| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance | L1 | Accepted-Finance 1st Lowest | |
| 2 | L2₹2.0 L+₹21,046.97 (11.5%)Accepted-Finance | L2 | Accepted-Finance 2nd lowest | |
| 3 | L3₹2.1 L+₹23,060.97 (12.6%)Accepted-Finance | L3 | Accepted-Finance 3rd Lowest |
Tender Value
₹2.1 L
EMD Value
₹4,200
Closing Date
24 Jan 2023, 11:00 amClosed
AC (Works)
SHQ BSF Jammu
Minor Improvement of CHDH SH Replacement of sagged kota stone at BOP Gharana of 165 Bn BSF under SHQ BSF Jammu
2023_BSF_734613_1
30/NIT/Engg/SHQ-Jmu/22-23
Open Tender
Civil Works
Item Rate
60 days
BOP Gharana
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,200
7 Feb 2023
12 Jan 2023
25 Jan 2023
12 Jan 2023
24 Jan 2023
12 Jan 2023
Amount
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :25 mm thick
Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
Removing mortar and cement concrete from kota stone slab and cleaning kota stone slab including stacking within a lead of 50 m (stacks of cleaned kota stone slab shall be measured in SQM ) : From kota stone work in cement mortar
Re-fixing of Kota stone slab flooring over 20 mm (average) thick with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) (Cleaned kota stone slab shall be reuse)
rohit singh
SH. SURINDER MOHAN GUPTA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .