Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | L1 | Accepted-AOC 1st | |
| 2 | L2₹7.7 L+₹1.2 L (18.1%)Rejected-AOC H NO 02 NEAR GOVT BOYS SR SEC SCHOOL 121102 | PALWAL | HARYANA | 121102 | L2 | Rejected-AOC ok | |
| 3 | L3₹7.8 L+₹1.3 L (20.0%)Rejected-AOC | L3 | Rejected-AOC ok |
Tender Value
₹7.9 L
EMD Value
₹15,820
Closing Date
17 May 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
C.C.Palwal
Pucca work
2022_HRY_220655_1
2727-55/25A
Open Tender
Civil Works
Item-rate/Agreement basic
30 days
Palwal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹15,820
Yes
6 Jul 2022
11 May 2022
17 May 2022
12 May 2022
17 May 2022
12 May 2022
90 days
Amount
Earth Work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-charge All kind of Soil ( HSR item No. 4.12.1)
Providing and laying in position ready mixed plain cement concrete with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agigated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer -in- charge. All works upto Plinth level : M-15 grade plain cement concrete cum (cement content considered @ 240 kg/cum) (HSR item No. 6.22.2.2)
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced concrete works, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer -in- charge. (Note : Cement content considered in this item is @330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix) All works upto Plinth level (HSR item No. 6.25.1)
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced concrete works, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer -in- charge. (Note : Cement content considered in this item is @330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix) All works above plinth level up to floor IV level (HSR item No. 6.25.2)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns (HSR item No. 6.29.1)
Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, Pillars, Piers, Abutments, Posts, Strutss (HSR item No. 6.29.3)
Steel reinforcement for R.C.C work where not include in the complete rate of R.C.C, including straightening, cutting, bending, placing in position, binding wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect (Note:- Reinforcement shall be measured in length including hooks, if any, seperately for different diameters as actually used in work, excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of bindings & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement).Thermo-Mechanically Treated bars of grade Fe-500D (HSR item No. 6.33.6+6.34.6)
The Tewatia Co-op. L&C Society Ltd.
THE NETRAM COOP MULTIPURPOSE SOCIETY LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .