Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-Finance | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹16.3 L+₹1.0 L (6.70%)Rejected-Finance | L2 | Rejected-Finance Agreement With L1 |
| Sl No | Description | Qty | Unit | MUKESH TYAGI L1 | M/S AMAR PAL SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge | 35.78 | M3 | 90 ₹3,220.2 Lowest | 518 ₹18,534.04 |
| 2.00 | Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section. | 301.52 | M3 | 15 ₹4,522.8 Lowest | 100 ₹30,152 |
| 3.00 | C.C. 1:2:4 (M-15) in foundation of Barrel including cost of all labour and T&P etc. Complete. | 17.38 | M3 | 6,400 ₹1,11,257.6 | 5,614 ₹97,593.78 Lowest |
| 4.00 | R.C.C. (M-20) in WING WALL including cost of all labour and T&P etc. Complete. | 88.98 | M3 | 7,200 ₹6,40,692 | 5,000 ₹4,44,925 Lowest |
| 5.00 | R.C.C. (M-25) in Abutment , slab of Barrel including cost of all labour and T&P etc. Complete. | 13.13 | M3 | 8,000 ₹1,05,080 | 7,480 ₹98,249.8 Lowest |
| 6.00 | C.C. (M-25) in Wearing coat over slab including cost of all labour and T&P etc. Complete. | 0.83 | M3 | 7,800 ₹6,497.4 | 6,835 ₹5,693.55 Lowest |
| 7.00 | Ordinary Centering and shuttering work including cost of all labour and T&P etc. Complete. | 23.6 | M2 | 800 ₹18,881.6 | 575 ₹13,571.15 Lowest |
| 8.00 | Special Centering and shuttering work including cost of all labour and T&P etc. Complete. | 227.09 | M2 | 1,050 ₹2,38,445.55 | 575 ₹1,30,577.33 Lowest |
| 9.00 | Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge | 2.85 | M.T. | 74,500 ₹2,12,548.5 | 6,835 ₹19,500.26 Lowest |
| 10.00 | S/F 100 cm. long 110 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 2.25 | R.M. | 250 ₹562.5 | 150 ₹337.5 Lowest |
Tender Value
₹18.0 L
EMD Value
₹36,040
Closing Date
15 Sept 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-06-EE-2026-27 Reconstruction work of damaged V.R.B-cum-Fall located at Km 5.650 of Minor Shakhwaira. Lot No-05
2026_UPIDC_1181263_5
TN-06/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As Per NIT and TD
3 documents required · 3 mandatory
₹944
₹36,040
30 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge | - | M3 | - | - |
| 2 | Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section. | 1 | M3 | - | - |
| 3 | C.C. 1:2:4 (M-15) in foundation of Barrel including cost of all labour and T&P etc. Complete. | - | M3 | - | - |
| 4 | R.C.C. (M-20) in WING WALL including cost of all labour and T&P etc. Complete. | 1 | M3 | - | - |
| 5 | R.C.C. (M-25) in Abutment , slab of Barrel including cost of all labour and T&P etc. Complete. | 1 | M3 | - | - |
| 6 | C.C. (M-25) in Wearing coat over slab including cost of all labour and T&P etc. Complete. | - | M3 | - | - |
| 7 | Ordinary Centering and shuttering work including cost of all labour and T&P etc. Complete. | - | M2 | - | - |
| 8 | Special Centering and shuttering work including cost of all labour and T&P etc. Complete. | 0.4 | M2 | - | - |
| 9 | Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge | - | M.T. | - | - |
| 10 | S/F 100 cm. long 110 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | - | R.M. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2220857.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .