| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.1 LAccepted-Finance | L1 | Accepted-Finance LOW BID | |
| 2 | L2₹64.9 L+₹2.8 L (4.47%)Rejected-Finance | L2 | Rejected-Finance HIGH BID | |
| 3 | L3₹70.8 L+₹8.7 L (14.0%)Rejected-Finance | L3 | Rejected-Finance HIGH BID | |
| 4 | L4₹72.7 L+₹10.7 L (17.2%)Rejected-Finance | L4 | Rejected-Finance HIGH BID | |
| 5 | Rejected-Technical BLOCK S HOUSE 75 MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | - | Rejected-Technical Condition No-9 not full filled |
| Sl No | Description | Qty | Unit | M/s SINGH BROTHERS L4 | VISION ASSOCIATES L2 | AVADH NARAYAN L1 | SHYAM PRAKASH L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Survey Work & Jungle cutting for survey of pond | 1 | job | 9,995 ₹9,995 | 10,000 ₹10,000 | 8,500 ₹8,500 Lowest | 9,900 ₹9,900 |
| 2.00 | Site cleaning with Jungles & Bushes as per irregation S.No CH-4th/2(e) | 42,800 | Sqm. | 4.48 ₹1,91,744 | 4.5 ₹1,92,600 | 3.85 ₹1,64,780 Lowest | 4.45 ₹1,90,460 |
| 3.00 | Excavation in Earthwork in ordinary soil in digging including lead up to 30 M and lift upto 1.5M including dressing making profile and manual compaction but excluding mechanical compation. U.P.I.D. S.I no. 4.05 | 8,077.54 | Cum. | 103.25 ₹8,34,006.01 | 75 ₹6,05,815.5 Lowest | 88.25 ₹7,12,842.91 | 102.95 ₹8,31,582.74 |
| 4.00 | Earth work excavation by Machine | 45,772.73 | Cum. | 62.75 ₹28,72,238.81 | 55 ₹25,17,500.15 | 53.5 ₹24,48,841.06 Lowest | 59 ₹27,00,591.07 |
| 5.00 | Excavation in Earthwork in ordinary soil in (Inlet, Ramp) | 200.15 | Cum. | 89.5 ₹17,913.43 | 90 ₹18,013.5 | 76 ₹15,211.4 Lowest | 89.1 ₹17,833.37 |
| 6.00 | C.C.in 1:3:6 Cement, Sand and 20 to 40 mm Stone ballast including the cost of materials labours and etc. required for proper completion of work.(Inlet,Ramp) | 58.05 | Cum. | 9,100 ₹5,28,255 | 9,000 ₹5,22,450 | 7,767 ₹4,50,874.35 Lowest | 9,046.75 ₹5,25,163.84 |
| 7.00 | M-150 Bricks massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work.(Inlet,Ramp) | 135.09 | Rm. | 7,620 ₹10,29,385.8 | 7,000 ₹9,45,630 | 6,511 ₹8,79,570.99 Lowest | 7,583 ₹10,24,387.47 |
| 8.00 | SUPPLY& FIXING OF 1000mm NP3 HUME PIPE WITH COLLAR (Inlet) | 60 | Cum. | 8,300 ₹4,98,000 | 8,000 ₹4,80,000 | 7,100 ₹4,26,000 Lowest | 8,275 ₹4,96,500 |
| 9.00 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm grit including the cost of materials labours and etc.to required for proper completion of work.(Inlet,Ramp) | 13.87 | Cum. | 9,510 ₹1,31,903.7 | 9,539 ₹1,32,305.93 | 8,105 ₹1,12,416.35 Lowest | 9,444 ₹1,30,988.28 |
| 10.00 | Plaster work in 1:3 c/s mortar on masonary work | 260.02 | Sqm. | 223 ₹57,984.46 | 224 ₹58,244.48 | 190.9 ₹49,637.82 Lowest | 222 ₹57,724.44 |
Tender Value
Refer Docs
EMD Value
₹7.0 L
Closing Date
26 Mar 2026, 5:00 pmClosed
EE MI Gonda
EE MI Office Near Vikas Bhawan Civil Lines Gonda
Renovation of Srijana Pond work as per BOQ
2026_UPMID_1125344_1
1201/mi/Acct/2025-26 dt 09-03-2026
Open Tender
Civil Works
Item Wise
Village Tirukh Bujurg Block Chapiya Dist Gonda UP
As per NIT
2 documents required · 2 mandatory
₹2,354
Excutive Engineer Minor Irrigation Division Gonda
₹7.0 L
EE MI Office Gonda
6 Apr 2026
18 Mar 2026
27 Mar 2026
18 Mar 2026
26 Mar 2026
18 Mar 2026
18 Mar 2026
Survey Work & Jungle cutting for survey of pond
Site cleaning with Jungles & Bushes as per irregation S.No CH-4th/2(e)
Excavation in Earthwork in ordinary soil in digging including lead up to 30 M and lift upto 1.5M including dressing making profile and manual compaction but excluding mechanical compation. U.P.I.D. S.I no. 4.05
Earth work excavation by Machine
Excavation in Earthwork in ordinary soil in (Inlet, Ramp)
C.C.in 1:3:6 Cement, Sand and 20 to 40 mm Stone ballast including the cost of materials labours and etc. required for proper completion of work.(Inlet,Ramp)
M-150 Bricks massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work.(Inlet,Ramp)
SUPPLY& FIXING OF 1000mm NP3 HUME PIPE WITH COLLAR (Inlet)
C.C.in 1:2:4 Cement, Sand and 10 to 20 mm grit including the cost of materials labours and etc.to required for proper completion of work.(Inlet,Ramp)
Plaster work in 1:3 c/s mortar on masonary work
Pointing work in 1:3 c/s mortar on masonery work
Watering/Dewatering during the work by 5 HP Diesel pumping set.
Supply & Laying Bentonite Powder For Prevention Of Seepage of water In Pond
Photography
Sample testing (PCC 1:2:4 & Mortar 1:4)
Supply & fixing of sign Board
Plantation
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
NIT.pdf
Tender Documents • 1.26 MB
BOQ_2097854.xls
BOQ • 0.29 MB
miletter.pdf
PDF • 0.26 MB
miletter.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .