Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.7 CrAdmitted-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹41.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹42.3 CrAdmitted-Finance 52 SHANTI NAGAR MODEL TOWN PANIPAT OPPOSITE AMAR STEEL SHUTTERING WORKS | PANIPAT | HARYANA | 132103 | ₹42.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹45.2 CrAdmitted-Finance HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹45.2 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Jai Shree Balaji Constn Co. L2 | RAJEEV KUMAR GOEL CONTRACTORS L1 | ROHTASH KUMAR CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.10 | Design construction, testing and commissioning of 2.50 MLD capacity Water Treatment Plant including inlet channel, Alum dozing Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, Pumping machineries and electric cabling. Control panels entire piping network of suitable size, laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT. and Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house include chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (BASED ON SCADA SYSTEM- 2.50 MLD) | 2 | Job | 2,80,00,000 ₹5.6 Cr | 1,95,00,000 ₹3.9 Cr | 2,50,00,000 ₹5 Cr |
| 1.20 | Providing and fixing Horizontal motor pumping set of raw water having head 12.00 m as requirements of discharge 1500 LPM and power capacity 10.00 BHP as ISI Marked | 2 | Each | 1,50,000 ₹3 L | 1,50,000 ₹3 L | 2,40,000 ₹4.8 L |
| 1.30 | Plugging of Household Sockage Pit upto a depth of 6 mtr. and 1 mtr. dia with earth filling including ramming and compaction and placing precast RCC Slab 100 mm thick complete in all respect including cost of material and labour for laying of Sewer line in the street. | 1,800 | Each | 3,000 ₹54 L | 3,770 ₹67.9 L | 3,000 ₹54 L |
| 1.40 | MAIN PUMPING STATIONS 3.00 MLD Design, construction, erection, testing and commissioning of MPS and following components.RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 3.00 MLD average flow with peak factor of 3.00 landscaping of the campus providing and installing of 5 No. Pumping Set of i.e., no. 6300 LPM (378 Cum per hour), 2 no. 2100 LPM (126 Cum per hour)and 2 no. 1100 LPM (66 Cum per hour) with 30 mtr. Head,K9 DI pipe of suitable dia at MPS including welding and screwing of flanges,3 Nos. CI Gear Operated Sluice Gate with SS Spindle,Supply and installation of 2 Nos. mechanical course screens of minimum length 6 mtr for 3.00 MLD, All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS,All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS site through broadband internet facility. The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work,CCTV CAMERAS:-Providing and Installing CCTV 2 Cameras for MPS complete as per satisfaction of the Engineer– in- Charge, ) At MPS Site- 1 No. PTZ speed dome 360 degree 50 x zoom camera, 3 No. 12 mm lens size including 0andM of 5 years after 12 months defect liability and 3 months trail run period. | 1 | Each | 1,75,00,000 ₹1.8 Cr | 1,45,00,000 ₹1.4 Cr | 1,25,00,000 ₹1.3 Cr |
| 1.50 | “Design, construction, erection, testing and commissioning of 3.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including, Landscaping, MCC Panel Room and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device on inlet and outlet, Real Time water quality monitoring with Data collection system (Online analyzer) Piping and Instrumentation works with PLC and SCADA Arrangement for STP along with Synchronizing it with each other including furniture and laboratory equipments as per detail given in the bid document and including following components. Providing and Installing CCTV 4 Nos. Cameras for STP complete as per satisfaction of the Engineer– in- Charge.K9 DI pipe of suitable dia at STP,(4 No. High Mast of 9 mtr. GI Octagonal pole,Providing and installing 2 No. centrifuges,ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH.Supply, erection, testing and commissioning operation and comprehensive annual maintenance of effluent quality monitoring system at 3.00 MLD STP for online (Continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors includig 0andM for 5 Years after
12 months defect liability period and 3 months trial run period. | 1 | Per Job | 4,85,00,000 ₹4.8 Cr | 5,20,00,000 ₹5.2 Cr | 4,70,00,000 ₹4.7 Cr |
| 1.60 | Construction of HT/LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, window and fitting with toilet block including sanitary fittings STP site covered area with RCC framed structure of brick work vitrified glaze tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, covered area 1 sqm. including 0andM of 5 years after 12 months
defect liability and 3 months trail run period. | 250 | Sqm | 26,500 ₹66.3 L | 20,000 ₹50 L | 20,000 ₹50 L |
| 1.70 | Construction of HT/LT Panel room, PLC room, including doors, window and fitting with toilet block including sanitary fittings MPS site covered area with RCC framed structure of brick work vitrified glaze tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, covered area 1 sqm. including 0andM of 5 years after 12 months defect liability and 3 months trail run period. | 25 | Sqm | 26,500 ₹6.6 L | 20,000 ₹5 L | 20,000 ₹5 L |
| 1.80 | Operation and Maintenance of proposed water works with 2.50 MLD capacity water treatment plant , 2.50 MLD WTP at old water works and Sewerage Network whole of the village except STP (disinfection material supplied by the agency) as per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1)Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | 1 | Per Job | 15,90,000 ₹15.9 L | 30,00,000 ₹30 L | 50,00,000 ₹50 L |
| 1.90 | 1st year Operation and maintenance after defect liability period | 1 | Per Job | 17,25,000 ₹17.3 L | 30,00,000 ₹30 L | 50,00,000 ₹50 L |
| 2.00 | 2nd year Operation and maintenance | 1 | Per Job | 18,45,000 ₹18.4 L | 30,00,000 ₹30 L | 50,00,000 ₹50 L |
Tender Value
₹36.7 Cr
EMD Value
₹73.5 L
Closing Date
1 Dec 2023, 3:00 pmClosed
EXECUTIVE ENGINEER
EE PHE Division Narwana
CHHATTAR AUGMENTATION OF WATER SUPPLY SCHEME FOR VILLAGE CHHATTAR MAHAGRAM DISTT JIND CHHATTAR PROVIDING SEWERAGE SCHEME IN VILL CHHATTAR MAHAGRAM DISTT JIND
2023_HRY_327965_1
202389EB6A87 6486 494B A486 FB0510C8F965570PUH
Open Tender
Civil Works
485 days
Narwana
4 documents required · 4 mandatory
₹20,000
₹73.5 L
Yes
14 Dec 2023
9 Nov 2023
1 Dec 2023
9 Nov 2023
1 Dec 2023
9 Nov 2023
Amount
Design construction, testing and commissioning of 2.50 MLD capacity Water Treatment Plant including inlet channel, Alum dozing Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, Pumping machineries and electric cabling. Control panels entire piping network of suitable size, laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT. and Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house include chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (BASED ON SCADA SYSTEM- 2.50 MLD)
Providing and fixing Horizontal motor pumping set of raw water having head 12.00 m as requirements of discharge 1500 LPM and power capacity 10.00 BHP as ISI Marked
Plugging of Household Sockage Pit upto a depth of 6 mtr. and 1 mtr. dia with earth filling including ramming and compaction and placing precast RCC Slab 100 mm thick complete in all respect including cost of material and labour for laying of Sewer line in the street.
MAIN PUMPING STATIONS 3.00 MLD Design, construction, erection, testing and commissioning of MPS and following components.RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 3.00 MLD average flow with peak factor of 3.00 landscaping of the campus providing and installing of 5 No. Pumping Set of i.e., no. 6300 LPM (378 Cum per hour), 2 no. 2100 LPM (126 Cum per hour)and 2 no. 1100 LPM (66 Cum per hour) with 30 mtr. Head,K9 DI pipe of suitable dia at MPS including welding and screwing of flanges,3 Nos. CI Gear Operated Sluice Gate with SS Spindle,Supply and installation of 2 Nos. mechanical course screens of minimum length 6 mtr for 3.00 MLD, All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS,All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS site through broadband internet facility. The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work,CCTV CAMERAS:-Providing and Installing CCTV 2 Cameras for MPS complete as per satisfaction of the Engineer– in- Charge, ) At MPS Site- 1 No. PTZ speed dome 360 degree 50 x zoom camera, 3 No. 12 mm lens size including 0andM of 5 years after 12 months defect liability and 3 months trail run period.
“Design, construction, erection, testing and commissioning of 3.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including, Landscaping, MCC Panel Room and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device on inlet and outlet, Real Time water quality monitoring with Data collection system (Online analyzer) Piping and Instrumentation works with PLC and SCADA Arrangement for STP along with Synchronizing it with each other including furniture and laboratory equipments as per detail given in the bid document and including following components. Providing and Installing CCTV 4 Nos. Cameras for STP complete as per satisfaction of the Engineer– in- Charge.K9 DI pipe of suitable dia at STP,(4 No. High Mast of 9 mtr. GI Octagonal pole,Providing and installing 2 No. centrifuges,ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH.Supply, erection, testing and commissioning operation and comprehensive annual maintenance of effluent quality monitoring system at 3.00 MLD STP for online (Continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors includig 0andM for 5 Years after 12 months defect liability period and 3 months trial run period.
Construction of HT/LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, window and fitting with toilet block including sanitary fittings STP site covered area with RCC framed structure of brick work vitrified glaze tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, covered area 1 sqm. including 0andM of 5 years after 12 months defect liability and 3 months trail run period.
Construction of HT/LT Panel room, PLC room, including doors, window and fitting with toilet block including sanitary fittings MPS site covered area with RCC framed structure of brick work vitrified glaze tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, covered area 1 sqm. including 0andM of 5 years after 12 months defect liability and 3 months trail run period.
Operation and Maintenance of proposed water works with 2.50 MLD capacity water treatment plant , 2.50 MLD WTP at old water works and Sewerage Network whole of the village except STP (disinfection material supplied by the agency) as per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1)Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
Jai Shree Balaji Constn Co.(GSTN-06AKLPK7500N1ZV)
RAJEEV KUMAR GOEL CONTRACTORS(GSTN-NA)
ROHTASH KUMAR CONTRACTOR(GSTN-NA)
Jai Shree Balaji Constn Co.
ROHTASH KUMAR CONTRACTOR
RAJEEV KUMAR GOEL CONTRACTORS
ROHTASH KUMAR CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.21 MB
BOQ_402795.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid