Tender Value
Refer Docs
EMD Value
₹64.1 L
Closing Date
5 May 2023, 3:00 pmClosed
Saurav Tyagi
TECHNIP ENERGIES INDIA LTD A4 SECTOR 1 NOIDA UP INDIA PIN CODE 201301
Structural Erection Piping Fabrication and Erection Equipment Erection Insulation Painting and other Associated Works for RPTU Unit of NREP Project at Numaligarh Refinery Limited
2022_NRL_728829_1
TPIL/CONS/NRL/200663C/006
Open Tender
Construction Works
660 days
NUMALIGARH REFINERY ASSAM
As per Tender Documents
6 documents required · 6 mandatory
₹0
₹64.1 L
Yes
At Numaligarh Refinery Project site, Assam
6 Jun 2023
13 Dec 2022
8 May 2023
13 Dec 2022
5 May 2023
16 Jan 2023
14 Dec 2022 - 26 Dec 2022
27 Dec 2022
Amount
STRUCTURAL STEEL ERECTION
Receipt of Structural Materials from OWNER's Store / Storage yard, loading, local transportation up to either Contractor's storage yard / erection site, unloading, assembly, erecetion, alignment, bolting /welding of Fabricated and painted Structural Steel Elements / Structural Modules in position along with supply & fixing of all type of Connection Bolts (Hot Dip Galvanised/Non-Galvanised Permanent bolts) as per Specifications, Layouts and Fabrication Drawings released for IFC. Scope shall include all activities like Bolting, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes and / or during fabrication, mechanical / Electrical / Pneumatic Torque Tightening of Bolts, cleaning, giving final touch up paint where ever required as per specification to the welded /fabricated parts or damage during transportation & erection etc as required complete in all respect. Making necessary arrangement of required labour, equipment, tools & tackles, Cranes, Manlift, steel scaffolding, consumables, etc to execute the works at all heights as per drawings and specifications along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge.(Exclusions: Erection of steel flooring, ladders, stairways, and handrails). Measurement shall be done as per AFC Fabrication drawing weight. Weight of erection bolts shall not be considered for payment.
Supply, Fabrication, surface preparation and Painting as per Painting Specification and installation of Structural Steel including plates etc. for Miscellaneous activities wherever required. Scope also includes preparation of fabrication drawing and getting it approved from owners/consultant.
STRUCTURAL MODULE ASSEMBLY AT GROUND, TRANSPORTATION & ERECTION IN MODULE AT SITE : Receipt of Pre Fabricated Structural Materials from OWNER's storage yard, assembly, erection at ground, alignment, bolting /welding of Fabricated and painted Structural Steel Elements to make Structural Module at yard/site with the pre-fabricated and painted Structural Steel Elements, loading and Transportation of Modules safely through suitable trailer, unloading at erection site and erection of Structural Modules in position along with Supply and fixing of all type of Connection Bolts (Erection, Hot Dip Galvanised/Non-Galvanised Permanent bolts) as per Specifications, Layouts and Fabrication Drawings released for IFC. Scope shall include all activities like Bolting, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes and / or during fabrication, Torque Tightening of Bolts, fixing in line and level, cleaning, giving final touches to the welded parts, etc as required complete in all respect. Making necessary arrangement of required labour, equipment, tools & tackles, with temporary staging and bracing and removal of the same after erection, consumables, etc to execute the works at all heights as per drawings and specifications along with all related works in order that the Structure/module is handed over to the complete satisfaction of the Engineer-in-charge. Maximum sizes of Modules shall be be of length (~15 m), width (~10 m), height(~15m) and weight shall be ~80 mt.
Unloading of pre fabricated structure at owner's storage yard /Laydown Area from vendor's truck/trailor.
HANDRAIL ERECTION
Receipt of fabricated Materials from OWNER's Store / Storage yard loading, local transportation up to Contractor's store / erection site, unloading, assembly, Erection of already fabricated and Painted Handrails as per requirements indicated in Standard Drawings, IFC Layouts and Fabrication Drawings. Scope shall include all activities like Supply and fixing of all type of Connection Bolts (Erection, Hot Dip Galvanized/Non-Galvanized Permanent bolts) as per Specifications, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes, Torque Tightening of Bolts, cleaning, giving final touch up paint as per specifications to the welded/fabricated parts, etc as required complete with all tools & tackles, equipment and labour, for all and heights along with all related works in order that the Handrail is handed over to the complete satisfaction of the Engineer-in-charge. Supply of erection nuts and bolts / fasteners are included in this item. Measurement shall be As per AFC Fabrication Drawings.
For straight handrail
For stair case/inclined handrail
For circular handrail
LADDERS/ CAGE / SAFETY GATE/ SAFETY BARRIER ERECTION
Receipt of Materials from OWNER's Store / Storage yard, loading, local transportation up to Contractor's store / erection site, unloading, assembly, Erection of already fabricated & Painted Ladders /Cage / Safety Gates / Chains with or without cage and safety gate along with Supply and fixing of all type of Connection Bolts (Erection, Hot Dip Galvanized/Non-Galvanized Permanent bolts) as per Specifications, Layouts and fabrication Drawings. Scope shall include all activities like Bolting, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes, Torque Tightening of Bolts, cleaning, giving final touch up painting as per specifications to the welded/Fabricated parts, etc. as required complete with all tools, equipment and labour, for all heights along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge.
Same as above and Ladder and cage
Same as above and Safety gate / chains
Supply, Fabrication & Erection of Structural Steel Materials for Safety Barriers / Gates which are provided at the Entrance of Platforms at any height or location including surface preparation, painting as per Specification & transportation to erection site / laydown area complete in all respects. Supply and fixing of all type of Connection Bolts (Erection, Hot Dip Galvanised/Non-Galvanised Permanent bolts) as per Specifications, Layouts and fabrication Drawings. Scope shall include all activities like Bolting, Welding, Aligning, giving final touch up painting as per specifications to the welded /fabricated parts, etc. as required complete with all tools, equipment and labour, for all depths and heights along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge.
SUPPLY & ERECTION OF BLIND FLOOR
Supplying all Materials (M30 Grade Reinforced Concrete with Fe500D Rebars and admixtures & corrosion inhibitors, CGI Deck Sheets, Shear Lugs, etc) as required related to Blind Floors and Installing the same as per Construction Drawings, Specifications at any elevations (20m to 26m approx. ) and as Directed by Engineer-in-charge all complete for Blind Floor below Air Coolers or for any other Requirement in any type of Structures), complete in all respects including Manpower, Consummables, materials, Construction Equipment, Tools & Tackles, Scaffolding etc.
CGI Deck Sheet of thickness 2.0 mm
CGI Deck Sheet of thickness 1.0 mm
Concrete Grade M30 with Admixtures and Corrosion Inhibitors
Reinforcement Of Grade Fe 500D Uncoated Bars
SUPPLY, FABRICATION & ERECTION MS CHEQUERED PLATE
Supplying MS chequered plate (5 mm to 10 mm thickness), transporting, fabricating, fixing at various levels with help of supports cleat/stiffeners on floors, platforms, stairs, including grinding edges & supplying all bolts, nuts, washers etc., including necessary modification for supporting structure, drilling holes in plates and supporting structure including one coat of inorganic Zinc Silicate primer(Avg. 75 micron thickness), including forming cutouts in chequered plates and reinforcing edges by M.S.strips; providing toe plate of 50x6 mm height all along the edges, complete as per drawing, specifications & as directed by Engineer in Charge.
ERECTION OF GRATING
Receipt of Materials from OWNER's Store / Storage yard, loading, local transportation up to Contractor's store / erection site, unloading, Erection of Pre- fabricated & Painted /Galvanized flooring/Gratings for all types of platforms and as per standard drawings and/or specifications, fixing in line or level, bolting and or welding as necessary ( Ref: TP-1ZZZA-CV-SDD-0003_D2), incorporating cut-outs where shown in drawings, painting as specified and wherever required, repairs of damaged surface coat after erection, complete with all tools, equipment and labour, for all heights as per drawings and as directed by Engineer-in-Charge. Surface as measured on IFC drawing. Openings shall not be deducted if lower than 0.09 m². Cut Outs above 300mm is in the scope of Structural Steel Fabricator Scope. Below 300 mm size, cut out shall be done by Structural erection Contractor as per relevant standard within quoted Price for Grating Items.
For Square/rectangular Gratings
For Circular/Curved Gratings (equipment platform)
Supplying, erecting and fixing of electroforged hot dip galvanised MS self colured 25x5 mm flat (IS2062 Gr.BR) conforming to standards, as edge protection member for openings in Gratings made at site by contractor, all complete as directed by Engineer in charge.
STAIR TREADS ERECTION
Receipt of Materials from OWNER's Store / Storage yard, loading, local transportation up to Contractor's store / erection site, Erection of Treads made up of Gratings as prefabricated panels including delivering the same to the actual site of execution. Scope shall include all activities like Supply and fixing of all type of Connection Bolts (Erection, Hot Dip Galvanized/Non -Galvanized Permanent bolts) as per Specifications, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes, Torque Tightening of Bolts, cleaning, giving final touch up paints as per specifications to the welded parts, etc as required complete with all tools, equipment and labour, for all heights along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge.
For Stair Tread of 900X275 mm
For Stair Tread of 750X275 mm
SUPPLY, FABRICATION AND ERECTION OF ROOFING & SIDE CLADDING
For roofings, wall claddings, side cladding (Minimum 0.50 mm Base metal thickness)
For "S" Type Louvers
Supplying, cleaning, straightening, bending if required, and fixing "Eaves Gutters" of thickness minimum 1(One) mm of Precoated colored Steel sheets with alloy of zinc and aluminium material and to required slope as per drawings including accessories like polyester coated G.I. self drilling self tapping screws having caps matching to suit sheet colour EPDM seals, flashings and all gutter fittings such as drop ends, stop ends, spacers, laps, etc. complete with silicon sealants as per specifications and as directed by Engineer in Charge. (Contractor shall submit detailed drawings and samples for approval)
Supplying, cleaning , straightening, bending if required and fixing "Profiled Ridge Capping/ Single Ridge capping/ Apron / Barge capping/ expansion joint capping" of material to suit the roof sheets with necessary polyester coated G.I. self drilling screws and self drilling stitching screws having caps matching to suit sheet colour and EPDM seals, complete with flashings and silicon sealants as required, as per drawings, specifications and as directed by Engineer in Charge.
Supplying and fixing 2 mm thick Polycarbonate translucent sheets of appropriate shape and corrugation to suit roof profile of sheets including self drilling screws, nuts, washers, etc., complete as specified and directed by Engineer in Charge.
Supplying and fixing MS Gutter straps 40 mm wide x 6 mm thick with polyester coated G.I.fasteners, EPDM seals etc., complete as per drawing, specifications and as directed by Engineer in Charge
Supplying, cutting, jointing and fixing in position ( both in concrete & masonary) PVC rain water pipe of specified diameter jointed with bonding solution of approved quality and make with pressure rating of 4kg/cm2 including tools & labor, clamps, connections etc. all as per approved manufacturer's details
For 110 mm dia O.D.
For 160 mm dia O.D.
NON-SHRINK/EPOXY GROUT
Supply and laying of Non-shrink cementitious grout for grouting of base plates, under base frames or other anchoring elements for structures and/or machines, including roughening & cleaning of surfaces, form-works, chamfering of edges, smoothing of exposed surfaces, Curing, making flush to the existing RCC surface by chipping & finishing, RCC surface to be made wet for 24 hrs. before grouting, providing all tools and labour necessary to complete the work as per drawings and manufacturer’s specifications and as per the directions of Engineer-in-charge. Volume measured on AFC drawings.
Non-shrink cementitious grout as per approved Vendor List, Drawings and Specifications
Epoxy based grout as per approved, Vendor List, Drawings and Specifications
ORDINARY CEMENT SAND GROUT
Supply and laying of Ordinary Cement Sand grout (1:2) under base plates of cross- overs, short pipe supports (not exceeding 1.5 m height) and small operating platforms (not exceeding 2.0 m height) not supporting any equipment, temporary structure like Barricading (height not exceeding 10m), including roughening & cleaning of surfaces, form-works, chamfering of edges, smoothing of exposed surfaces, Curing, making flush to the existing RCC surface by chipping & finishing, providing all tools and labour necessary to complete the work as per drawings and manufacturer’s specifications and as per the directions of Engineer-in-charge.
SUPPLY & APPLICATION OF FIREPROOOFING
Supplying and Applying all types of Fireproofing (Vermiculite Based/ in-situ Concrete/ Sprayed Mortar) as per Specifications, Drawings and Standards for any steel element wherever required, such as columns, beams, wind-bracing, girders, equipment legs, skirts and saddles at any height, either “box” or “contour shaped”, including form-works, supply and installation of reinforcement mesh, primer paint on structural / equipment surface, expanded metal sheet/ lath, nuts, fixing of cover plate (MS edge angle) at both side of top exposed structural beam, cover blocks and hooks, studs, mastic sealing between the Fireproofing edges and the structural steel elements all complete including mobilising/ demobilizing all tools, equipment and labour as required to complete the work to the satisfaction of Engineer-in-Charge. Painting over Fireproofed Surfaces (For both Vermiculite and in-situ Concrete/ Sprayed Mortar Fireproofed Elements): Supplying and Applying of Painting over Fireproofed Surfaces after full curing (minimum gap of 28 days) of all types of Fireproofing applied. The Base Coat shall be a sealer coat of Epoxy Polyamide @ 50 – 75 micron DFT. The Finish Coat shall be of two coats of Acrylic Elastomeric or Polyurethane coating @ 100 – 125 micron DFT per coat. The Finish Coat shall be UV resistant coating system (No 1 of NORSOK standard M-501). The Coating System shall be compatible and approved by the Fireproofing Material Vendor. Fireproofing is including of painting on top surface, application of sealant, fixing of cover plate etc. Inspections and Tests as per relevant technical specifications and codes shall be deemed to be included in the scope Measurement for Fireproofing: Volume measured on IFC drawings, less the volume of the structure profiles. Coating section type shall be as follows (unless otherwise specified) -Box type, for steel sizes up to max 300 mm. of Sectional Depth. -Contour shape type, for steel sizes bigger than 300 mm.
In-situ Cement Concrete (Grade M30) Fireproofing for steel structures, Equipment legs/ saddles
Sprayed mortar Fireproofing for steel structures, Equipment legs/ saddles
Vermiculite Based Fireproofing for steel structures, Equipment legs/ saddles
Same as clause no 11.1 but nut welding and primer painting on structural / equipment surface excluded.
In-situ Cement Concrete (Grade M30) Fireproofing for steel structures, Equipment legs/ saddles
Sprayed mortar Fireproofing for steel structures, Equipment legs/ saddles
Vermiculite Based Fireproofing for steel structures, Equipment legs/ saddles
Structural Modification Works MISCELLANEOUS CUTTING/WELDING WORKS (Not applicable for regular works as per issued drawings but applicable only for specific re-works/ modification works / Miscellaneous works as per directions of E-i-C where reasons for Modification are not attributable to Contractor)
Structural steel dismantling
Gas cutting in Structural beams,plates etc
Grinding in Structural beams, plates at cutting locations etc
Welding in Structural beams,plates etc
Surface Preparation and Painting as per Specification
Re-erection of Structural Steel
Supplying & applying finish coats for all heights including cleaning the surface of dust and loose particles, touching up of damaged primer coat, including all labour, scaffolding, tools, consumables, etc., as per structural steel paints specifications,(TP-1ZZZA-PI-SPE-0003),drawings and as directed by Engineer in Charge.
To surface of structural steel
To Handrailing
Supplying, erecting and fixing of MS Toe Guard conforming to standards / design sketch as edge protection member where ever required, all complete as directed by Engineer in charge.
Supplying, fabricating structural temporary movable barricading with primer painting as per standards/specifications/drawing to use at site where ever reqired as directed by Engineer in Charge.
Supply and installation of expansion bolts of approved make as per drawings, including the cost of the bolts, carting the same to site of work, fixing in position with necessary, tools, labour etc for all heights and depths, drilling holes and fastening as per vendor’s specifications, all complete and as directed
Mechanical Bolts - Anchor Bolt, M12x125/30 (Under Cut) or equivalent
Mechanical Bolts - Anchor Bolt, M16x190/40 (Under Cut) or equivalent
Mechanical Bolts - Anchor Bolt, M20x250/50 (Under Cut) or equivalent
Mechanical Bolts - Anchor Bolt, -M12x25 or equivalent
Mechanical Bolts - Anchor Bolt, -M16x25 or equivalent
Mechanical Bolts - Anchor Bolt, -M20x30 or equivalent
Supply and installation of chemical bolts of approved make as per drawings, including the cost of the bolts, carting the same to site of work, fixing in position with necessary, tools, labour etc for all heights and depths, drilling holes, anchor rods with nuts and washers, and fastening as per vendor’s specifications, complete and as directed
Chemical Anchor Bolts - Rod M12X160 (threaded rod) & Adhesive Capsule M12x110 or equivalent
Chemical Anchor Bolts - Rod M16X190 (threaded rod) & Adhesive Capsule M16x125 or equivalent
Chemical Anchor Bolts - Rod M20X240 (threaded rod) & Adhesive Capsule M20x170 or equivalent
Installation of expansion bolts M 24/200
Drilling of holes square or circular up to 32 mm dia and depth 1000 mm, through reinforced concrete floor or wall and make good complete as directed by Engineer in Charge.
RCC Core cutting of dia 150 mm / 200 mm and depth upto 1200 mm
Erection of Equipment Platforms & Ladders (For Columns and Vertical Vessels etc.) Structural Platforms and Ladders shall be supplied in loose and shall be assembled at ground / in position for erection works.
PIPING WORKS FOR PROCESS UNITS & OFFSITES & UTILITIES
PIPING (ABOVE GROUND) : - Receipt of free issued Materials, transportation of all piping item(s) from Owner's storage point to worksite/work shop; unloading, fabrication including cutting, edge preparation, (inclusive of grinding the edges of pipe, fittings, flanges, Graylock Flanges, etc. to match with the mating edges of uneven/different thickness wherever required); Graylock Flanges, clamps seal rings, Locking arrangement for valves (CSO, CSC, LO, LC): fitup, bending, preheating wherever required, welding, threading, and laying of pipes of all types, material and thickness as per issued Isometric drawings over overhead on racks and at all elevations, connecting with equipment nozzles, strainers, sight glass, steam traps, expansion bellows, orifice assemblies, spray nozzles, rotameters, mixer, special piping inline items, mixer, tappings for pressure gauges, thermowells, sample connections, springs, sample coolers, purging panels and associated tubing, pressure relief valves, desuperheater etc. and fixing of gaskets, bolts, nuts including application of torque wherever required & all other inline instruments and fittings , like elbows, reducers, tees, vents, drains, SW/threaded valves upto 1.5 NB, Steam Supply/ Condensate Recovery stations (Cast/ Fabricated), alignment, Fixing and welding of RF pad measured as 1.5 Times of mother pipe, cleaning & flushing loop wise and system wise by water/compressed air, hydrostatic, pneumatic, vacuum, spark testing , reinstatement, card board blasting, leak test, inertization, hot bolting if required and any other type of testing as specified,
THK. <= 10MM
CARBON STEEL PIPING (NON IBR);
FABRICATION
NB UPTO 24 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
CARBON STEEL PIPING (NACE);
FABRICATION
NB UPTO 24 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
CARBON STEEL PIPING (IBR);
FABRICATION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
NB 26 INCH - 30 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 30 INCH
CARBON STEEL PIPING (H2);
FABRICATION
NB UPTO 14 INCH
ERECTION
NB UPTO 14 INCH
ALLOY STEEL PIPING (SOUR);
FABRICATION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
ALLOY STEEL PIPING (NON IBR);
FABRICATION
NB UPTO 14 INCH
ERECTION
NB UPTO 14 INCH
ALLOY STEEL PIPING (IBR);
FABRICATION
NB UPTO 6 INCH
ERECTION
NB UPTO 6 INCH
STANLESS STEEL PIPING (NON IBR);
FABRICATION
NB UPTO 6 INCH
ERECTION
NB UPTO 6 INCH
STANLESS STEEL PIPING (NACE);
FABRICATION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
NICKEL ALLOY PIPING (NACE);
FABRICATION
NB UPTO 14 INCH
ERECTION
NB UPTO 14 INCH
HASTALLOY PIPING (NACE);
FABRICATION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
CARBON STEEL PIPING (Internal Epoxy Coated);
FABRICATION
NB 4 INCH - 24 INCH
ERECTION
NB 4 INCH - 14 INCH
NB 16 INCH - 24 INCH
CPVC PIPING;Supply, Fabrication and erection of complete CPVC piping as per the isometric issued by EPCM2 in mechanical contractor scope MTO to be issued at later stage by EPCM2 for procurement of CPVC piping. The CPVC pipes and its installation shall conform to IS 15778,
SUPPLY & FABRICATION
NB UPTO 4 INCH
ERECTION
NB UPTO 4 INCH
GALVANISED CARBON STEEL PIPING (THREADED - Seal weld ) Transportation of all piping items from Owner's Storage point to worksite/work shop; fabrication including cutting, threading, and laying of pipes of all types and thickness overhead on racks and at all elevations.
FABRICATION
NB UPTO 3 INCH
ERECTION
NB UPTO 3 INCH
THK. > 10MM AND <= 20MM
CARBON STEEL PIPING (NON IBR);
FABRICATION
NB UPTO 24 INCH
NB 26 INCH - 30 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 30 INCH
CARBON STEEL PIPING (NACE);
FABRICATION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
NB 26 INCH - 30 INCH
NB 32 INCH - 48 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 30 INCH
NB 32 INCH - 48 INCH
CARBON STEEL PIPING (IBR);
FABRICATION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
CARBON STEEL PIPING (H2);
FABRICATION
NB 2 INCH - 14 INCH
ERECTION
NB 2 INCH - 14 INCH
ALLOY STEEL PIPING (SOUR);
FABRICATION
NB UPTO 6 INCH
ERECTION
NB UPTO 6 INCH
ALLOY STEEL PIPING (NON IBR);
FABRICATION
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
ERECTION
NB UPTO 6 INCH
NB 8 INCH - 24 INCH
ALLOY STEEL PIPING (IBR);
FABRICATION
NB 2 INCH - 14 INCH
ERECTION
NB 2 INCH - 14 INCH
STANLESS STEEL PIPING (NON IBR);
FABRICATION
NB UPTO 6 INCH
ERECTION
NB UPTO 6 INCH
STANLESS STEEL PIPING (NACE);
FABRICATION
NB UPTO 6 INCH
NB 8 INCH - 24 INCH
ABOVE 48 INCH
ERECTION
NB UPTO 14 INCH
NB 16 INCH AND ABOVE
NICKEL ALLOY PIPING (NACE);
FABRICATION
NB 2 INCH - 6 INCH
NB 8 INCH - 14 INCH
ERECTION
NB 2 INCH - 14 INCH
CARBON STEEL PIPING (Internal Epoxy Coated);
FABRICATION
NB 26 INCH - 30 INCH
NB 32 INCH - 48 INCH
ERECTION
NB 26 INCH - 30 INCH
NB 32 INCH - 48 INCH
THK. > 20MM AND <= 30MM
CARBON STEEL PIPING (NON IBR);
FABRICATION
NB 2 INCH - 14 INCH
ERECTION
NB 2 INCH - 14 INCH
CARBON STEEL PIPING (NACE);
FABRICATION
NB 2 INCH - 14 INCH
ABOVE 48 INCH
ERECTION
NB 2 INCH - 14 INCH
ABOVE 48 INCH
CARBON STEEL PIPING (H2);
FABRICATION
NB 8 INCH - 14 INCH
ERECTION
NB 8 INCH - 14 INCH
ALLOY STEEL PIPING (SOUR);
FABRICATION
NB 8 INCH - 14 INCH
ERECTION
NB 8 INCH - 14 INCH
ALLOY STEEL PIPING (NON IBR);
FABRICATION
NB 2 INCH - 6 INCH
ERECTION
NB 2 INCH - 6 INCH
ALLOY STEEL PIPING (IBR);
FABRICATION
NB 8 INCH - 14 INCH
NB 16 INCH - 24 INCH
ERECTION
NB 8 INCH - 14 INCH
NB 16 INCH - 24 INCH
STANLESS STEEL PIPING (NACE);
FABRICATION
NB 2 INCH - 14 INCH
ERECTION
NB 2 INCH - 14 INCH
NICKEL ALLOY PIPING (NACE);
FABRICATION
NB 8 INCH - 14 INCH
ERECTION
NB 8 INCH - 14 INCH
THK. > 30MM AND <= 50MM
CARBON STEEL PIPING (NON IBR);
FABRICATION
NB 8 INCH - 14 INCH
ERECTION
NB 8 INCH - 14 INCH
CARBON STEEL PIPING (NACE);
FABRICATION
NB 8 INCH - 14 INCH
NB 16 INCH - 24 INCH
ERECTION
NB 8 INCH - 24 INCH
ALLOY STEEL PIPING (SOUR);
FABRICATION
NB 8 INCH - 14 INCH
ERECTION
NB 8 INCH - 14 INCH
ALLOY STEEL PIPING (NON IBR);
FABRICATION
NB 8 INCH - 14 INCH
ERECTION
NB 8 INCH - 14 INCH
STANLESS STEEL PIPING (NACE);
FABRICATION
NB 8 INCH - 14 INCH
NB 16 INCH - 24 INCH
ERECTION
NB 8 INCH - 24 INCH
STANLESS STEEL PIPING (NON IBR);
FABRICATION
NB 8 INCH - 14 INCH
ERECTION
NB 8 INCH - 14 INCH
STEAM TRACING
Steam Tracing of Pipes / Instruments : Fabrication and Erection of Steam tracing lines including cutting, edge preparation, Cold/Hot Bending, welding, branch connections, vent, drains, instrument & sample point connections, traps, strainers, fabrication and erection of related supports and connection accessories, connecting with steam manifolds and installation of steam traps including isolation valves, terminating up to the drain points/funnel hydrotesting, steam purging, flushing and box-up etc. as per direction of Engg in charge. Necessary welding qualification tests shall be carried out as part of this work. Piping and Fittings shall be Free issue to Contractor. All Other Accessories required for the Steam tracing activities shall be in Contractor scope. Steam/Condensate Manifolds : Taking delivery of material at warehouse, handling, Installation of steam/ condensate manifold, providing of supports, pedestals welding, making ready for hook-up in all respect including marking for tracers identification, Fabrication and erection of necessary supports. Manifolds shall be Free issue to Contractor. The listed below following activities are also to be performed by contractor. a) Taking delivery from warehouse or from the place(s) of storage, handling, loading and unloading, unpacking, on site transportation, Surface preparation of process piping, Dirt, rust and scale removal with a wire brush. Oil and grease films may be removed with a rag and suitable solvent, Making necessary connections with manifolds, steam traps etc as per manifold location plan . Scope also includes the transportation of all loose supplied items from warehouse or place of storage to the site location. b) Installation of the steam tracing in the correct position as per tracing layout drawing/ vendor drawing & fixing the tracing in position as per details as per specification NR-0ZZZZ-PI-SPE-0005. c) Installation & connection of those items supplied loose. d) Application of heat transfer compound, Tracer Bonding with heat transfer cement, weather proofing, spacers, supporting of manifolds as required, supporting (rest, guide & anchoring) of steam tracing wherever required by using primary or secondary steel. Consider Steam Tracing Tubes of Dia upto 1". e) Measurement for payment under this item shall be as per running metre length irrespective of tracer pipe size installed at site.
INSTALLATION OF STRAINERS (ALL TYPES AND ALL RATINGS)
All Types of Valves such as Gate, Globe, Check, Butterfly, Ball, Plug, control, On-Off, safety valves, R.O. valves,control valves, PSV, TSV up to # 2500 class
VALVE RATING: 150# to 600#
NB. 2 INCH
NB. 3 INCH
NB. 4 INCH
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
NB. 24 INCH
NB. 26 INCH
NB. 28 INCH
NB. 30 INCH
NB. 32 INCH
NB. 34 INCH
NB. 36 INCH
NB. 40 INCH
VALVE RATINGS: 900# to 2500#
NB. 2 INCH
NB. 3 INCH
NB. 4 INCH
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
All Types of Valves (Butt welded and Socket welded) such as Gate, Globe, Check, Butterfly, Ball, Plug, control, On-Off, safety valves, R.O. valves, control valves, PSV,TSV ( All Ratings) for small bore
NB. 0.5 INCH
NB. 0.75 INCH
NB. 1 INCH
NB. 1.5 INCH
Bolt Tensioning - Carrying out controlled hydraulic tensioning/tightening of bolted joints on all types of piping as called for in specification TP-1ZZZA-PI-SPE-0005 on already erected system including carrying out alignment of flanges, cleaning of flange surface, supply of all materials for Bolt tensioning, , recording devices, instruments etc; Providing all necessary normal and special equipment, tools & tackles and gadgets, skilled / unskilled labour, specialist, supervisory staff and completing the work in all respects as per specifications and instructions of engineer-in-charge. Some joints may require bolt tensioning more than once, but, payment for one joint shall be made only once. Quoted price also includes requirement of scaffolding, working platforms and all consumables as required for this work. Bolt Tensioning works includes pipeline flanged joints, pipeline to vessel joints including manway covers to girth flanges, equipment joints, tie in joints flange with other related jobs and package vendors at all elevations. Measurement shall be on the basis of no. of flanged joints / pair of flanges.
150# JOINTS
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
NB. 24 INCH
NB. 26 INCH
NB. 28 INCH
NB. 30 INCH
NB. 34 INCH
NB. 36 INCH
NB. 40 INCH
300# JOINTS
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
NB. 24 INCH
NB. 26 INCH
NB. 28 INCH
NB. 36 INCH
600# JOINTS
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
900# JOINTS
NB. 4 INCH
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 18 INCH
1500# JOINTS
NB. 3 INCH
NB. 4 INCH
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
2500# JOINTS
NB. 1.5 INCH
NB. 2 INCH
NB. 3 INCH
NB. 4 INCH
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
Dissimilar Pipe Welding
Dissimilar Welding between SS and CS Pipe (All thickness)
Dissimilar Welding between AS and CS Pipe (All thickness)
Dissimilar Welding between SS and AS Pipe (All thickness)
NON DESTRUCTIVE TESTING
RADIOGRAPHY: - Performance of radiographic inspection on piping of all types & thickness including providing or hiring of all necessary equipment and whatever else even though not explicitly mentioned but required to perform the work as per specifications and instructions of Engineer-in-charge. Rates are inclusive of radiography machine, manpower, consumables etc. and all other equipments required to perform the radiography at all heights including staging Scaffolding to the satisfaction of Engineer-in-charge. Radiographs shall be submitted to the Engineer-in-charge. (Repeat Radiography due to defective radiograph on repaired joints due to Contractor's fault and for additional radiography necessitated due to poor performance of contractor's welders shall be done at contractor's cost and nothing shall be paid as extra)
Film Radiography by Gamma rays / X Rays
Radiography using Close Proximity method with Selenium (Se 75) source / Equivalent source.
Radiography by Digital method (Contractor to provide the Film in digital mode as well as hard copy print of the Film)
DYE PENETRATION/ MAGNETIC PARTICLE TEST : - Performance of Magnetic particle/ dye penetrant test including supply of all necessary materials; equipments and labour for carrying out the work as per specification and directions of Engineer-in-charge.
DYE PENETRATION TEST
MAGNETIC PARTICLE TEST
ULTRASONIC TESTING
Ultrasonic Testing by Advance Method (PAUT). Contractor shall ensure interpretaion of PAUT through NDT Level-III Inspector approved by ASNT.
STRESS RELIEVING : - Carrying out stress relieving of weld joints on all types of piping as called for on shop/site fabricated already erected system including supply of materials, consumables, recording devices, insulation materials, all electrical boards with safety devices safety equipments, instruments etc. providing all normal & special equipment and gadgets, skilled / unskilled labour, specialist, supervisory staff and completing the work in all respects as per specifications and instructions of Engineer-in-charge. Repeat performance due to defective stress relieving or any other account shall be on Contractor's cost (Payment shall be done only after submission and approval of charts. Stress relieving shall be followed by hardness Testing and measurement of hardness and no separate payment shall be made for this). Note: Unit for stress relieving quantity is ' Nos. of circumferential weld joints'
NB. 0.5 INCH
NB. 0.75 INCH
NB. 1 INCH
NB. 1.5 INCH
NB. 2 INCH
NB. 3 INCH
NB. 4 INCH
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
NB. 24 INCH
NB. 26 INCH
NB. 28 INCH
NB. 30 INCH
NB. 34 INCH
NB. 36 INCH
NB. 40 INCH
NB. 80 INCH
HOT INSULATION (Supply & installation) : - Providing thermal insulation including supply of all insulating and ancillary materials, vapour barrier, weather protective coverings, consumables and other necessary materials, testing of materials as required, including transportation of materials to work site, duly inspected by TEN inspector at manufacturer's shop & sample check/inspection at site by TEN Constructhe on, binding, tying, lacing, stitching and/or otherwise securing, finishing with sheet cladding as per spec, providing bolts, rivets and self tapping screws wherever specified, providing inspection windows, end seals for flanges etc., colour coding and identification. Providing steel scaffolding, all tools, tackles, equipments etc., labour, supervision and completing the work in all respect, at all heights as per drawings, specifications NR-0ZZZZ-PI-SPE-0003 and instructions of Engineer-in charge.
INSULATION TYPE:IH / IT, SURFACE MATERIAL :CS & AS, OPERATING TEMP RANGE: UPTO 125 DEG C, INSULATION MATERIAL: ROCKWOOL
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 1 INCHES, THICKNESS 25 MM
NB 1.5 INCHES, THICKNESS 25 MM
NB 2 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 25 MM
NB 4 INCHES, THICKNESS 25 MM
NB 6 INCHES, THICKNESS 25 MM
NB 8 INCHES, THICKNESS 25 MM
NB 10 INCHES, THICKNESS 25 MM
NB 12 INCHES, THICKNESS 25 MM
NB 16 INCHES, THICKNESS 25 MM
NB 18 INCHES, THICKNESS 25 MM
NB 20 INCHES, THICKNESS 25 MM
NB 24 INCHES, THICKNESS 25 MM
NB 32 INCHES, THICKNESS 25 MM
NB 34 INCHES, THICKNESS 25 MM
NB 48 INCHES, THICKNESS 25 MM
NB 52 INCHES, THICKNESS 25 MM
NB 68 INCHES, THICKNESS 25 MM
NB 90 INCHES, THICKNESS 25 MM
INSULATION TYPE: IH / IT, SURFACE MATERIAL :CS & AS, OPERATING TEMP RANGE: ABOVE 125 DEG C UPTO 550 DEG C, INSULATION MATERIAL: ROCKWOOL INSULATION TYPE:IS, SURFACE MATERIAL :CS & AS, OPERATING TEMP RANGE: ABOVE 350 DEG C UPTO 550 DEG C, INSULATION MATERIAL: ROCKWOOL
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 0.5-0.75 INCHES, THICKNESS 40 MM
NB 0.5-0.75 INCHES, THICKNESS 50 MM
NB 0.5-0.75 INCHES, THICKNESS 65 MM
NB 0.5-0.75 INCHES, THICKNESS 90 MM
NB 1 INCHES, THICKNESS 25 MM
NB 1 INCHES, THICKNESS 40 MM
NB 1 INCHES, THICKNESS 50 MM
NB 1 INCHES, THICKNESS 65 MM
NB 1 INCHES, THICKNESS 75 MM
NB 1 INCHES, THICKNESS 90 MM
NB 1.5 INCHES, THICKNESS 100 MM
NB 1.5 INCHES, THICKNESS 25 MM
NB 1.5 INCHES, THICKNESS 40 MM
NB 1.5 INCHES, THICKNESS 50 MM
NB 1.5 INCHES, THICKNESS 65 MM
NB 1.5 INCHES, THICKNESS 75 MM
NB 1.5 INCHES, THICKNESS 90 MM
NB 2 INCHES, THICKNESS 115 MM
NB 2 INCHES, THICKNESS 25 MM
NB 2 INCHES, THICKNESS 40 MM
NB 2 INCHES, THICKNESS 50 MM
NB 2 INCHES, THICKNESS 55 MM
NB 2 INCHES, THICKNESS 65 MM
NB 2 INCHES, THICKNESS 90 MM
NB 3 INCHES, THICKNESS 115 MM
NB 3 INCHES, THICKNESS 100 MM
NB 3 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 40 MM
NB 3 INCHES, THICKNESS 50 MM
NB 3 INCHES, THICKNESS 55 MM
NB 3 INCHES, THICKNESS 75 MM
NB 3 INCHES, THICKNESS 90 MM
NB 4 INCHES, THICKNESS 115 MM
NB 4 INCHES, THICKNESS 125 MM
NB 4 INCHES, THICKNESS 25 MM
NB 4 INCHES, THICKNESS 40 MM
NB 4 INCHES, THICKNESS 55 MM
NB 4 INCHES, THICKNESS 65 MM
NB 4 INCHES, THICKNESS 75 MM
NB 4 INCHES, THICKNESS 90 MM
NB 6 INCHES, THICKNESS 100 MM
NB 6 INCHES, THICKNESS 115 MM
NB 6 INCHES, THICKNESS 140 MM
NB 6 INCHES, THICKNESS 40 MM
NB 6 INCHES, THICKNESS 55 MM
NB 6 INCHES, THICKNESS 65 MM
NB 8 INCHES, THICKNESS 100 MM
NB 8 INCHES, THICKNESS 125 MM
NB 8 INCHES, THICKNESS 140 MM
NB 8 INCHES, THICKNESS 40 MM
NB 8 INCHES, THICKNESS 50 MM
NB 8 INCHES, THICKNESS 65 MM
NB 8 INCHES, THICKNESS 75 MM
NB 8 INCHES, THICKNESS 90 MM
NB 10 INCHES, THICKNESS 115 MM
NB 10 INCHES, THICKNESS 125 MM
NB 10 INCHES, THICKNESS 140 MM
NB 10 INCHES, THICKNESS 40 MM
NB 10 INCHES, THICKNESS 50 MM
NB 10 INCHES, THICKNESS 65 MM
NB 10 INCHES, THICKNESS 75 MM
NB 10 INCHES, THICKNESS 90 MM
NB 12 INCHES, THICKNESS 115 MM
NB 12 INCHES, THICKNESS 125 MM
NB 12 INCHES, THICKNESS 40 MM
NB 12 INCHES, THICKNESS 50 MM
NB 12 INCHES, THICKNESS 65 MM
NB 12 INCHES, THICKNESS 75 MM
NB 14 INCHES, THICKNESS 115 MM
NB 14 INCHES, THICKNESS 40 MM
NB 14 INCHES, THICKNESS 50 MM
NB 14 INCHES, THICKNESS 65 MM
NB 14 INCHES, THICKNESS 75 MM
NB 14 INCHES, THICKNESS 90 MM
NB 16 INCHES, THICKNESS 115 MM
NB 16 INCHES, THICKNESS 40 MM
NB 16 INCHES, THICKNESS 50 MM
NB 16 INCHES, THICKNESS 65 MM
NB 16 INCHES, THICKNESS 75 MM
NB 16 INCHES, THICKNESS 90 MM
NB 18 INCHES, THICKNESS 140 MM
NB 18 INCHES, THICKNESS 155 MM
NB 18 INCHES, THICKNESS 50 MM
NB 18 INCHES, THICKNESS 65 MM
NB 18 INCHES, THICKNESS 75 MM
NB 20 INCHES, THICKNESS 40 MM
NB 20 INCHES, THICKNESS 50 MM
NB 20 INCHES, THICKNESS 75 MM
NB 24 INCHES, THICKNESS 75 MM
NB 26 INCHES, THICKNESS 75 MM
NB 26 INCHES, THICKNESS 50 MM
NB 28 INCHES, THICKNESS 50 MM
NB 30 INCHES, THICKNESS 75 MM
NB 36 INCHES, THICKNESS 75 MM
INSULATION TYPE:IH / IT, SURFACE MATERIAL : SS, OPERATING TEMP RANGE: UPTO 125 DEG C, INSULATION MATERIAL: ROCKWOOL
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 1 INCHES, THICKNESS 25 MM
NB 2 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 25 MM
NB 4 INCHES, THICKNESS 25 MM
NB 6 INCHES, THICKNESS 100 MM
NB 6 INCHES, THICKNESS 25 MM
NB 8 INCHES, THICKNESS 25 MM
NB 10 INCHES, THICKNESS 25 MM
NB 14 INCHES, THICKNESS 25 MM
INSULATION TYPE: IH / IT, SURFACE MATERIAL : SS, OPERATING TEMP RANGE: ABOVE 125 DEG C UPTO 550 DEG C, INSULATION MATERIAL: ROCKWOOL INSULATION TYPE:IS, SURFACE MATERIAL :SS, OPERATING TEMP RANGE: ABOVE 350 DEG C UPTO 550 DEG C, INSULATION MATERIAL: ROCKWOOL
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 0.5-0.75 INCHES, THICKNESS 40 MM
NB 0.5-0.75 INCHES, THICKNESS 65 MM
NB 0.5-0.75 INCHES, THICKNESS 75 MM
NB 1 INCHES, THICKNESS 25 MM
NB 1 INCHES, THICKNESS 40 MM
NB 1 INCHES, THICKNESS 50 MM
NB 1 INCHES, THICKNESS 65 MM
NB 1 INCHES, THICKNESS 75 MM
NB 1 INCHES, THICKNESS 90 MM
NB 1.5 INCHES, THICKNESS 25 MM
NB 1.5 INCHES, THICKNESS 40 MM
NB 1.5 INCHES, THICKNESS 50 MM
NB 1.5 INCHES, THICKNESS 65 MM
NB 1.5 INCHES, THICKNESS 75 MM
NB 1.5 INCHES, THICKNESS 90 MM
NB 2 INCHES, THICKNESS 25 MM
NB 2 INCHES, THICKNESS 40 MM
NB 2 INCHES, THICKNESS 50 MM
NB 2 INCHES, THICKNESS 55 MM
NB 2 INCHES, THICKNESS 65 MM
NB 2 INCHES, THICKNESS 90 MM
NB 3 INCHES, THICKNESS 100 MM
NB 3 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 40 MM
NB 3 INCHES, THICKNESS 50 MM
NB 3 INCHES, THICKNESS 55 MM
NB 3 INCHES, THICKNESS 75 MM
NB 3 INCHES, THICKNESS 90 MM
NB 4 INCHES, THICKNESS 115 MM
NB 4 INCHES, THICKNESS 40 MM
NB 4 INCHES, THICKNESS 55 MM
NB 4 INCHES, THICKNESS 65 MM
NB 4 INCHES, THICKNESS 75 MM
NB 4 INCHES, THICKNESS 90 MM
NB 6 INCHES, THICKNESS 140 MM
NB 6 INCHES, THICKNESS 100 MM
NB 6 INCHES, THICKNESS 115 MM
NB 6 INCHES, THICKNESS 40 MM
NB 6 INCHES, THICKNESS 55 MM
NB 6 INCHES, THICKNESS 65 MM
NB 6 INCHES, THICKNESS 90 MM
NB 8 INCHES, THICKNESS 100 MM
NB 8 INCHES, THICKNESS 125 MM
NB 8 INCHES, THICKNESS 140 MM
NB 8 INCHES, THICKNESS 50 MM
NB 8 INCHES, THICKNESS 65 MM
NB 8 INCHES, THICKNESS 75 MM
NB 8 INCHES, THICKNESS 90 MM
NB 10 INCHES, THICKNESS 115 MM
NB 10 INCHES, THICKNESS 125 MM
NB 10 INCHES, THICKNESS 65 MM
NB 10 INCHES, THICKNESS 75 MM
NB 10 INCHES, THICKNESS 90 MM
NB 12 INCHES, THICKNESS 115 MM
NB 12 INCHES, THICKNESS 125 MM
NB 12 INCHES, THICKNESS 50 MM
NB 12 INCHES, THICKNESS 65 MM
NB 12 INCHES, THICKNESS 75 MM
NB 12 INCHES, THICKNESS 90 MM
NB 14 INCHES, THICKNESS 115 MM
NB 14 INCHES, THICKNESS 140 MM
NB 14 INCHES, THICKNESS 50 MM
NB 14 INCHES, THICKNESS 65 MM
NB 14 INCHES, THICKNESS 75 MM
NB 16 INCHES, THICKNESS 140 MM
NB 16 INCHES, THICKNESS 65 MM
NB 16 INCHES, THICKNESS 75 MM
NB 18 INCHES, THICKNESS 115 MM
NB 18 INCHES, THICKNESS 140 MM
NB 18 INCHES, THICKNESS 90 MM
NB 20 INCHES, THICKNESS 100 MM
NB 20 INCHES, THICKNESS 115 MM
NB 20 INCHES, THICKNESS 140 MM
NB 20 INCHES, THICKNESS 50 MM
NB 20 INCHES, THICKNESS 65 MM
NB 20 INCHES, THICKNESS 75 MM
NB 24 INCHES, THICKNESS 75 MM
NB 72 INCHES, THICKNESS 115 MM
INSULATION TYPE: IS, SURFACE MATERIAL : CS & AS, OPERATING TEMP RANGE: UPTO 350 DEG C, INSULATION MATERIAL: CELLULAR GLASS
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 0.5-0.75 INCHES, THICKNESS 40 MM
NB 1 INCHES, THICKNESS 25 MM
NB 1.5 INCHES, THICKNESS 25 MM
NB 2 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 40 MM
NB 4 INCHES, THICKNESS 25 MM
NB 4 INCHES, THICKNESS 50 MM
NB 6 INCHES, THICKNESS 25 MM
NB 6 INCHES, THICKNESS 50 MM
NB 8 INCHES, THICKNESS 25 MM
NB 10 INCHES, THICKNESS 25 MM
NB 10 INCHES, THICKNESS 40 MM
NB 10 INCHES, THICKNESS 65 MM
NB 12 INCHES, THICKNESS 25 MM
NB 14 INCHES, THICKNESS 25 MM
NB 16 INCHES, THICKNESS 25 MM
NB 18 INCHES, THICKNESS 25 MM
NB 20 INCHES, THICKNESS 25 MM
NB 24 INCHES, THICKNESS 25 MM
NB 36 INCHES, THICKNESS 25 MM
NB 52 INCHES, THICKNESS 25 MM
NB 72 INCHES, THICKNESS 25 MM
NB 80 INCHES, THICKNESS 25 MM
INSULATION TYPE: IS, SURFACE MATERIAL : SS, OPERATING TEMP RANGE: UPTO 350 DEG C, INSULATION MATERIAL: CELLULAR GLASS
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 1 INCHES, THICKNESS 25 MM
NB 1.5 INCHES, THICKNESS 25 MM
NB 2 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 25 MM
NB 4 INCHES, THICKNESS 25 MM
NB 6 INCHES, THICKNESS 25 MM
NB 8 INCHES, THICKNESS 25 MM
NB 10 INCHES, THICKNESS 25 MM
NB 12 INCHES, THICKNESS 25 MM
NB 14 INCHES, THICKNESS 25 MM
NB 16 INCHES, THICKNESS 25 MM
NB 18 INCHES, THICKNESS 25 MM
NB 20 INCHES, THICKNESS 25 MM
NB 24 INCHES, THICKNESS 25 MM
INSULATION TYPE:IH, SURFACE MATERIAL : AS, OPERATING TEMP RANGE: ABOVE 451 DEG C UPTO 500 DEG C, INSULATION MATERIAL : Inner Layer: Rock Wool / Mineral Wool (ASTM C592 / ASTM C547 as applicable) and Outer Layer: Aerogel (ASTM C1728, Type III, Grade 1)
NB 0.5-0.75 INCHES, THICKNESS 75 (65 MM +10 MM)
NB 1 INCHES, THICKNESS 75 (65 MM +10 MM)
NB 1.5 INCHES, THICKNESS 85 (75 MM +10 MM)
NB 2 INCHES, THICKNESS 100 (90 MM +10 MM)
NB 3 INCHES, THICKNESS 100 (90 MM +10 MM)
NB 4 INCHES, THICKNESS 110 (100 MM +10 MM)
NB 6 INCHES, THICKNESS 125 (115 MM +10 MM)
NB 8 INCHES, THICKNESS 125 (115 MM +10 MM)
NB 10 INCHES, THICKNESS 125 (115 MM +10 MM)
NB 12 INCHES, THICKNESS 135 (125 MM +10 MM)
NB 14 INCHES, THICKNESS 135 (125 MM +10 MM)
NB 16 INCHES, THICKNESS 135 (125 MM +10 MM)
NB 18 INCHES, THICKNESS 150 (140 MM +10 MM)
PIPE SUPPORTS
PIPE SUPPORTS (MATERIAL SUPPLIED BY OWNER) : Fabrication, erection (at all elevations) of all types of pipe supports like shoes, cradles, hangers, clamps (of all sizes/thicknesses manufactured by forming method using die), turn buckles, saddles, guides, special supports, pads and trunnion supports, teflon plates etc. of all types including shot blasting, supply and application of one coat of primer, intermediate & final paint, all necessary equipments, consumables, labour, returning surplus materials and scraps etc. to OWNER's storage point and completing work as per drawings, specifications and instructions of Engineer-in-charge. Modifications/rectifications, if required; and adjustments/alignment during precommissioning, commissioning as per the instructions of Engineer-in-charge. Installation of Spring hangers shall be in contractor's scope. The scope of Works also includes grouting of supports, if required as part of Pipe Supports Works within the quoted price which includes supply of grouting materials also and nothing extra shall be payable in this regard. While fabricating the supporting elements the Contractor will ensure that dimensions shown in the drawings match with the site conditions. Additional supports as necessary with the site condition shall be fabricated and erected in accordance with the Standard. The measurement shall be done in MT of finished support. Wastage shall not be considered. Also unlocking of the Spring / hangers / and /or adjusting of turn buckles etc. during commissioning shall be in the scope of Contractor within the quoted price. Welding of supports with mother pipe shall be included in erection rate for Pipe Supports on MT basis.
Pipe Supports for C.S.
Pipe Supports for A.S.
Pipe Supports for S.S.
Pipe Supports for NICKEL ALLOY/Hastalloy
PIPE SUPPORTS (MATERIAL SUPPLIED BY CONTRACTOR) : Supply, Fabrication, erection (at all elevations) of pipe supports like shoes, cradles, hangers, clamps, U-Bolts, turn buckles, saddles, guides, special supports, pads, T post, brackets and trunnion supports etc. of all types including supply and application, shot blasting, one coat of primer, intermediate & final paint, all necessary equipments, consumables, labour, and completing work as per drawings, specifications and instructions of Engineer-in-charge. Modifications/rectifications, if required; and adjustments/alignment during precommissioning, commissioning as per the instructions of Engineer-in-charge. Installation of Spring hangers/strut/sliding plates/Snubber & tie rod shall be in contractor's scope .The scope of Works also includes grouting of supports, if required as part of Pipe Supports Works within the quoted price which includes supply of grouting materials also and nothing extra shall be payable in this regard. While fabricating the supporting elements the Contractor will ensure that dimensions shown in the drawings match with the site conditions. Additional supports as necessary with the site condition shall be fabricated and erected in accordance with the Standard. The measurement shall be done in MT of finished support. Wastage shall not be considered. Also unlocking of the Spring / hangers / and /or adjusting of turn buckles etc. during commissioning shall be in the scope of Contractor within the quoted price.
Carbon Steel Supports
Alloy Steel Supports
Stainless Steel Supports
NICKEL ALLOY/Hastalloy Steel Supports
PAINTING
Supply of paints and primers, preparation of surfaces and application of primer and finish paints, identification ( Line numbering), lettering, stencilling of equipment/piping, colour bands, colour coding, miscellaneous demarcation required as per site engineer such as marking on grade for underground lines/cable trays/trenches etc. As specified including rubdown and touch up of shop primer wherever required, providing scaffolding for all heights, labour, material, tools and tackles, consumables supervision etc. to complete the work in all respects as per Job spec. TP-1ZZZA-PI-SPE-0003 drawings and direction of Engineer-in-Charge for all type of uninsulated piping and insulated piping as specified including pipes, fittings, flanges, supports, valves etc. Surface preparation by blast cleaning and application of first coat of primer (as specified in Painting spec) shall be done in fabrication yard prior to erection. For insulated piping wherever blast cleaning with no primer application is specified (insulated SS), in such cases finish paints shall also be applied in the fabrication yard. The identification marks of the piping and joints shall be noted before blasting and the same shall be transferred on primed surface as per the instructions of Engineer-in-charge. In addition to that any work related which is required for welding of prefabricated free issued pipe spool i.e. paint removing of welding and and repaint as per the isometric requirement.
PAINTING OF UNINSULATED CS/ LTCS/ AS PIPING
OPERATING TEMP GROUP (TABLE-1, 1.2): -14 TO 100 (DEG C) SSPC-SP-10, Primer - Inorganic Zinc Silicate (FP-6), 1 coat, 65 - 75 μm, Primer - Epoxy High build (FP-3A), 1 coat, 170 μm, Primer - Acrylic Polyurethane (FP-1), 1 coat, 40 μm Total Primer DFT = 285 μm Finish Coat - Acrylic Polyurethane (FP-1) - 40 μm will apply after pressure water wash & surface rubbing Cumulative DFT = 325 μm
NB 0.5 - 0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 14 INCHES
NB 16 INCHES
NB 18 INCHES
NB 20 INCHES
NB 24 INCHES
NB 26 INCHES
NB 28 INCHES
NB 30 INCHES
NB 34 INCHES
NB 40 INCHES
OPERATING TEMP GROUP (TABLE-1, 1.3): 101 TO 400 (DEG C) SSPC-SP-10, Primer - Inorganic Zinc Silicate (FP-6), 1 coat, 65 to 75 μm Finish Coat - Silicone Aluminium Paint (FP-8), 2 coats 2x20 =40 μm Cumulative DFT = 105 - 115 μm
NB 0.5-0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 14 INCHES
NB 16 INCHES
NB 18 INCHES
NB 20 INCHES
NB 24 INCHES
NB 26 INCHES
NB 28 INCHES
NB 30 INCHES
NB 36 INCHES
OPERATING TEMP GROUP (TABLE-1, 1.4): 401 TO 550 (DEG C) SSPC-SP-10, Primer - Silicone Aluminium Paint (FP-8), 1 coat, 20 μm Finish Coat - Silicone Aluminium Paint (FP-8), 2 coats 2x20 =40 μm Cumulative DFT = 60 μm
NB 0.5 - 0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
PAINTING UNDER INSULATION OF CS/ LTCS/ AS PIPING :
OPERATING TEMP GROUP (TABLE-2, 2.1.1): -45 TO 200 (DEG C) SSPC-SP-10, Primer - Epoxy Phenolic (FP-10), 1 coat, 125 μm Finish Coat - Epoxy Phenolic (FP-10), 1 coat, 125 μm Cumulative DFT = 250 μm
NB 0.5-0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 14 INCHES
NB 16 INCHES
NB 18 INCHES
NB 20 INCHES
NB 24 INCHES
NB 26 INCHES
NB 28 INCHES
NB 32 INCHES
NB 34 INCHES
NB 36 INCHES
NB 40 INCHES
NB 48 INCHES
NB 52 INCHES
NB 68 INCHES
NB 72 INCHES
NB 80 INCHES
NB 90 INCHES
OPERATING TEMP GROUP (TABLE-2, 2.1.2): -201 TO 540 (DEG C) SSPC-SP-10, Primer - Titanium catalysed inorganic ceramic copolymer, 1 coat, 150 μm Finish Coat - Titanium catalysed inorganic ceramic copolymer, 1 coat, 150 μm Cumulative DFT = 300 μm
NB 0.5-0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 14 INCHES
NB 16 INCHES
NB 18 INCHES
NB 20 INCHES
NB 24 INCHES
NB 26 INCHES
NB 30 INCHES
NB 36 INCHES
PAINTING UNDER INSULATION OF SS PIPING
OPERATING TEMP GROUP (TABLE-2, 2.2.1): -45 TO 200 (DEG C) SSPC-SP-6, Commercial Blast/ For SS SSPC-SP-1 Primer - Epoxy Phenolic (FP-10), 1 coat, 125 μm Finish Coat - Epoxy Phenolic (FP-10), 1 coat, 125 μm Cumulative DFT = 250 μm
NB 0.5-0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 14 INCHES
NB 16 INCHES
NB 18 INCHES
NB 20 INCHES
NB 24 INCHES
OPERATING TEMP GROUP (TABLE-2, 2.2.2): 201 TO 600 (DEG C) SSPC-SP-6, Commercial Blast/ For SS SSPC-SP-1, With non-chloride solvent Primer - Titanium catalysed inorganic ceramic copolymer, 1 coat, 150 μm Finish Coat - Titanium catalysed inorganic ceramic copolymer, 1 coat, 150 μm Cumulative DFT = 300 μm
NB 0.5-0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 14 INCHES
NB 16 INCHES
NB 18 INCHES
NB 20 INCHES
NB 24 INCHES
NB 72 INCHES
Misc. Works (Related to Piping Fabrication and Erection)
MODIFICATION / HOOK-UPS :Cutting, bevelling, fit up, welding of different sizes of CS(IBR/ NON IBR)/AS/SS/Alloy 825/Hastalloy piping of all types and thicknesses in shop, in position, on ground/overhead on rack and at all elevations; transportation of pipes, fittings, flanges etc from owner's storage point to work site/ work shop, making necessary scaffoldings, consumables, machinery, tools, tackles, labour, hydrotesting upto the nearest isolation point and supervision including attending repairs, arranging dewatering pump,hookup with existing lines for completing the work as per the instruction of Engineer-in-charge.
Flame Cutting C.S. Piping IBR/Non IBR
Hacksaw cutting C.S. Piping IBR/Non IBR
Bevelling C.S. Piping IBR/Non IBR (Whether for 01 joint or for two end)
Fitup & welding C.S. Piping IBR/Non IBR
Hydrotesting, flushing, drying etc. of existing lines C.S. Piping IBR/Non IBR including Blinding and Deblinding of existing lines
Flame Cutting SS, NICKEL, HASTALLOY Piping IBR/Non IBR
Hacksaw cutting SS, NICKEL, HASTALLOY Piping IBR/Non IBR
Bevelling SS, NICKEL, HASTALLOY Piping IBR/Non IBR
Fitup & welding SS, NICKEL, HASTALLOY Piping IBR/Non IBR
Hydrotesting, flushing, drying etc. of existing lines SS, NICKEL, HASTALLOY Piping IBR/Non IBR including Blinding and Deblinding of existing lines
Flame cutting A.S. Piping IBR/Non IBR
Hacksaw cutting A.S. Piping IBR/Non IBR
Bevelling A.S. Piping IBR/Non IBR
Fitup & welding A.S. Piping IBR/Non IBR
Hydrotesting, flushing, drying etc. of existing lines A.S. Piping IBR/Non IBR including Blinding and Deblinding of existing lines
Grating Cutting / Modification / Removal
Grinding at weld joint of Dur-O-Lock coupling for Smooth finish to the extent acceptable to Consultant / Licensor.
ERECTION OF BENDS
ERECTION OF BENDS:- Erection of free issued bends, Receipt of free issued Materials, transportation of all piping item(s) from Owner's storage point to worksite/work shop; unloading,
45B 10D BEND, 3 inch, ASTM A312 Gr.TP347 . Sch XXS
45B 10D BEND, 4 inch, ASTM A312 Gr.TP347 . Sch XXS
45B 10D BEND, 3 inch, ASTM A 106 GR.B . Sch XXS
45B 10D BEND, 4 inch, ASTM A 106 GR.B . Sch XXS
90B 10D BEND, 3 inch, ASTM A312 Gr.TP347 . Sch XXS
90B 10D BEND, 4 inch, ASTM A312 Gr.TP347 . Sch XXS
90B 10D BEND, 3 inch, ASTM A 106 GR.B . Sch XXS
90B 10D BEND, 4 inch, ASTM A 106 GR.B . Sch XXS
Supply and Installation of Removable weather shield cover
All material required for weather shielding for flanged joints and pipe including job at site with all required tools to perform job shall be in contractor scope, Job shall be performed as per standard NR-0ZZZZ-PI-SPE-0003.
At nozzle for 4" & below size
At nozzle from 6" to 12" size
At nozzle from 14" to 24" size
Fabrication and Installation of Piping Adaptors for flushing of pipelines before handing over of systems for Piping Works during shutdown. Piping Adaptor Material shall be Free issue to Contractor.
HIRING OF CRANES (OPTIONAL ITEM) INCLUDING MOBILIZATION AND DEMOBILIZATION CHARGES, CRANE OPERATORS, FUEL, LUBRICANTS, ALL CONSUMMABLES AND ACCESSORIES ETC. (10 HRS. IN DAY BASIS). USES FOR MORE THAN 10 HRS. IN A DAY SHALL BE PAYABLE ON NORMAL RATE PRORATE BASIS. The deployment of Cranes under this item is for the special cases and for Scope of work other than normal scope of work mentioned in items of this SOR. The requirement of hiring of Crane shall be as decided by OWNER & CONSULTANT and shall be communicated accordingly during execution of Work.
CRAWLER / HYDRAULIC CRANE OF CAPACITY 200-250 MT
CRAWLER / HYDRAULIC CRANE OF CAPACITY 100-150 MT
CRAWLER / HYDRAULIC CRANE OF CAPACITY 75-100 MT
FIRE WATER PIPING (ABOVE GROUND)
Receipt of Materials, Transportation of all piping items from Owner's storage point to worksite /work shop, fabrication including cutting, edge preparation (including the grinding of edges of pipe, fittings, flanges etc. to match with the mating edges of uneven / different thickness wherever required); fit up, bending, preheating, wherever required, welding, treading and laying of pipes of all types and thicknesses over sleepers, overhead on racks and at all elevations and fixing of gaskets, bolts, nuts including application of torque where ever required & all other inline instruments and fittings like elbows, reducers, tees, piping specials such as mitres and fabricated fittings, vents, drains (but excluding reinforcing Pads), SW valves up to 1.5 NB, alignment, cleaning & flushing by water /compressed air, hydrostatic, pneumatic, vacuum, spark testing and any other type of testing as specified, draining, during by compressed air, performing Positive Materials Identification Tests using alloy analyzers, completing all such Works in all respects as per the specifications, drawings and instructions of Engineer-in-charge. Contractor will follow Technical specification for "Coating of Fire Water Line". For coated pipes, item rates shall be inclusive of application of coating of Weld joints (internal & external) as per Technical specification. The contractor shall provide a detailed field joint lining procedure for review and approval. The procedure shall conform to the requirements of coating Specifications. Erection of Low Friction Pads (Teflon/ Graphite/ SS 304 mirror finish) is inclusive in the quoted Price.
COATED CARBON STEEL PIPING (Galvanized & internal Epoxy)
FABRICATION : BUTT WELD-internal Epoxy
NB 4 Inch to 6 Inch
NB 8 Inch to 14 Inch
NB 16 Inch to 24 Inch
FABRICATION : Threaded-Galvanized
NB up to 1.5 Inch
NB 2 Inch to 3 Inch
ERECTION
NB up to 1.5 Inch
NB 2 Inch to 3 Inch
NB 4 Inch to 6 Inch
NB 8 Inch to 14 Inch
NB 16 Inch to 24 Inch
Spool Drawings preparation for Piping Fabrication using latest Piping Spool Gen Software through specialized agency. Contractor will keep required Technical Manpower at site along with required hardware/computers. Contractor need to update the report on daily basis. Contractor will submit Past track record and take approval of specialized Agency for spooling design and drawing preparation prior to order placement and mobilization of Agency at site.
Suspended / Hanging Type (First time supply, installation and retention up to the required period) including dismantling of the same after completion of Piping, Painting and Insulation Works as per instruction of EIC.
Hiring of 01 No. Pick Up Vehicle with Driver for minimum 2000 KM in a Month basis (Round the clock duty) . Beyond 2000 KM, extra amount shall be payable on Prorate basis.
Extra KM
Hiring of 01 No. Pick Up Vehicle with Driver for minimum 2000 KM in a Month basis for 12 Hours in day. Beyond 2000 KM, extra amount shall be payable on Prorate basis.
Beyond above mentioned working hours
Extra KM
Hiring of 01 No. Passenger Vehicle (XUV 300 / Bolero / Scorpio) with Driver for minimum 3000 KM in a Month basis for 12 Hours in day . Beyond 1500 KM, extra amount shall be payable on Prorate basis.
Beyond above mentioned working hours
Extra KM
ROTARY EQUIPMENTS (PUMPS,COMPRESSORS & ASSOCIATED ITEMS)
PUMPS - CENTRIFUGAL HORIZONTAL
Centrifugal Pump (Horizontal) -OH2, BB2,BB5 & OH6
PUMPS - CENTRIFUGAL VERTICAL TYPE
Centrifugal Pump (Vertical Pit Mounted / Vessel Mounted )
PUMP - RECIPROCATING
Catalyst Transport Oil Pumps (1P30-PA-2801A/B)
HP Purge Oil Pumps (1P30-PA-2809A/B)
PUMP -EBULLATING
Ebullating Pump with Auxiliary skid
COMPRESSOR - RECIPROCATING
Reciprocating Compressor along with auxiliaries skid (1P30-KA-2782 A/B/C) & KOD's, Vendor's scope related Piping & Intercooler. All piping erection works shall be paid as per respective Piping erection items. Weight of Piping items shall not be considered with Equipment weight for payment purpose.
COMPRESSOR - CENTRIFUGAL
Recycle Gas Compressor, 1P31-KA-2783 ( Steam Turbine driven) along with lube oil skid and seal gas skid and associated auxiliaries. All piping erection works shall be paid as per respective Piping erection items. Weight of Piping items shall not be considered with Equipment weight for payment purpose.
Sour Gas Compressor, 1P30-KA-1781 ( motor driven) along with lube oil skid and seal gas skid and associated auxiliaries. All piping erection works shall be paid as per respective Piping erection items. Weight of Piping items shall not be considered with Equipment weight for payment purpose.
PACKAGES
PSA PACKAGE INCLUDING
a. Valves Skid – 60 MT
b. Adsorber Vessel – 15.2 MT per unit, For total 7 nos: 106.4 MT
c. Tail Gas Drum – 55 MT
d. Product Filters: 2 MT
e. PLC Panel – 2 MT
f. Adsorbent Quantity (98 MT for 7 nos of Adsorber Vessels) - 98 MT
CHEMICAL DOSING PACKAGE
MEMBRANE PACKAGE
LIFTING EQUPMENTS
Installation of Lifting Equipment: Transpiration of EOT Cranes and its accessories from Owner's warehouse / yard to worksite, assembly / sub assembly of the cranes, fixing rails and other electrical ancillaries (trailing cable, bus bar etc as applicable) including load testing at site, arranging necessary loads including their transportation to site and completing the job in all respect as per specifications and to the satisfaction of OWNER /CONSULTANT. Contractor's scope of Work also include certification of EOT Crane from external competent authority.
5 MT- EOT Crane for Recycle Gas Compressor House
20 MT- EOT Crane for Sour Gas Compressor House
30 MT- EOT Crane for Reciprocating Compressor House
MATERIAL HANDLING EQUIPMENT ERECTION-CP BLOCKS/ELECTRIC HOISTS
CP Block- For Heat Exchanger bundle removal & Pumps Maintenance
CP Block - 2 Ton
CP Block - 3 Ton
CP Block - 5 Ton
CP Block - 7.5 Ton
CP Block - 10 Ton
Electric Hoists-For Heat Exchanger bundle removal & Pumps maintenance (HOLD)
EH - 20 Ton
PRESERVATION OF EQUIPMENT (Nitrogen filling for preservation)
Contractor has to do necessary preservation of Equipment Post receipt of equipment and up to handing over during plant commissioning as per Preservation Procedure attached with the Tender Document. Nitrogen cylinder will be provided by OWNER.
STATIC EQUIPMENTS (REACTOR, COLUMNS, VESSELS, HEAT EXCHANGERS, AIR COOLERS ETC.)
Pressure Vessels / Separators / Columns (All type)
Up to 10MT
Above 10 MT and up to 30 MT
Above 30 MT and up to 50 MT
Above 50 MT and up to 100 MT
Above 100 MT
Erection of Carbon Steel COLUMNS
Erection of Equipment (Tag-1227) Scope of Erection includes welding of cirseam joint (Skirt to skirt Joint only) of two section of the column is in scope of contractor which shall be carried out based on approved vendor site activity procedure (to be shared after award of work). Welder, Fitter, Grinder, Rigger, Helper, Field Welding, NDT shall be carried out by Contractor as per Vendor's site fabrication procedure. Stress relieving and Hydrotesting is not envisaged for this work. Vendor supervision may be required for carrying out these activity by Equipment erection contractor. Quality documentation shall be done by Vendor including WPS & PQR. Welding consummables and Touch up Paints shall be supplied by Equipment Vendor. Touch up Painting shall be carried out by Mechanical Contractor.
Erection of Equipment (Tag-1326) Scope of Erection includes welding of cirseam joint (Skirt to skirt Joint only) of two section of the column is in scope of contractor which shall be carried out based on approved vendor site activity procedure (to be shared after award of work). Welder, Fitter, Grinder, Rigger, Helper, Field Welding, NDT shall be carried out by Contractor as per Vendor's site fabrication procedure. Stress relieving and Hydrotesting is not envisaged for this work. Vendor supervision may be required for carrying out these activity by Equipment erection contractor. Quality documentation shall be done by Vendor including WPS & PQR. Welding consummables and Touch up Paints shall be supplied by Equipment Vendor. Touch up Painting shall be carried out by Mechanical Contractor.
Erection of Equipment (Tag-1327)
Erection of Equipment (Tag-2628)
Erection of SS CLADDED COLUMNS
Erectionof Equipment (Tag-0128)
Erection of Equipment (Tag-0129)
Equipment weighing (Tag-1226) Scope of Erection includes welding of cirseam joint (Skirt to skirt Joint only) of two section of the column is in scope of contractor which shall be carried out based on approved vendor site activity procedure (to be shared after award of work). Welder, Fitter, Grinder, Rigger, Helper, Field Welding, NDT & SR shall be carried out by Contractor as per Vendor's site fabrication procedure. Hydrotesting is not envisaged for this work. Vendor supervision may be required for carrying out these activity by Equipment erection contractor. Quality documentation shall be done by Vendor including WPS & PQR. Welding consummables and Touch up Paints shall be supplied by Equipment Vendor. Touch up Painting shall be carried out by Mechanical Contractor.
Erection of Equipment weighing (Tag-2626) Erection of Column shall be in two pieces (Bottom piece of column and Top Piece of Column). Scope of Mechanical Contractor includes following: i) Supply of suitable Cranes with riggers for erection as well holding of top piece of column during welding and alignment. Erection Scheme by Mechanical Contractor. ii) Scaffolding for welding of cirseam Joint in vertical Position and till hydrotesting and clearance. iii) Construction Power and Hydrotesting Water (local Hydrotesting) iv) Touch up Painting (Paint Supply by Equipment Vendor) Note : The Column having one in-situ seam weld joint on Shell in Vertical position only for which welding activity including NDT followed by PWHT, local hydrotesting & touch up painting shall be carried out by Equipment vendor/supplier at site under witnessed by vendor appointed TPIA based on the EPCM Consultant approved TPIA Vendor list . Welder, Fitter, Grinder, Helper etc. for Field Welding, NDT, SR, Hydrotesting etc. are in the scope of Equipment Vendor except providing Cranes, Power supply, Hydrotest Water and Rigging support which shall be provided by Erection Contractor. All the quality documentation for field welding and related activities shall be in the scope of Equipment Vendor.
Erection of Equipment weighing (Tag-2627) Erection of Column shall be in two pieces (Bottom piece of column and Top Piece of Column). Scope of Mechanical Contractor includes following: i) Supply of suitable Cranes with riggers for erection as well holding of top piece of column during welding and alignment. Erection Scheme by Mechanical Contractor. ii) Scaffolding for welding of cirseam Joint in vertical Position and till hydrotesting and clearance. iii) Construction Power and Hydrotesting Water (local Hydrotesting) iv) Touch up Painting (Paint Supply by Equipment Vendor) Note : The Column having one in-situ seam weld joint on Shell in Vertical position only for which welding activity including NDT followed by PWHT, local hydrotesting & touch up painting shall be carried out by Equipment vendor/supplier at site under witnessed by vendor appointed TPIA based on the EPCM Consultant approved TPIA Vendor list . Welder, Fitter, Grinder, Helper etc. for Field Welding, NDT, SR, Hydrotesting etc. are in the scope of Equipment Vendor except providing Cranes, Power supply, Hydrotest Water and Rigging support which shall be provided by Erection Contractor. All the quality documentation for field welding and related activities shall be in the scope of Equipment Vendor.
COLUMN INTERNALS AND TRAYS INSTALLATION INSTALLATION. Installation of Trays, Demister/ packing including seal welding wherever required etc. in Columns /Towers etc. including receipt of materials from Owner's store, local transportation, handling, carting,installation as per drawings / instruction of Owner / Consultant and inpresence of Vendor. Consumable for the seal welding are in scope of Equipment vendor.
Up to 10MT
Above 10 MT and up to 30 MT
Heat Exchangers / Air Coolers / Miscellaneous (Strainers, Mixer & Filters) (All type)
Up to 10MT
Above 10 MT and up to 30 MT
Above 30 MT and up to 50 MT
Above 50 MT and up to 100 MT
Above 100 MT
PACKAGES
Above 10 MT and up to 30 MT
Above 100 MT
UNLOADING OF EQUIPMENT AT SITE (OPTIONAL ITEM)
All inclusive charges for unloading of Equipments from Vehicles arrived at Project Site from outside directly, local Transportation (if any) upto Project Warehouse / Storage point at site, gas cutting of tack welding on the Trucks / trailers, unpacking, stacking etc. as required and as per instruction of Engineer-in-charge.
Up to 10MT
Above 10 MT and up to 30 MT
Above 30 MT and up to 100 MT
HYDROTESTING / RE HYDROTESTING OF HEAT EXCHANGERS/ AIR COOLERS By Erection contractor
Hydrostatic testing of HEAT EXCHANGERS (shell and tube ) single tier or multi tier /AIR COOLERS including dismantling and reassembling of piping connections wherever required, providing blinds and gaskets on nozzles, piping, water hoses, gauges, valves, test pumps and all other temporary arrangement, labour and materials, drying by hot compressed air as per specifications and instructions of Engineer-in-charge. In case, if leakage is found in gaskets and gaskets are replaced, then re hydrotest to be done with new gasket after reassembly.
Hydrotesting of Shell side (Tag-E-1257, E-1259 & E-2659)
Hydrotesting of Tube Side (Tag-E-1257, E-1259 & E-2659)
Re Hydrotesting of tube side in floating heat exchangers if leakage is noticed by drop in pressure and no. of leakage in any of the external joints, hinting at floating head gasket leakage, shell cover is to be opened and tube side is to be filled with water.
Hydrotesting of shell side and tube side simultaneously, keeping the differential pressure between the shell side and the tube side
Insulation of Equipment: 1)Providing thermal insulation including supply of all insulating and ancillary material, heat resistant paint/foils, weather protective covering, consumables and other necessary materials, testing of the material as required including transportation of the materials to work sites, applying insulation on surfaces as specified, including all preparatory works thereon, all binding, tying, lacing, stitching and/or otherwise securing, finishing with plain/corrugated sheet cladding or as specified, providing bolts, rivets, self tapping screws wherever specified, providing inspection windows etc., providing necessary scaffolding, all tools and tackles, equipment, apparatus etc., labour & supervision and completing the work in all respect at all heights as per drawings, specifications and instructions of Engineer-in-charge. The above requirement shall be considered according to Insulation specification for hot insulation of vessels, piping & Equipments (NR-0ZZZZ-PI-SPE-0003, Rev. D2). 2)Insulation area as specified below based on the equipment bare surface.
Insulation Type :- HC
INSULATION THICKNESS :- 25 mm
INSULATION THICKNESS :- 32 mm
INSULATION THICKNESS :- 40 mm
INSULATION THICKNESS :- 45 mm
INSULATION THICKNESS :- 50 mm
INSULATION THICKNESS :- 60 mm
INSULATION THICKNESS :- 65 mm
INSULATION THICKNESS :- 75 mm
INSULATION THICKNESS :- 85 mm
INSULATION THICKNESS :- 100 mm
INSULATION THICKNESS :- 115 mm
INSULATION THICKNESS :- 125 mm
INSULATION THICKNESS :- 140 mm
INSULATION THICKNESS :- 150 mm
Insulation Type :- PP
INSULATION THICKNESS :- 25 mm
Touch-up Painting of Equipment: (Optional Items)
Touch-up Painting of Equipment: (Uninsulated Equipment): Supply and application of Touch-up paint on C.S., L.T.C.S. & low alloy steel vertical vessels, horizontal vessels,drums,heat exchangers, mixers including rubdown wherever required as per specification, providing scaffolding for all heights, labour, materials, tools and tackles, consumables, supervision etc. to complete the work in all respect as per specifications, drawings, equipment details for painting and direction of Engineer-in-Charge for all type of uninsulated equipments.
FIRE FIGHTING EQUIPMENT - SUPPLY AND ERECTION WORK
FIRE FIGTING EQUIPMENT : SUPPLY and ERECTION of fire fighting equipment and spares including transportation of equipments from Contractor's store to works site, supplying and fixing of nuts, bolts, washers, gaskets (as per specs.) needed for fixing the equipment with matching flange etc.
Supply & Installation of Double headed stand post type Fire hydrant valves
i) Stand post
ii) Hydrant valves
iii) Restriction orifice
Supply & Installation of Landing valves for Double Headed Fire Hydrant at technological structures and building
i) Hydrant valves
ii) Restriction orifice
Supply & Installation of Hose Box – Double Door Self-Standing Type for Process Area
Supply & Installation of Hose Box – Double Door Wall-mounting Type for Technological structures and building
Hose Reel – Floor mounting type for Process Area
Hose Reel – Wall-mounting Type for Process Area/Technological structures and building
Water cum foam monitor (750 GPM)
Supply & Installation of High Volume Long Range Water cum Foam Monitor(1000-1500-2000 GPM)
Supply & Installation of Medium Velocity Water Spray Nozzles
Angle-120 (Process Area)
Angle-120 (Cable Cellar)
Supply & Installation of High Velocity Water Spray Nozzles
Angle- 100
Quartzite Bulb Detector (Dry system)
Air Release Valve
Supply & Installation of First-Aid Fire Fighting Equipment
Dry Chemical Powder Extinguisher – 6 kg
Dry Chemical Powder Extinguisher – 9 kg
Dry Chemical Powder Extinguisher – 50 kg
Carbon-Di-Oxide Extinguisher – 4.5 kg
Sand bucket ( 4 buckets in row)
Fist Aid Kit
Safety shower & Eye wash station
Eye wash station
Windsock
FIRE FIGHTING EQUIPMENT - ERECTION WORK
FIRE FIGTING EQUIPMENT : ERECTION of fire fighting equipment including transportation of equipments from owner's store to works site, supplying and fixing of nuts, bolts, washers, gaskets (as per specs.) needed for fixing the equipment with matching flange etc.
Automatic deluge valve
COMMISSIONING ASSISTANCE WORKS FOR RECID PROCESSING TREATING UNIT (RPTU)
Supply of Manpower Services including all Hand Tools including non sparking Tools, recommneded safety PPEs, consummables etc. for Pre Commissioning and Commissioning Assistance Works on Man day basis. Note: Following Works are not considered in Manpower Services as the same is already included in Contractor's Scope of Work as per respective Works Price Items in the Price Schedule. For detail, Contractor to refer Price Schedule, Scope of Work, and SCC : 1) Preservation of Piping & Equipment 2) Contractor shall support pre-commissioning activities up to and including preliminary leak check. 3) All lines flushing/blowing cleaning (steam lines blowing if any) in sub contractor scope until cleanliness signed off by owner/EPCM Consultant . This will include making temporary arrangements, required if any. 4) Rotary Equipment works shall be supported by Contractor until handover and therefore no Contractor man power considered for rotary. 5) Mechanical Contractor scope includes supply of man power and fabrication of hardwares including jumpovers as and when required for catalyst loading and other PCC works. 10) No Contractor manpower assumed for any pre-commissioning activities on the basis that these are included in Mechanical Contractor's scope as per respective Scope of Work. 11) All hand tools (including brass tools), grease etc. are in Contractor's scope.
Foreman / Supervisor
Skilled Manpower (with Hand Tools, Equipment / Machinery, Consumables)
Semi Skilled Manpower (with Hand Tools)
Helper / Unskilled Manpower
CHEMICAL CLEANING OF EQUIPMENT AND PIPING
Supply of Materials, Chemical Cleaning and pickling of Equipment / Pipeline including preparation of circulating loop, supply of Temporary piping, pumps, heater coils, gaskets, thermometer, hydrometer, valve, test coupon, spares, laboratory facilities with all accessories for conducting Test, chemicals, safety accessories PPE and also providing of hiring all necessary equipments and whatever else even though not expressly mentioned herein and in specifications but required to perform the Works as per instructions of Engineer-in-charge.
Cooling water passivation cum on stream cleaning of cooling water system (for both the units)
Chemical Cleaning of Compressor Suction Drums and associated pipings
LUBE OIL SYSTEM FLUSHING (31KA-2783,30KA-2782,30KA-1781 )
Providing Independent Steel Scaffolding
Up to 18 Metre height
Above 18 Metre height
Opening and Boxup of valves / Flanges
Opening or Boxing up of Flanges with new gsket, basket replacement after cleaning of Gasket faces < cutting of gasket from sheets wherever required > inserting or removal of spedacle blind/tail blind wherever necessary to isolate piping, equipments such as column; furnace etc; including supply of tools tackles and manpower necessary to complete the job up to the satisfaction of Engineer In charge, if hot bolting is required it is to be done without any extra cost.
VALVE/FLANGE RATING: 150# to 600#
2 Inch to 3 Inch
4 Inch to 8 Inch
10 Inch to 14 Inch
16 Inch to 18 Inch
20 Inch to 40 Inch
VALVE/FLANGE RATING: 900# to 2500#
2 Inch to 3 Inch
4 Inch to 8 Inch
10 Inch to 14 Inch
16 Inch to 18 Inch
20 Inch to 40 Inch
Decoupling / Coupling of Pumps
Spacer type : Decoupling & Coupling of spacer type flexible coupling excluding spider type for all equipments including removal and box up of coupling guard, all arrangements of tool and tackels, manpower as may be required; Cleaning of parts, checking/ changing spares
Alignment of Pumps
Spacer typ & other coupling: Alignment of equipment with spacer type and other type coupling excluding spider type coupling using suitable method including both cold and hot alingment; includes all arrangements of tools and tackels, manpower as may be required;Cleaning of parts, checking / changing spares Offering NRL for inspection
Bridge and Roof Company
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid