Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 LAdmitted-Finance 2A 40 1 DHARMATALA ROAD KASBA KOLKATA WEST BENGAL 700042 | KOLKATA | KOLKATA | WEST BENGAL | 700042 | L1 | Admitted-Finance | |
| 2 | L2₹49.9 L+₹97,547.31 (1.99%)Admitted-Finance B 20 H 1 PANCHANANTALLA ROAD KOLKATA 700029 | KOLKATA | WEST BENGAL | 700029 | L2 | Admitted-Finance | |
| 3 | L3₹50.0 L+₹1.1 L (2.22%)Admitted-Finance 17 1A BALLYGUNGE CIRCULAR ROAD KOLKATA 700 019 | KOLKATA | WEST BENGAL | 700019 | L3 | Admitted-Finance | |
| 4 | L4₹50.0 L+₹1.1 L (2.25%)Admitted-Finance P 45 KHIRODE VIDYA BINOD AVENUE KOLKATA 700003 | KOLKATA | WEST BENGAL | 700003 | L4 | Admitted-Finance | |
| 5 | L5₹50.1 L+₹1.1 L (2.33%)Admitted-Finance 22A ASWINI DUTTA ROAD KOLKATA 700029 | KOLKATA | WEST BENGAL | 700029 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | EAST COAST STANDARD PRODUCTS L5 | M A ENTERPRISES L3 | UNIVERSAL TRADING CENTRE L4 | RAY STANDARD ENGG CO. L2 | SPS TRADING L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of AC (corrugated, semi corrugated) sheet in roof covering incl ridges complete all as specified and directed | 597 | Sqm | 39 ₹23,283 Lowest | 39.31 ₹23,468.07 | 39 ₹23,283 Lowest | 39.24 ₹23,426.28 | 57 ₹34,029 |
| 2.00 | Taking down existing roof treatment upto original roof surfaces and removing the debris from the site etc complete all as specified and directed | 5 | Sqm | 193 ₹965 | 192.19 ₹960.95 | 192 ₹960 | 191.84 ₹959.2 | 70 ₹350 Lowest |
| 3.00 | Dismantling wall and ceiling board (fibre, pulp, insulation) any thickness incl. cover fillet complete all as specified and directed | 375 | Sqm | 46 ₹17,250 | 45.86 ₹17,197.5 | 46 ₹17,250 | 45.78 ₹17,167.5 Lowest | 70 ₹26,250 |
| 4.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 3.1 | Qtl | 629 ₹1,949.9 | 627.9 ₹1,946.49 | 628 ₹1,946.8 | 626.75 ₹1,942.92 Lowest | 900 ₹2,790 |
| 5.00 | Dismantling timber scantling 40 Sqcm and over in section unframed work complete all as specified and specified and directed | 3.75 | Cum | 1,029 ₹3,858.75 | 1,027.57 ₹3,853.39 | 1,029 ₹3,858.75 | 1,025.69 ₹3,846.34 | 941 ₹3,528.75 Lowest |
| 6.00 | All as per item No. 05 here in before but fillets, rails, post rafter, purlin under 40 Sqcm in section in unframed work complete all as specified and directed | 360 | RM | 18 ₹6,480 | 17.46 ₹6,284.16 | 17 ₹6,120 Lowest | 17.44 ₹6,278.4 | 25 ₹9,000 |
| 7.00 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 3.2 | Cum | 1,796 ₹5,747.2 | 1,793.06 ₹5,737.79 | 1,795 ₹5,744 | 1,789.78 ₹5,727.3 | 650 ₹2,080 Lowest |
| 8.00 | Taking down cement plaster of any description on brick work or stone msonary wall including racking of joints hacking for key scrubbing down with water etc. complete all as specified and directed | 740 | Sqm | 104 ₹76,960 | 103.74 ₹76,767.6 | 104 ₹76,960 | 103.55 ₹76,627 | 85 ₹62,900 Lowest |
| 9.00 | Taking down chowkhats or frames with shutters (without taking off shutter from frames) of any sizes nexc 1.5 Sqm each complete all as specified and directed | 37 | Each | 310 ₹11,470 | 309.04 ₹11,434.48 | 309 ₹11,433 | 308.47 ₹11,413.39 | 250 ₹9,250 Lowest |
| 10.00 | All as item No. 09 here in before but exc 1.5 Sqm and nexc 4.0 Sqm each. | 23 | Each | 394 ₹9,062 | 393.12 ₹9,041.76 | 393 ₹9,039 | 392.4 ₹9,025.2 | 285 ₹6,555 Lowest |
Tender Value
₹46.3 L
EMD Value
₹92,667
Closing Date
14 Sept 2026, 6:00 pmClosed
SHRI RAKESH KUMAR
GARRISON ENGINEER (CENTRAL) KOLKATA NAPIER ROAD HASTINGS 700022
SPL REPAIR OF T-87 AND T-23 AT RASPUNJA MIL STN UNDER GE (C) KOLKATA
2026_MES_784754_1
8973/E8
Open Tender
Miscellaneous Works
Item Rate
180 days
Kolkata
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE(CENTRAL) KOLKATA
₹92,667
Yes
22 Sept 2026
17 Aug 2026
15 Sept 2026
17 Aug 2026
14 Sept 2026
1 Sept 2026
17 Aug 2026 - 31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of AC (corrugated, semi corrugated) sheet in roof covering incl ridges complete all as specified and directed | 597 | Sqm | - | - |
| 2 | Taking down existing roof treatment upto original roof surfaces and removing the debris from the site etc complete all as specified and directed | 5 | Sqm | - | - |
| 3 | Dismantling wall and ceiling board (fibre, pulp, insulation) any thickness incl. cover fillet complete all as specified and directed | 375 | Sqm | - | - |
| 4 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 3.1 | Qtl | - | - |
| 5 | Dismantling timber scantling 40 Sqcm and over in section unframed work complete all as specified and specified and directed | 3.75 | Cum | - | - |
| 6 | All as per item No. 05 here in before but fillets, rails, post rafter, purlin under 40 Sqcm in section in unframed work complete all as specified and directed | 360 | RM | - | - |
| 7 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 3.2 | Cum | - | - |
| 8 | Taking down cement plaster of any description on brick work or stone msonary wall including racking of joints hacking for key scrubbing down with water etc. complete all as specified and directed | 740 | Sqm | - | - |
| 9 | Taking down chowkhats or frames with shutters (without taking off shutter from frames) of any sizes nexc 1.5 Sqm each complete all as specified and directed | 37 | Each | - | - |
| 10 | All as item No. 09 here in before but exc 1.5 Sqm and nexc 4.0 Sqm each. | 23 | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
TENDER8973.pdf
Tender Documents • 1.40 MB
BOQ_879340.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .