Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Technical 5TH FLOOR PUNJA BUILDINGS ABOVE SRIRAM SANITARY MG ROAD DHAKSHINA KANNADA DAKSHINA KANNADA KARNATAKA 575003 | DAKSHINA KANNADA | KARNATAKA | 575003 | Admitted-Technical |
Tender Value
Refer Docs
EMD Value
₹4 L
Closing Date
17 Aug 2026, 4:00 pmClosed
Group General Manager (EAST)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
Forming Tie-Up with experienced Design Engineering Associate through MoU for Pre-Bid Engineering Services and Post-Bid Construction Engineering Services for Hydrogen Storage Bullets on an EPC Basis
2026_BandR_920242_1
BandR/EAST/PBTU/ HYDROGEN STORAGE BULLET /ACME/NIT/01
Open Tender
Miscellaneous Works
Works
187 days
Green Ammonia Project, ParadIp
Please refer to Tender Document for Detail
25 documents required · 25 mandatory
₹4,720
Yes
Bridge and Roof Co.India Ltd
₹4 L
Yes
18 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
17 Aug 2026
5 Aug 2026
3 Aug 2026 - 7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | PRE-BID ENGINEERING SERVICES AND POST-BID CONSTRUCTION ENGINEERING SERVICES | - | - | - | - |
| 1 | Design, Engineering And Development Af Detail Fabrication Drawings For Hydrogen Storage Bullet including Civil foundation and associated facilities, Safety Studies, Specifications for Procurement, GADs, Smart 3D Model, Engineering fabrication drawings, Procurement & Construction schemes, Electrical & Instrumentation System studies, Statutory approval from various Statutory State & Central Government bodies, approval of drawings & documents from Owner/PMC, submission of final technical documents, As Builts documents and 3D Model, Pre-commissioning, Commissioning and Operating Manuals for Package as Per Scope of works and Bidding Document requirements. | 1 | LS | - | - |
| 1.1 | ( CONTINUE FROM ABOVE 1.00 )
Pre-Bid Engineering Services
The Design Consultant shall provide all engineering support necessary for successful bid submission, including but not limited to:
• Review of tender specifications, drawings and scope of work.
• Identification of technical deviations and preparation of deviation schedules.
• Preparation of BOQ and engineering quantities.
• Technical support for estimation and costing.
• Preparation/review of technical offer.
• Clarifications during the pre-bid stage.
• Participation in technical discussions with the Client, if required.
• Any other activity to be carried out for submission of tender to Client. | - | - | - | - |
| 1.2 | ( CONTINUE FROM ABOVE 1.10 )
Post-Bid Construction Engineering Services
In the event of award of the contract, the Design Consultant shall provide complete engineering support throughout project execution, including:
• Design and engineering of Hydrogen storage bullet including Civil Foundation.
• Preparation of design calculations.
• Preparation of General Arrangement Drawings.
• Preparation of fabrication drawings.
• Civil, structural and foundation drawings.
• Design calculations for wind, seismic, anchorage, nozzle loading and thermal effects.
• Development of P & ID & PFD
• Preparation of the Thermal/hydraulic /datasheets, preparation of control philosophy, and operating and trip logic system.
• The Engineering contractor shall extensively use latest design software including 3D Modelling with PDS/PDMS software /SP3D | - | - | - | - |
| 1.3 | ( CONTINUE FROM ABOVE 1.20 )
•Review and approval support for vendor documents.
• Resolution of Client/PMC comments.
• Construction engineering support.
• Site engineering assistance.
• Technical support during fabrication, erection, hydrotest and commissioning.
• Assistance for statutory approvals, wherever applicable.
• Preparation of as-built engineering documentation.
• Pre-commissioning and Commissioning Assistance.
• Performance Guarantee and Guarantee for Utility Consumption if required
• Training of Owners personnel if required
• Operation and maintenance manual.
• PESO/CCOE/SIL Classification & Verification / LOPA study
• Safety Studies including HAZAN study, HAZOP study
• Purchasing / Subscribing to the latest softwares required for carrying out the design and engineering works and to fulfill the requirements of the client’s
bid specification.
• Any other activity to be carried out for successful completion of the work relevant to the scope of the consultant. | - | - | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Annexure_D.xls
Additional Documents • 0.08 MB
Commercial Section.zip
Additional Documents • 6.55 MB
ITB Index.xlsx
Additional Documents • 0.02 MB
Technical Section.zip
Additional Documents • 5.47 MB
BOQ_967057.xls
BOQ • 0.36 MB
eNIT_PBTU_MOUNTED_BULLET_PARADIP.pdf
Tender Documents • 1.03 MB
CORRIGENDUM_1_HYDROGEN_STORAGE_BULLET.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .