| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance FLAT NO 100 USTAV ENCALVE WARD NO 08 P O SAILASHREE VIHAR BLOCK ULB BHUBANESWAR MC P S CHANDRASEKHARPUR DIST KHURDHA 752066 ODISHA | BHUBANESWAR | KHURDHA | ODISHA | 752066 | -19.99% | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹18.1 L (11.2%)Admitted-Finance | -11.00% | ₹1.8 Cr+₹18.1 L (11.2%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹40.2 L (25.0%)Admitted-Finance | +0.00% | ₹2.0 Cr+₹40.2 L (25.0%) | L3 | Admitted-Finance |
| 4 | L3₹2.0 Cr+₹40.2 L (25.0%)Admitted-Finance | +0.00% | ₹2.0 Cr+₹40.2 L (25.0%) | L3 | Admitted-Finance |
| 5 | L3₹2.0 Cr+₹40.2 L (25.0%)Admitted-Finance | +0.00% | ₹2.0 Cr+₹40.2 L (25.0%) | L3 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
24 Apr 2026, 5:00 pmClosed
Chief Construction Engineer,RWC,Angul
ANGUL
Construction of 24 x7 PHC Building at Handapa for the year 2023-24 in the District of Angul
2026_CERWI_128049_1
Building-AGL-39/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
540 days
Angul
2 documents required · 2 mandatory
₹10,000
₹2.0 L
Yes
7 Jul 2026
10 Apr 2026
24 Apr 2026
10 Apr 2026
24 Apr 2026
10 Apr 2026
10 Apr 2026 - 23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | CIVIL WORKS
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including cost of all labours, T & P, sundries etc. as required for the work complete as per the direction of the Engineer-in-charge. | - | cum | - | - |
| - | Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge.Upto 1.5 Mtr Depth | - | cum | - | - |
| - | From 1.5 Mtr upto 3.0 Mtr Depth | - | cum | - | - |
| - | Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge.Upto 1.5 Mtr Depth | - | cum | - | - |
| - | From 1.5 Mtr upto 3.0 Mtr Depth | - | cum | - | - |
| - | Supplying and stacking of good earth at site obtained from approved borrow pits including including carriage by mechanical means from within a specified Lead from from the site, including loading, unloading to approved dumping ground or as approved /directed by Engineer-in-charge, including cost of equipments/ labour, conveyance, royalty, T&P etc. as per the direction of Engineer-in-charge. ((earth measured in stacks will be reduced by 20% for payment). | - | cum | - | - |
| - | Disposal of building rubbish / malba /rock/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved dumping ground or as approved /directed by Engineer-in-charge, including all lifts involved.etc as per the direction of Engineer-in-charge. | - | sqm | - | - |
| - | Supplying, diluting and preparing chemical emulsion like CHLORPYRIPHOS or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as pre-constructional anti termite treatment and creating a chemical barrier under and around wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, surrounding the pipes and conduits etc. complete at the rate of 7.5 liters (or as directed by the manufacturer) per sqm on vertical and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center etc.complete as per IS:6313/1981(Part-II) and as per the direction of the Engineer -in-charge including all cost of materials, labour and T&P etc all complete. | - | cum | - | - |
| - | Supplying and filling with sand in foundation and plinth in layers not exceeding 20 cm in depth, well watered and compacted , top surface dressed and levelled to proper level and gradient including cost of all materials, conveyance,royalties, loading, unloading, cost of all labour, T&P, etc. all complete as per the direction of Engineer-in-Charge. | - | cum | - | - |
| - | Providing and laying Plain Cement Concrete of proportion (1:4:8) using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | - | cum | - | - |
stage.html
html • 0.11 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.34 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_587647.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .