| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | ₹8.4 L | L1 | Accepted-Finance Qulalified |
| 2 | L2₹8.9 LAccepted-Finance | ₹8.9 L | L2 | Accepted-Finance Qulalified |
| 3 | L3₹10.0 LAccepted-Finance | ₹10.0 L | L3 | Accepted-Finance Qulalified |
| Sl No | Description | Qty | Unit | Vivek Electricals L3 | NEHA ENTERPRISES L1 | SS ASSOCIATES BSR L2 |
|---|---|---|---|---|---|---|
| 1.00Carriage of Following Material from ESC BSR to pit site on Kachcha Pacca Road including loading and unloading charges at both ends. | ||||||
| 2.00 | Carrige of S.T. Pole 13 Mtrs. Long | 2 | Nos. | 3,000 ₹6,000 | 2,500 ₹5,000 | 3,000 ₹6,000 |
| 3.00 | Carrige of S.T. Pole 11 Mtrs. Long | 6 | Nos. | 2,000 ₹12,000 | 2,000 ₹12,000 | 3,000 ₹18,000 |
| 4.00 | Carriage of line accessories such as XLPE Cable, Disc insulator, Disc Fitting, MS Angel, MS Channel,Earthing Complete, Stay set, etc. | 20 | Qtl. | 500 ₹10,000 | 500 ₹10,000 | 500 ₹10,000 |
| 5.00Erection of Following Material at the site of Work under EDD Shikarpur. | ||||||
| 6.00 | Erection of Single pole support with STP 13 Mtr. Long including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 2 | Nos. | 3,500 ₹7,000 | 3,500 ₹7,000 | 4,000 ₹8,000 |
| 7.00 | Erection of Single pole support with STP 11 Mtr. Long including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 6 | Nos. | 30,000 ₹1.8 L | 2,800 ₹16,800 | 4,000 ₹24,000 |
| 8.00 | Grouting of Poles shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 8 | Nos. | 1,500 ₹12,000 | 1,400 ₹11,200 | 1,500 ₹12,000 |
| 9.00 | Earthing Complete with MS Earthing Rod 20x2500 mm 65 SWG G.I. Wire for Pole Earthing. | 8 | Nos. | 500 ₹4,000 | 400 ₹3,200 | 500 ₹4,000 |
| 10.00 | Laying stringing & sagging of 33 KV XLPE 3x300 mm2 Double Circuit. | 910 | Mtr. | 20 ₹18,200 | 12 ₹10,920 | 20 ₹18,200 |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
27 Apr 2026, 11:00 amClosed
SE, EDC-III BULANDSHAHR
SE, EDC-III BULANDSHAHR
Work involving the shifting of 33 kV lines to underground lines under the Full Deposit Scheme within the jurisdiction of the Electricity Distribution Division, Shikarpur, Bulandshahr
2026_PVVNL_1126108_3
80/EDC-III/B/2025-2026
Open Tender
Electrical Works
30 days
SE, EDC-III BULANDSHAHR
Work involving the shifting of 33 kV lines to underground lines under the Full Deposit Scheme within the jurisdiction of the Electricity Distribution Division, Shikarpur, Bulandshahr
2 documents required · 2 mandatory
₹1,180
Yes
SE, EDC-III BULANDSHAHR
₹8,500
Yes
11 May 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of Following Material from ESC BSR to pit site on Kachcha Pacca Road including loading and unloading charges at both ends. | - | - | - | - |
| 2 | Carrige of S.T. Pole 13 Mtrs. Long | - | Nos. | - | - |
| 3 | Carrige of S.T. Pole 11 Mtrs. Long | - | Nos. | - | - |
| 4 | Carriage of line accessories such as XLPE Cable, Disc insulator, Disc Fitting, MS Angel, MS Channel,Earthing Complete, Stay set, etc. | - | Qtl. | - | - |
| 5 | Erection of Following Material at the site of Work under EDD Shikarpur. | - | - | - | - |
| 6 | Erection of Single pole support with STP 13 Mtr. Long including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | - | Nos. | - | - |
| 7 | Erection of Single pole support with STP 11 Mtr. Long including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | - | Nos. | - | - |
| 8 | Grouting of Poles shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | - | Nos. | - | - |
| 9 | Earthing Complete with MS Earthing Rod 20x2500 mm 65 SWG G.I. Wire for Pole Earthing. | - | Nos. | - | - |
| 10 | Laying stringing & sagging of 33 KV XLPE 3x300 mm2 Double Circuit. | - | Mtr. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
80NITSKR3.pdf
Tender Documents • 1.12 MB
BOQ_2128307.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid