Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83,793Accepted-AOC | ₹83,793 | L1 | Accepted-AOC L1 |
| 2 | L2₹84,150Rejected-AOC | ₹84,150 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Shri Krishan Road Products L1 | MARUTI BUILDTECH AND LOGISTICS L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying of Go Green Shelmax-PR ready mix bituminous material for instant restoration of patch work, repair of potholes, depression and road cuts to provide uniform and smooth riding surface complete in all respects and all other works contingent thereto. The contractor shall prepare the required surface for maximum results i.e remove standing water/loose debris/dust with brush from potholes, will pour Shelmax-PR directly from the bag into potholes and overfill by 10mm compaction will be done with a simple hand rammer so as to cure quickly enough to open to traffic immediately. The contractor shall arrange all the traffic safety measures during the execution of the above said job and nothing extra shall be paid on this account by the Department.
(The Go Green Shelmax-PR supply will be of packing of 50 Kg HDPE bag with inside LDPE liner). | 51 | Per Bag | 1,643 ₹83,793 | 1,650 ₹84,150 |
Updated dates
Tender Value
₹84,660
EMD Value
₹1,700
Closing Date
18 May 2026, 5:00 pmClosed
Jagmal
DIV Panipat
Shelmac Sector-18 Panipat
2026_HBC_519807_1
20262D966407 982F 403C A7F1 791A6CC7CFBF241HSV
Open Tender
Civil Works
30 days
Panipat
2 documents required · 2 mandatory
₹250
₹1,700
Yes
11 Jun 2026
6 May 2026
19 May 2026
6 May 2026
18 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Providing and laying of Go Green Shelmax-PR ready mix bituminous material for instant restoration of patch work, repair of potholes, depression and road cuts to provide uniform and smooth riding surface complete in all respects and all other works contingent thereto. The contractor shall prepare the required surface for maximum results i.e remove standing water/loose debris/dust with brush from potholes, will pour Shelmax-PR directly from the bag into potholes and overfill by 10mm compaction will be done with a simple hand rammer so as to cure quickly enough to open to traffic immediately. The contractor shall arrange all the traffic safety measures during the execution of the above said job and nothing extra shall be paid on this account by the Department.
(The Go Green Shelmax-PR supply will be of packing of 50 Kg HDPE bag with inside LDPE liner). | 51 | Per Bag | - | - | itemH1Code1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_598702.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid