Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
17 Aug 2026, 12:00 pmClosed
EXEUCTIVE OFFICER
NAGAR PALIKA ABUROAD
Construction of Boundary wall Work for old nagar palika land near fish market
2026_DLB_586253_1
SP3-10
Open Tender
Civil Works
Percentage
ABUROAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO, MDRISL
₹5,400
Yes
17 Aug 2026
12 Aug 2026
17 Aug 2026
12 Aug 2026
17 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. 4.10.1 In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. 4.10.1.1 Depth upto 1.5 m | 13.05 | Cum | 229.5 | ₹2,994.98 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :21.1.7 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 2.18 | Cum | 4,575 | ₹9,973.5 |
| 3 | Random rubble masonry with hard stone in foundation and plinth : 25.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) | 13.92 | Cum | 4,860 | ₹67,651.2 |
| 4 | Random rubble masonry with hard stone in superstructure above plinth level and upto two stories. In Cement mortar 1:6 (1 cement : 6 coarse sand | 14.82 | Cum | 5,830 | ₹86,400.6 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 21.1.2 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1.69 | Cum | 5,910 | ₹9,987.9 |
| 6 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : 32.3.3 1:6 (1 cement : 6 fine/ coarse sand) | 117.14 | Sqm | 264 | ₹30,924.96 |
| 7 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 29.26.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 300 | Kg | 144.5 | ₹43,350 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : 32.50.1 Two or more coats on new work | 9 | Sqm | 114 | ₹1,026 |
| 9 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade 32.36.1New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | 130.19 | Sqm | 132.5 | ₹17,250.18 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1041326.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .