Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.3 LAdmitted-Finance H NO 399 OXELBERG DHARGAL PERNEM GOA | NORTH GOA | GOA | 403001 | +4.99% | ₹12.3 L | L1 | Admitted-Finance |
| 2 | L2₹12.3 L+₹117.60 (<0.01%)Admitted-Finance H NO 264 1 WARD NO 03 DEULWADA PALIEM PERNEM GOA | +5.00% | ₹12.3 L+₹117.60 (<0.01%) | L2 | Admitted-Finance |
Tender Value
₹11.8 L
EMD Value
₹23,519
Closing Date
9 Sept 2026, 12:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti Panaji Goa
Construction of Front Hall near Shantadurga Devasthan at Moica Wada in V.P. Reis Magos in Reis Magos ZP Constituency.
2026_ZP_31590_1
NGZP/05/2026-27/46/638/L20
Open Tender
Civil Works
Percentage
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹23,519
11 Sept 2026
4 Sept 2026
9 Sept 2026
4 Sept 2026
9 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 1.01 | Foundations, Footings, Bases for columns | 123.2 | Sqm | 407 | ₹50,142.4 |
| 1.02 | Suspended floors, roofs landings, shelves & their supports | 255.98 | Sqm | 644 | ₹1,64,851.12 |
| 2Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 2.01 | In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 8.1 | Cum | 8,034 | ₹65,043.26 |
| 2.02 | In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level | 25.46 | Cum | 8,109 | ₹2,06,427.73 |
| 3 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 2,084.65 | kg | 105 | ₹2,18,888.56 |
| 4 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 61.2 | Cum | 5,186 | ₹3,17,383.2 |
| 5 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. + Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 25.06 | Cum | 6,115 | ₹1,53,217.44 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_31974.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .