Tender Value
₹52.1 L
EMD Value
₹1.0 L
Closing Date
30 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ADEE/TRD
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnoverof 'V/N or V' whichever is less; where V= Advertised value of the tenderin crores of Rupees N= Number of years prescribed for completion ofwork for which bids have been invited. The average annual contractualturnover shall be calculated as an average of "total contractualpayments" in the previous three financial years, as per the auditedbalance sheet. However, in case balance sheet of the previous year isyet to be prepared/ audited, the audited balance sheet of thefourthprevious year shall be considered for calculating average annualcontractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheet duly certified by the Chartered Accountant/Certificate fromChartered Accountant duly supported by Audited Balance Sheet
The tenderer must have successfully completed or substantiallycompleted any one of the following categories of work(s) during last 07(seven) years, ending last day of month previous to theone in whichtender is invited: (i)Three similar works each costing not less than theamount equal to 30% of advertised value of the tender, or (ii)Two similarworks each costing not less than the amount equal to 40%of advertisedvalue of the tender, or (iii)One similar work costing not less than theamount equal to 60% of advertised value of the tender.(Ref: 10.1 ofGCC) S.
The tenderer should have minimum 33KV Electrical ContractorLicense.They shall submit duly uploading the copy self attested/Digitallysigned by the tenderer or authorized representative of the tendering firmalong with the offer.
similar nature of work ; Execution of 25KV OHE works
28 conditions · 10 needing a document upload
The tenderer shall clearly specify whether the tender issubmitted on his own (Proprietary Firm) or on behalf of aPartnership Firm / company / Joint Venture (JV) / RegisteredSociety / Registered Trust / Hindu Undivided Family (HUF) /Limited Liability Partnership (LLP) etc. The tenderer(s) shallenclose the attested copies of the constitution of their concern,and copy of PAN Card along with their tender.TenderDocuments in such cases are to be signed by such persons asmay be legally competent to sign them on behalf of the firm,company, association, trust or society, as the case maybe. Incase of Partnership firm / Joint Venture (JV) / Hindu UndividedFamily(HUF) / Limited Liability Partnership(LLP)or Partners ofPartnership firm/LLP/etc., the firm should submit the valid Powerof Attorney, Partnership Deed/Article of Association/Memorandum of Association, Board of Resolution, Certificate of Incorporation along with the tender. If the firm is sole proprietor firm, the bidder should submit the supporting document of sole proprietorship firm.
Tenderer should quote his offer along with GST and other taxes
For all the tenders having advertised cost of Rs 10 lakh orabove, the contractor shall have the option to take paymentfrom Railways through a letter of credit (LC) arrangement. Thetenderer shall affirm having read over and agreed to the termsand conditions of the LC option. ivThe above option of takingpayment through LC arrangement, once exercised by tendererat the time of bidding, shall be final and no change shall bepermitted, thereafter, during execution of contract. (TheTenderer should be submit his/their opinion for taking paymentthrough letter of credit (LC) arrangement).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The Bid Security shall be rounded off to the nearest 100. This Bid Security shall be applicable for all modes of tendering. Anyfirm recognized by Department of Industrial Policy andPromotion(DIPP) as 'Startups' shall be exempted from paymentof Bid Security detailed above. Labour Cooperative Societiesshall submit only 50% of above Bid Security detailed above.Subject toexemptions provided above document, the tendermust be accompanied by a Bid Security as mentioned, failingwhich the tender shall be summarily rejected.
The tenderer shall submit along with the tenderdocument,documents in support of his/their claim to fulfill theeligibilitycriteria as mentioned in the tender document. Eachpage of thecopy of documents/certificates in support ofcredentials,submitted by the tenderer, shall be selfattested/digitally signedby the tenderer or authorizedrepresentative of the tenderingfirm. Self-attestation shall includesignature, stamp and date (oneach page). Only those documentswhich are declared explicitlyby the tenderer as "documentssupporting the claim ofqualifying the laid down eligibilitycriteria", will be considered forevaluating his/their tender.
A certificate may be uploaded along with the offer thattheTenderer(s) has/have gone through all the conditions ofcontractand rates, specifications, etc. embodied in IndianRailwayStandard General Condition of Contract-2022 withcorrectionSlips up to the date of closing of the tender
The Railway reserves the right to verify allstatements,information and documents submitted by the bidderin histender offer, and the bidder shall, when so required bytheRailway, make available all such information, evidenceanddocuments as may be necessary for such verification. Anysuchverification or lack of such verification, by the Railway shallnotrelieve the bidder of its obligations or liabilities hereundernorwill it affect any rights of the Railway there under. 2.a) Incase ofany information submitted by tenderer is found to befalseforged or incorrect at any time during process forevaluation oftenders, it shall lead to forfeiture of the tender BidSecuritybesides banning of business for a period of upto fiveyears.(v)The Railway reserves the right to verify allstatements,information and documents submitted by the bidderin histender offer, and the bidder shall, when so required bytheRailway, make available all such information, evidenceanddocuments as may be necessary for such verification. Anysuchverification or lack of such verification, by the Railway shallnotrelieve the bidder of its obligations or liabilities hereundernorwill it affect any rights of the Railway there under. (vi)(a) Incaseof any information submitted by tenderer is found to befalse,forged or incorrect at any time during process forevaluation oftenders, it shall lead to forfeiture of the tender BidSecuritybesides banning of business for a period of upto Twoyears. (b)In case of any information submitted by tenderer isfound to befalse, forged or incorrect after the award of contract,thecontract shall be terminated. Bid Security,PerformanceGuarantee and Security Deposit available with therailway shallbe forfeited. In addition, other dues of thecontractor, if any,under this contract shall be forfeited andagency shall bebanned for doing business for a period of up totwo years
FAMILARISATION: Tenderer should visit the site of theaboveworks and have familiarized him self/them selves of theworkingconditions therein in all respects and in particular thefollowing:1. Topography of the area, 2. Conditions at the site ofwork, 3.Availability of local labour, both skilled and un skilledand theprevailing labour rate, 4. Availability of Water andElectricity, 5.The existing roads and access to the site of work,6. Availabilityof space for putting labour camps, offices, stores,go down,engineering yard etc. NOTE: The FAMILARISATIONcertificateshall be submitted by the tenderer as per formatattached atAnnexures.
The tenderer shall clearly specify whether the tenderissubmitted on his own (Proprietary Firm) or on behalf ofaPartnership Firm / company / Joint Venture (JV) /RegisteredSociety / Registered Trust / Hindu Undivided Family(HUF) /Limited Liability Partnership (LLP) etc. The tenderer(s)shallenclose the attested copies of the constitution of theirconcern,and copy of PAN Card along with their tender.TenderDocuments in such cases are to be signed by suchpersons asmay be legally competent to sign them on behalf ofthe firm,company, association, trust or society, as the case maybe. Incase of Partnership firm / Joint Venture (JV) / HinduUndividedFamily(HUF) / Limited Liability Partnership(LLP)orPartners ofPartnership firm/LLP/etc., the firm should submit thevalid Power of Attorney, Partnership Deed/Article ofAssociation/Memorandum of Association, Board of Resolution,Certificate of Incorporation along with the tender. If the firmissole proprietor firm, the bidder should submit thesupportingdocument of sole proprietorship firm.
The tenderer should go through all the eligibility conditions(likeSpecial Technical Criteria, Standard Technical Criteria,StandardFinancial criterial etc.) as mentioned in the documentandsubmit relevant documents and fill theenclosedformats/annexures in support of the condition. Allthedocuments should be in legible format.
1.TRD works involved in connection with provision of IB signals in between BHNS- BCHL section (9.5km ) of WAT division . 2.TRD works involved in connection with provision of IB signals in between KMLR-BHNS section of Waltair division.3.TRD works involved in connection with Interlocking of 6 Nos. of LC Gates (TVU > 10,000) of Waltair Division: (i) RV-318 between DNV-KMX, (ii) KK-31 between PFU- BHJA, (iii) NG-36 between PHM-PLH, (iv) NG-46 between PLH-SPRM, (v) NG-49 between SPRM-HBF and (vi) NG-56 between HBF-KNGR. of Waltair Division
RGDA-TRD-116-26-27-02~ECOR
RGDA-TRD-116-26-27-02
Open
Works - General
9 Months
Rayagada, Odisha
₹0
₹1.0 L
6 Nov 2026
6 Nov 2026
16 Nov 2026
227 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 9,97,959.65 | ||
| — | 2.00 | Lumpsum | — | ||
| Preparation of design & drawing of Auxiliary Transformer | — | — | — | 6,736 | |
| — | Breakup | for details. | — | ||
| Supply without Insulator and erection of a suspension (9-Tonne) Insulator. | — | — | — | 5,632 | |
| — | Breakup | for details. | — | ||
| Supply without Insulator and erection of 25 kV Post Insulator | — | — | — | 3,318 | |
| — | Breakup | for details. | — | ||
| Supply, Transformers (10 kVA). | — | — | — | 1,87,286 | |
| — | — | — | of | ||
| — | — | — | L.T. | ||
| — | Breakup | for details. | — | ||
| Supply without Insulator and Erection of 25 kV D.O. Fuse Switch. | — | — | — | 24,920 | |
| — | Breakup | for details. | — | ||
| Supply and erection of a structure bond. | — | — | — | 30,900 | |
| — | Breakup | for details. | — | ||
| Supply and erection of a longitudinal bond. | — | — | — | 21,475 | |
| — | Breakup | for details. | — | ||
| Supply & erection of a transverse and special bond. | — | — | — | 22,440 | |
| — | Breakup | for details. | — | ||
| Supply & erection of a single earth electrode. | — | — | — | 16,928 | |
| — | Breakup | for details. | — | ||
| Supply and erection of anticlimbing device for L.T. Supply Transformer Stations. | — | — | — | 2,934 | |
| — | Breakup | for details. | — | ||
| Supply and erection of copper strips for equipment earthing. | — | — | — | 4,216 | |
| — | Breakup | for details. | — | ||
| Supply of 9-Tonne Insulator for 2 | — | — | — | 11,346 | |
| — | Breakup | for details. | — | ||
| Supply of Post insulators for 3 | — | — | — | 14,796 | |
| — | Breakup | for details. | — | ||
| Supply of 25 kV Post Insulator for Item 5 | — | — | — | 29,590 | |
| — | Breakup | for details. | — | ||
| Concrete for Foundation & Trench in Hard Soil | — | — | — | 37,795 | |
| — | Breakup | for details. | — | ||
| Concrete for Foundation & Trench in Rock | — | — | — | 42,335 | |
| — | Breakup | for details. | — | ||
| Concrete for Foundation & Trench in other than Hard Soil & Rock soil | — | — | — | 68,590 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of Fabricated & Galvanised Steel Structures for LT Supply Transformer, Equipment Supporting Structures etc. for SS/Switching Stations (Special Steel Structures Other than Portals and Masts). | — | — | — | 1,42,076.5 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of Fabricated & Galvanised Small Parts Steel for TSS | — | — | — | 36,200.35 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of Earth Leads 50mm X 6mm Mild Steel Laid in the Ground. | — | — | — | 6,775 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of Earth Leads 50mm X 6mm Mild Steel Flat Laid Exposed. | — | — | — | 7,680 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of 8 SWG G.I. Wire for Earthing. | — | — | — | 335 | |
| — | Breakup | for details. | — | ||
| Supply & Erection of Copper Jumper. | — | — | — | 1,748 | |
| — | Breakup | for details. | — | ||
| Supply & Erection of 25 kV Lightning Arrestors (42kV LA). | — | — | — | 90,713 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of 25 kV Caution Boards/Plates. | — | — | — | 2,052 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of Number Plates (Retro-Reflective Type) | — | — | — | 2,352 | |
| — | Breakup | for details. | — | ||
| supply and erection of Main switch with MCB 63A DP with neutral enclosures etc | — | — | — | 4,352 | |
| — | Breakup | for details. | — | ||
| supply and erction of XLPE 70 SQMM 2 CORE Aluminium Cable | — | — | — | 10,973.8 | |
| — | 2.00 | — | — | ||
| supply of GI Split type Arcing Horn set for 10KVA/25KVA/50 KVA Auxiliary Transformer | — | — | — | 472 | |
| — | 3.00 | — | — | ||
| supply of D O Fuse operting Rod | — | — | — | 9,861 | |
| — | 5.00 | — | — | ||
| supply of HSS Drill Bit 17.5mm Taper Shank | — | — | — | 660 | |
| — | 2.00 | — | — | ||
| supply of Alluminium Ladder 11 mtr | — | — | — | 40,856 | |
| — | 2.00 | — | — | ||
| supply of 25 KV Earthing/Discharge Rod | — | — | — | 19,352 | |
| — | 2.00 | — | — | ||
| Supply of 1.6 Ton Tirfer | — | — | — | 25,134 | |
| — | 5.00 | — | — | ||
| supply of Plyster Web sling (3Ton cap) | — | — | — | 2,000 | |
| — | 10.00 | — | — | ||
| SUPPLY OF Rubber Hand Gloves for Elecrric work usage 36KV | — | — | — | 63,130 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TDPDF.pdf
ATTACHMENT
EXP-ATPDF.pdf
ATTACHMENT
ATspecs.pdf
ATTACHMENT
ANEXURE-V.pdf
ATTACHMENT
Anexurer-VA.pdf
ATTACHMENT
ANEXURE-1PDF.pdf
ATTACHMENT
Part-2amenments_compressed.pdf
ATTACHMENT
PART-1GCCAMENDMENTS_compressed1.pdf
ATTACHMENT
GCC_IndianRailways-April-2022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .