| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | ₹8.4 L | L1 | Accepted-Finance Qulalified |
| 2 | L2₹8.9 L+₹54,830 (6.55%)Accepted-Finance | ₹8.9 L+₹54,830 (6.55%) | L2 | Accepted-Finance Qulalified |
| 3 | L3₹10.0 L+₹1.6 L (19.1%)Accepted-Finance | ₹10.0 L+₹1.6 L (19.1%) | L3 | Accepted-Finance Qulalified |
| Sl No | Description | Qty | Unit | Vivek Electricals L3 | NEHA ENTERPRISES L1 | SS ASSOCIATES BSR L2 |
|---|---|---|---|---|---|---|
| 1.00Carriage of Following Material from ESC BSR to pit site on Kachcha Pacca Road including loading and unloading charges at both ends. | ||||||
| 2.00 | Carrige of S.T. Pole 13 Mtrs. Long | 2 | Nos. | 3,000 ₹6,000 | 2,500 ₹5,000 Lowest | 3,000 ₹6,000 |
| 3.00 | Carrige of S.T. Pole 11 Mtrs. Long | 6 | Nos. | 2,000 ₹12,000 Lowest | 2,000 ₹12,000 Lowest | 3,000 ₹18,000 |
| 4.00 | Carriage of line accessories such as XLPE Cable, Disc insulator, Disc Fitting, MS Angel, MS Channel,Earthing Complete, Stay set, etc. | 20 | Qtl. | 500 ₹10,000 Lowest | 500 ₹10,000 Lowest | 500 ₹10,000 Lowest |
| 5.00Erection of Following Material at the site of Work under EDD Shikarpur. | ||||||
| 6.00 | Erection of Single pole support with STP 13 Mtr. Long including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 2 | Nos. | 3,500 ₹7,000 Lowest | 3,500 ₹7,000 Lowest | 4,000 ₹8,000 |
| 7.00 | Erection of Single pole support with STP 11 Mtr. Long including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 6 | Nos. | 30,000 ₹1,80,000 | 2,800 ₹16,800 Lowest | 4,000 ₹24,000 |
| 8.00 | Grouting of Poles shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 8 | Nos. | 1,500 ₹12,000 | 1,400 ₹11,200 Lowest | 1,500 ₹12,000 |
| 9.00 | Earthing Complete with MS Earthing Rod 20x2500 mm 65 SWG G.I. Wire for Pole Earthing. | 8 | Nos. | 500 ₹4,000 | 400 ₹3,200 Lowest | 500 ₹4,000 |
| 10.00 | Laying stringing & sagging of 33 KV XLPE 3x300 mm2 Double Circuit. | 910 | Mtr. | 20 ₹18,200 | 12 ₹10,920 Lowest | 20 ₹18,200 |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
27 Apr 2026, 11:00 amClosed
SE, EDC-III BULANDSHAHR
SE, EDC-III BULANDSHAHR
Work involving the shifting of 33 kV lines to underground lines under the Full Deposit Scheme within the jurisdiction of the Electricity Distribution Division, Shikarpur, Bulandshahr
2026_PVVNL_1126108_3
80/EDC-III/B/2025-2026
Open Tender
Electrical Works
Lump-sum
30 days
SE, EDC-III BULANDSHAHR
Work involving the shifting of 33 kV lines to underground lines under the Full Deposit Scheme within the jurisdiction of the Electricity Distribution Division, Shikarpur, Bulandshahr
2 documents required · 2 mandatory
₹1,180
Yes
SE, EDC-III BULANDSHAHR
₹8,500
Yes
11 May 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of Following Material from ESC BSR to pit site on Kachcha Pacca Road including loading and unloading charges at both ends. | - | - | - | - |
| 2 | Carrige of S.T. Pole 13 Mtrs. Long | - | Nos. | - | - |
| 3 | Carrige of S.T. Pole 11 Mtrs. Long | - | Nos. | - | - |
| 4 | Carriage of line accessories such as XLPE Cable, Disc insulator, Disc Fitting, MS Angel, MS Channel,Earthing Complete, Stay set, etc. | - | Qtl. | - | - |
| 5 | Erection of Following Material at the site of Work under EDD Shikarpur. | - | - | - | - |
| 6 | Erection of Single pole support with STP 13 Mtr. Long including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | - | Nos. | - | - |
| 7 | Erection of Single pole support with STP 11 Mtr. Long including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | - | Nos. | - | - |
| 8 | Grouting of Poles shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | - | Nos. | - | - |
| 9 | Earthing Complete with MS Earthing Rod 20x2500 mm 65 SWG G.I. Wire for Pole Earthing. | - | Nos. | - | - |
| 10 | Laying stringing & sagging of 33 KV XLPE 3x300 mm2 Double Circuit. | - | Mtr. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
80NITSKR3.pdf
Tender Documents • 1.12 MB
BOQ_2128307.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .