Dense Graded Bituminous Macadam:- Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. | 1,629.45 | Cum | 13,482 | ₹2,19,68,244.9 |
| 4 | Bituminous Concrete:-Providing and laying bituminous concrete with 100-120 ΤΡH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects Road | 1,303.56 | Cum | 17,024.85 | ₹2,21,92,913.47 |
| 5 | Providing and applying 2.5 mm thick road marking strips (retro-reflective) specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour,T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. SOR/2020/16.62/P 263 | 2,025 | Sqm | 520 | ₹10,53,000 |
| 6 | White washing with lime to give an even shade: New work(three or more coats) UPPWD SOR/2020/671 | 2,556 | Sqm | 16 | ₹40,896 |
| 7 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement: 3 coarse sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer in-charge). Based on UP PWD SOR-2020/16.69 | 29.53 | Cum | 6,899.8 | ₹2,03,751.09 |
| 8 | Earth work in excavation banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering rolling each layers with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with roller of maximum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions all leads as per MORTH.(AR/YEIDA) | 2,556 | Cum | 342.5 | ₹8,75,430 |
| 9 | ROYALTY:- Add Royalty Providing, Laying, Spreading & compcting graded stone aggregate to Wet Mix Macadam specification including Premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / bace course on well prepared surface & compacting with vibratory roller to achieved the desired density as per technical specification clause 406 of MORTH (AR) | 1,278 | Cum | 260 | ₹3,32,280 |
| 10 | Add Royalty Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. | 1,629.45 | Cum | 375.72 | ₹6,12,216.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_2215515.xls
BOQ • 0.27 MB
14.pdf
Tender Documents • 3.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].