Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -42.00% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 L+₹4,340.60 (3.05%)Admitted-Fee/PreQual/Technical/Finance | -40.23% | ₹1.5 L+₹4,340.60 (3.05%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.5 L+₹7,087.20 (4.98%)Admitted-Fee/PreQual/Technical/Finance | -39.11% | ₹1.5 L+₹7,087.20 (4.98%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.5 L+₹8,435.97 (5.93%)Admitted-Fee/PreQual/Technical/Finance | -38.56% | ₹1.5 L+₹8,435.97 (5.93%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.6 L+₹17,166.22 (12.1%)Admitted-Fee/PreQual/Technical/Finance | -35.00% | ₹1.6 L+₹17,166.22 (12.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
20 Jul 2026, 4:00 pmClosed
executive engineer IFC Div Sgr
batamaloo
Flood protection mitigation works at Critical spots at Dachigam nallah from RD 0 to 1500m excluding cost of available crates
2026_IFC_315672_4
08
Open Tender
Civil Works
Percentage
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Ifc Division Srinagar
₹5,000
24 Jul 2026
11 Jul 2026
21 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 81 | cum | 187.3 | ₹15,171.3 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 192.04 | cum | 371.15 | ₹71,275.65 |
| 3 | Dumping stone excl. cost of stones in horizontal on level. | 62.99 | Cum | 237.9 | ₹14,985.32 |
| 3.1 | Supply of stone boulders | 202.43 | Cum | 700 | ₹1,41,701 |
| 4.1 | Carriage of material by mechanical transport including loading unloading and stacking from source to road site.Wire crates from div. store avg. lead 18 km. | 1.7 | M.T | 1,023.35 | ₹1,739.7 |
| 5.1 | Carriage of material by manual transport including loading unloading and stacking from road site to actual site of work.Wire crates avg. lead 200m. | 1.7 | M.T | 211.01 | ₹358.72 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
BOQ_1024776.xls
BOQ • 0.28 MB
Addendum.pdf
PDF • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .