Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 27 19 F F D BLOCK CHATTARPUR EXTN SOUTH WEST DELHI DELHI 110075 | SOUTH WEST DELHI | DELHI | 110075 | ₹1.2 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹3.0 L (2.33%)Rejected-Finance | ₹1.3 Cr+₹3.0 L (2.33%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 Cr+₹12.9 L (9.84%)Rejected-Finance A 102 GOLDEN SAND APARTMENTS GAZIPUR DHAKOLI ZIRAKPUR PB 160104 | ZIRAKPUR | S A S NAGAR | PUNJAB | 160104 | ₹1.4 Cr+₹12.9 L (9.84%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | AP BUILDERS L3 | KULWANT SINGH L1 | BAL SINGH AND SONS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of existing damaged flexible pavements/ bitumen surface in single pass by cold milling machine (Wirtgen or equivalent) upto any depth using milling machine fitted with loading conveyer for loading the milled material directly on to trucks for safe disposal with all leads and lifts and disposal of dismantled materials outside the defence land complete all as specified and directed by Engineer-in-Charge. | 708 | Cum | 442 ₹3,12,936 | 150 ₹1,06,200 Lowest | 500 ₹3,54,000 |
| 2.00 | Material and labour for preparing existing black top surface by brushing with wire brushed for removing caked mud etc sweeping with brooms and finally fanning to cleaned surface with gunny bags to remove all loose dirt etc from black top surface and applying evenly a premix /tack coat of bitumen grade VG-10 @ 5.0 Kg per ten Sqm complete all as specified and as directed by Engineer-in-Charge. | 2,169 | XSqm | 250 ₹5,42,250 | 140 ₹3,03,660 Lowest | 300 ₹6,50,700 |
| 3.00 | Material and labour for providing and laying Premix Bituminous macadam of consolidated thickness 25mm to 50mm, using paving bitumen binder of grade VG-30 @ and binder content of 4% by weight of total mix, Mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic paver finisher (Paver shall not be compulsory in case of patch work using B.M.) and as per approved mix, rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 504 MoRTH (5th Rev) specification complete all as specified and as directed by Engineer-in-Charge. Notes :
1.The contractor shall quote the rate against Item considering 4% VG-30 bitumen content. Job Mix Formula as per CI. No. 505.3.3 of MORTH (5th Rev) for BM shall be worked out from Thapar Insti. of Engg & Tech Patiala/ PEC Chandigarh/ Command Test Lab / Maharaja Ranjit Singh Tech University Bathinda for obtaining optimum binder content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to Garrison Engineer for approval. Any variation in binder content on minus side shall be adjusted @ Rs 50/kg of binder and no adjustment shall be made on plus side.
2. The BM shall be covered with top layer/wearing course within in a maximum of 48 hours. If ther is to be any delay, by the contractor the course shall be covered by seal coat to the requirement of Clause 512 of MORTH (5th Rev) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. | 516 | Cum | 7,500 ₹38,70,000 | 7,800 ₹40,24,800 | 5,800 ₹29,92,800 Lowest |
| 4.00 | Material and labour for applying evenly a premix /tack coat of bitumen grade VG-10 @ 4.0 Kg per ten Sqm complete all as specified and as directed by Engineer-in-Charge. | 1,031 | XSqm | 200 ₹2,06,200 | 175 ₹1,80,425 Lowest | 250 ₹2,57,750 |
| 5.00 | Material and labour for providing and laying Premix Bituminous concrete 30mm consolidated thickness with 5.5% binder (paving bitumen of grade VG-30) content by weight of total mix and mixing the crushed aggregates of grading 2 with VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hyrdostatic paver finisher and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and as directed by Engineer-in-Charge. | 2,169 | XSqm | 3,000 ₹65,07,000 | 2,800 ₹60,73,200 Lowest | 3,100 ₹67,23,900 |
| 5.01Notes:- (i). The contractor shall quotes the rate against Item considering 5.5% VG-30 bitumen content. Job Mix Formula as per CIause. No. 505.3.3 of MORTH (5th Rev) for BC shall be worked out from Thapar Insti. of Engg & Tech Patiala/ PEC Chandigarh/ Command Test Lab / Maharaja Ranjit Singh Tech University, Bathinda for obtaining Optimum Binder Content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to the Garrison Engineer for approval. Any variation in binder content on minus side shall be adjusted @ Rs 50/kg of binder and no adjustment shall be made on plus side. (ii). Cost of filler i.e. cement (Ordinary portland cement/OPC) is deemed to be included in quoted unit rate. (iii). After spreading of mix as per clause 507.4.7 entire surface during the operation shall be rolled with road roller 8-10 tonne (smooth wheeled) followed with vibratory road roller of 8-10 tonne static weight, followed by finished rolling with 6 to 8 tonne smooth wheel tendom roller as per Clause Nos. 507.4.8 and cost of the same is deemed to be included in quoted unit rate. | ||||||
| 5.02(iv) The vintage of the T&P (Hot mix plant/road roller i.e. vibratory roller, static roller, hydraulic roller/paver) should not be more than 10 years except the tippers and shall be approved by GE before date of commencement of the work. (v) The certificate wrt the capacity of the hot mix plant (HMP) shall be 100-120 TPH and the plant shall be electronic operated, batch type and location be intimated and the same shall be approved by GE before date of commencement of the work. (vi) The distance of the HMP shall not be more than 100 KM from the Mil Stn Patiala, Detail of plant to be submitted to GE for approval before date of commencement of the work. (vii) The calibration certificate for HMP shall be submitted by the contractor for approval of GE before date of commencement of the work which should not be more than 6 months old. (viii) The minimum 2 Road roller each (vibrating and static road roller) are required at site before commencement of the work on the ground and the same shall be approved by GE before date of commencement of the work. (ix) Aggregates retrieved from dismantling of existing pavement shall not be used in top carpetting layer. | ||||||
| 6.00 | Repairs to pot holes any depth not exceeding 1.00 Sqm each including sweeping free from dust and mud or water, scouring sunken surfaces in roads, path etc cutting edges at least 25 mm depth and making good by applying tack coat with bitumen grade VG-10 @ 5 kg/X Sqm, putting in premix bituminous macadam using paving bitumen of grade VG-30 well rammed and sealed with binder @ 9.80 kg mixed with 0.09 cum of stone chippings 6.3 mm size per 10 Sqm and again well rammed including supply of premixed macadam, binder and chipings, depth of pot holes exe 30mm thick complete all as specified and as directed by Engineer-in-Charge. | 20 | XSqm | 2,000 ₹40,000 | 1,200 ₹24,000 | 1,000 ₹20,000 Lowest |
| 7.00 | Material and Labour for 2.5mm thick road marking thermo plastic reflective paint to be carried out mechanically with hot application of material (painting material @ 5 Kg /Sqm ) and glass beads @ 250 gm/Sqm confirming to CI No. 803.4 of MoRTH in strips of 100/150 mm width on road surfaces complete all as specified and as directed by Engineer-in-Charge. | 1,234 | Sqm | 350 ₹4,31,900 | 330 ₹4,07,220 Lowest | 360 ₹4,44,240 |
| 8.00 | Material and labour for 5mm thick rumble stirps as road marking with thermo plastic reflective paint to be carried out mechanically with hot application of material (painting material @ 5 Kg /Sqm for each coat of 2.5mm thick ) and glass beads @ 250 gm/Sqm for each coat of 2.5mm thick confirming to CI No. 803.4 of MoRTH in strips of any width on road surfaces complete all as specified and directed by Engineer-in-Charge. | 100 | Sqm | 600 ₹60,000 | 450 ₹45,000 Lowest | 600 ₹60,000 |
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
30 May 2026, 6:00 pmClosed
HQ CWE PATIALA
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact 01712200082
SPECIAL REPAIR TO MAIN ROAD FROM TARAPORE GATE PASSING THROUGH CAVALRY CHOWK UPTO ENGINEER GATE (APPROXIMATE 3.5 KILOMETER) AT SECTOR B AND SECTOR Z UNDER GE (SOUTH) PATIALA
2026_MES_763183_1
CWE/PAT/T-07/2026-27
Open Tender
Civil Works
Item Rate
150 days
GE S PATIALA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹2.1 L
26 Jun 2026
2 May 2026
1 Jun 2026
2 May 2026
30 May 2026
23 May 2026
2 May 2026 - 20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing damaged flexible pavements/ bitumen surface in single pass by cold milling machine (Wirtgen or equivalent) upto any depth using milling machine fitted with loading conveyer for loading the milled material directly on to trucks for safe disposal with all leads and lifts and disposal of dismantled materials outside the defence land complete all as specified and directed by Engineer-in-Charge. | 708 | Cum | 1.25 | ₹885 |
| 2 | Material and labour for preparing existing black top surface by brushing with wire brushed for removing caked mud etc sweeping with brooms and finally fanning to cleaned surface with gunny bags to remove all loose dirt etc from black top surface and applying evenly a premix /tack coat of bitumen grade VG-10 @ 5.0 Kg per ten Sqm complete all as specified and as directed by Engineer-in-Charge. | 2,169 | XSqm | 2.25 | ₹4,880.25 |
| 3 | Material and labour for providing and laying Premix Bituminous macadam of consolidated thickness 25mm to 50mm, using paving bitumen binder of grade VG-30 @ and binder content of 4% by weight of total mix, Mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic paver finisher (Paver shall not be compulsory in case of patch work using B.M.) and as per approved mix, rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 504 MoRTH (5th Rev) specification complete all as specified and as directed by Engineer-in-Charge. Notes :
1.The contractor shall quote the rate against Item considering 4% VG-30 bitumen content. Job Mix Formula as per CI. No. 505.3.3 of MORTH (5th Rev) for BM shall be worked out from Thapar Insti. of Engg & Tech Patiala/ PEC Chandigarh/ Command Test Lab / Maharaja Ranjit Singh Tech University Bathinda for obtaining optimum binder content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to Garrison Engineer for approval. Any variation in binder content on minus side shall be adjusted @ Rs 50/kg of binder and no adjustment shall be made on plus side.
2. The BM shall be covered with top layer/wearing course within in a maximum of 48 hours. If ther is to be any delay, by the contractor the course shall be covered by seal coat to the requirement of Clause 512 of MORTH (5th Rev) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. | 516 | Cum | 3.25 | ₹1,677 |
| 4 | Material and labour for applying evenly a premix /tack coat of bitumen grade VG-10 @ 4.0 Kg per ten Sqm complete all as specified and as directed by Engineer-in-Charge. | 1,031 | XSqm | 4.25 | ₹4,381.75 |
| 5 | Material and labour for providing and laying Premix Bituminous concrete 30mm consolidated thickness with 5.5% binder (paving bitumen of grade VG-30) content by weight of total mix and mixing the crushed aggregates of grading 2 with VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hyrdostatic paver finisher and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and as directed by Engineer-in-Charge. | 2,169 | XSqm | 4.25 | ₹9,218.25 |
| 5.02 | (iv) The vintage of the T&P (Hot mix plant/road roller i.e. vibratory roller, static roller, hydraulic roller/paver) should not be more than 10 years except the tippers and shall be approved by GE before date of commencement of the work.
(v) The certificate wrt the capacity of the hot mix plant (HMP) shall be 100-120 TPH and the plant shall be electronic operated, batch type and location be intimated and the same shall be approved by GE before date of commencement of the work.
(vi) The distance of the HMP shall not be more than 100 KM from the Mil Stn Patiala, Detail of plant to be submitted to GE for approval before date of commencement of the work.
(vii) The calibration certificate for HMP shall be submitted by the contractor for approval of GE before date of commencement of the work which should not be more than 6 months old.
(viii) The minimum 2 Road roller each (vibrating and static road roller) are required at site before commencement of the work on the ground and the same shall be approved by GE before date of commencement of the work.
(ix) Aggregates retrieved from dismantling of existing pavement shall not be used in top carpetting layer. | - | - | - | - |
| 6 | Repairs to pot holes any depth not exceeding 1.00 Sqm each including sweeping free from dust and mud or water, scouring sunken surfaces in roads, path etc cutting edges at least 25 mm depth and making good by applying tack coat with bitumen grade VG-10 @ 5 kg/X Sqm, putting in premix bituminous macadam using paving bitumen of grade VG-30 well rammed and sealed with binder @ 9.80 kg mixed with 0.09 cum of stone chippings 6.3 mm size per 10 Sqm and again well rammed including supply of premixed macadam, binder and chipings, depth of pot holes exe 30mm thick complete all as specified and as directed by Engineer-in-Charge. | 20 | XSqm | 8.25 | ₹165 |
| 7 | Material and Labour for 2.5mm thick road marking thermo plastic reflective paint to be carried out mechanically with hot application of material (painting material @ 5 Kg /Sqm ) and glass beads @ 250 gm/Sqm confirming to CI No. 803.4 of MoRTH in strips of 100/150 mm width on road surfaces complete all as specified and as directed by Engineer-in-Charge. | 1,234 | Sqm | 9.25 | ₹11,414.5 |
| 8 | Material and labour for 5mm thick rumble stirps as road marking with thermo plastic reflective paint to be carried out mechanically with hot application of material (painting material @ 5 Kg /Sqm for each coat of 2.5mm thick ) and glass beads @ 250 gm/Sqm for each coat of 2.5mm thick confirming to CI No. 803.4 of MoRTH in strips of any width on road surfaces complete all as specified and directed by Engineer-in-Charge. | 100 | Sqm | 10.25 | ₹1,025 |
| 9 | Supply and fixing road cat eye of dimenions 89-90X101-102x17mm meeting with ASTM and MoR&TH standards with yellow reflector yellow body colour or any other colour as approved and two side Retroreflective Microprismatic tough Polycarbonate lens all as specified. The studs shall be fixed to the road surface using the epoxy/adhesive conforming to IS, as per manufacturers recommendation complete all as specified and as directed by Engineer-in-Charge. | 1,372 | Each | 12.25 | ₹16,807 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_854857.xls
BOQ • 0.32 MB
Tender072627.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .