Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.2 L
EMD Value
₹8,318
Closing Date
23 Nov 2026, 6:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE/JFMPD
Ghoradhara, Jhargram
Boulder Pitiching, Drain and Pot Hole maintaince of Putbandh irrigation Scheme
2026_IWD_5083216_1
WBIW/EE/JFMPD/e NIT-08
Open Tender
CIVIL WORKS
Percentage
Gopiballavpur-I
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,318
Yes
6 Nov 2026
6 Nov 2026
25 Nov 2026
6 Nov 2026
23 Nov 2026
6 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes,
trees, plants, upto 30 cm. girth including removing as directed by
Engineer-in-charge. | 1,200 | Sqm. | 2.38 | ₹2,856 |
| 2 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 1,500 | Sqm. | 5.96 | ₹8,940 |
| 3 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.al (63 mm to 45 mm) with moorum screening : | 137.7 | Cum | 129.91 | ₹17,888.61 |
| 4 | Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. & lubricants etc. complete as per specification.
Add cost at site of the materials to arrive at the
complete rate. The compaction factor may be
taken as 0.67.
(The payment is to be made on the basis of the finished compacted volume of moorum.) | 150.88 | Cum | 749.36 | ₹1,13,063.44 |
| 5 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
(B) Do - by fine sand | 10.49 | Cum | 774 | ₹8,122.36 |
| 6 | Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or in foundation or in foundation trenches.. | 34.68 | Sqm. | 28.6 | ₹991.7 |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
a) Pakur Variety | 19.7 | Cum. | 7,252.03 | ₹1,42,872.24 |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(b) Where staging is not required. | 98.26 | Sqm. | 255.05 | ₹25,061.21 |
| 9 | Cost of stone / laterite boulder at quarry site including( Royalty(Royalty certificate in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty of stone/laterite boulder will be deducted from the bills of works)
c) Laterite Boulder (Each weighing 20 kg & upto 40 kg) Following rates of royalty are to be considered till further modification of prevailing rates by the Department of I dustry, Commerce & Enterprises, Govt. of West Bengal for Pachamil sourced stone boulder and laterite boulderand by the Department of Mines & Geology,Government of Jharkhand for stone boulder of Pakur variety
C) laterite boulder : Rs. 36 per Cum | 39.24 | Cum | 1,433.41 | ₹56,239.84 |
| 10 | Labour charges for collecting loose scattered laterite and stone boulders from slope, bed or apron and stacking the same above ground level within a lead of 100 metre and all lifts as per direction of the Engineer - in-charge. | 39.24 | Cum | 244.32 | ₹9,585.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
Tendernotice_2.pdf
PDF • 1.13 MB
BOQ_5199891.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .