| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹8.1 LAccepted-AOC | 1st | Accepted-AOC 1st lowest | |
| 2 | 2nd₹8.2 L+₹7,347 (0.91%)Rejected-Finance NINGTHOUKHONG WARD 02 BISHNUPUR MANIPUR | BISHNUPUR | BISHNUPUR | MANIPUR | 795124 | 2nd | Rejected-Finance 2nd lowest | |
| 3 | 3rd₹8.3 L+₹15,787 (1.95%)Rejected-Finance NINGTHOUKHONG WARD NO 03 BISHNUPUR MANIPUR 795126 | NINGTHOUKHONG | BISHNUPUR | MANIPUR | 795126 | 3rd | Rejected-Finance 3rd lowest |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
10 Dec 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr. Manager (E), Contract Department
Office of the Sr. Manager (E), Contract Department, NHPC Ltd., Loktak Power Station, Komkeirap, Manipur-795124
Protection of road erosion at intake point of culvert upstream side at RD 5.388 Km along Loktak-Leimatak road.
2020_NHPC_598112_1
NH-LPS-HOP012(17)/9/2020-CD I and III/902
Open Tender
Civil Works
Works
60 days
NHPC Ltd., Loktak Power Station
Please refer Tender documents.
6 documents required · 6 mandatory
₹560
NHPC Ltd.
₹15,000
Yes
21 Jan 2021
20 Nov 2020
16 Dec 2020
20 Nov 2020
10 Dec 2020
20 Nov 2020
120 days
Amount
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m.b) Hard/Dense Soil.
Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering.(2.1.7) 1:4:8(1 cement:4 coarse sand:8 graded stone aggregate 20 mm normal size)
Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering.(2.1.3) 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20 mm normal size)
Polygonal rubble masonry/R.R masonry (uncoursed/brought to courses)/ squared rubble masonry (uncoursed/brought to courses) with hard stone of approved quality in foundation & plinth in cement mortar 1:3 (1 cement: 3 course sand) i/c levelling up with cement concrete 1:6:12 (1 cement: 6 course sand: 12 stone aggregate 20mm nominal size) at plinth level.
12mm cement plaster 1:4 (1 cement :4 coarse sand)
Back filling behind abutment, wing wall and return walls complete as per drawing and technical specification. 17.3.2 Sandy Materials
Laying reinforced cement concrete pipes NP-3 culverts including pointing ends and fixing collar with cement mortar 1:2 (a) 900mm dia.
Add EPF 0.65%
Add CESS 1%
Add GST @ 12% GST
M/S A. K. IBOYAIMA MEETEI
M/S R.K.YAISKUL SINGH
stage.html
html • 0.05 MB
technical_628443.pdf
PDF • 0.24 MB
techsummary_628443.pdf
PDF • 0.04 MB
finance_628443.pdf
PDF • 0.21 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_628443.pdf
PDF • 0.03 MB
letterofaward.pdf
PDF • 3.68 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .