Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 LAccepted-AOC R O ORAHATA SHAHGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | ₹32.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹32.7 LRejected-AOC | ₹32.7 L | L2 | Rejected-AOC L2 |
| 3 | L2₹32.7 LRejected-AOC | ₹32.7 L | L2 | Rejected-AOC L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
Tender Value
₹32.7 L
EMD Value
₹65,000
Closing Date
9 May 2026, 3:00 pmClosed
Project Manager Unit-22
Bahraich
CONSTRUCTION OF BOUNDARY WALL FOR AUTONOMOUS STATE MEDICAL COLLEGE AND HOSPITAL DISTT- GONDA (U.P)
2026_UPPRC_1144962_1
03/PCL/PM/BRH/E-TENDER/2026-27 Dated 02-05-2026
Open Tender
Civil Works
Percentage
180 days
Gonda
CONSTRUCTION OF BOUNDARY WALL FOR AUTONOMOUS STATE MEDICAL COLLEGE AND HOSPITAL DISTT- GONDA (U.P)
2 documents required · 2 mandatory
₹5,900
₹65,000
Yes
9 Jun 2026
4 May 2026
9 May 2026
4 May 2026
9 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BOUNDARY WALL (HIGHT UP TO 2100 MM )
Excavation in foundation in ordinary soil (loam clay or sand)including filling lift upto 1.5m (5 feets) & lead upto 30m (100 feets) & including filling ,watering & ramming of excavated earth in to the trenches or into the space b/w the building & the site of foundation trenches or into the plinth & removal & disposal of surplus earth as directed by the E/I uptp a distance of 30M(100 fts.) from the foundation trenches | - | CUM | - | - |
| 2 | Providing and laying in cement concrete 1:4:8 (1 cement :4 Coarse sand sand :8 graded bricks aggregate 40 mm nominal size) including supply of all materials & labours & T& P etc. required for proper completion of the work & curing complete, also including cost of form-work,in foundation and floors. | - | CUM | - | - |
| 3 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4") guage approved stone ballast in the proportion 1:1.5:3(M-20) in works excluding supply of reinforcement and its bending but including its fixing & bending the same with 24 B WG GI binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item(bands) | - | CUM | - | - |
| 4 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4") guage approved stone ballast in the proportion 1:1.5:3(M-20) in works excluding supply of reinforcement and its bending but including its fixing & bending the same with 24 B WG GI binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item(column) | - | CUM | - | - |
| 5 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4") guage approved stone ballast in the proportion 1:1.5:3(M-20) in works excluding supply of reinforcement and its bending but including its fixing & bending the same with 24 B WG GI binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item(foundation) | - | CUM | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete. | - | SQM | - | - |
| 7 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. with water proof ply 12 mm thick | - | SQM | - | - |
| 8 | Columns,Pillars, Piers, Abutments, Posts and Struts. | - | SQM | - | - |
| 9 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.Cement mortar 1:4 (1 cement :4 coarse sand) | - | CUM | - | - |
| 10 | Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in anover all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. TMT Fe 500 | - | QTL. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_2139854.xls
BOQ • 0.29 MB
Tender_Bid.pdf
Tender Documents • 3.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].