Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance RZ 3103B G F TUGALKABAD EXT GALI NO 35 SOUTH EAST DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | L1 | Admitted-Finance | ||
| 2 | L2₹8.7 L+₹880.12 (0.10%)Admitted-Finance NAURANGABAD SIKANDRA RAU HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical Technically Disqualified |
Tender Value
₹8.8 L
EMD Value
₹88,000
Closing Date
22 Jun 2026, 12:00 pmClosed
EO NP Mursan
NP Mursan
Nagar Panchayat Mursan me CHC Mursan me 500 Leter Chhmata RO Water Plant with 1.5 Ton Chillar Plant ka Karya
2026_DOLBU_1158899_1
1732/Tender/2026 Dt. 09.06.2026
Open Tender
Civil Works
Turn-key
60 days
NP Mursan
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,062
EO NP
₹88,000
Yes
23 Jul 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | DESCRIPTION OF WORK :- | - | - | - | - |
| 0.000 | Earth work in excavation in foundation. As per direction of E/I. | 6.75 | Cum | 193.69 | ₹1,307.41 |
| 0.000 | P/L Cement concreete 1:5:10 including all complete in all respect. As per direction of E/I. | 1.35 | Cum | 4,063.82 | ₹5,486.16 |
| 0.000 | M150 B/W 1:4 Cement C sand mortar in foundation action pillar complete in all respect. As per direction of E/I. | 3.63 | Cum | 5,354.86 | ₹19,438.14 |
| 0.000 | M150 B/W 1:4 Cement C sand mortar in super structure for a Thick wall complete in all respect. As per direction of E/I. | 7.16 | Cum | 5,925.27 | ₹42,424.93 |
| 0.000 | RCC work 1:1.5:3 Cement Coarse sand 20mm stone grit in plinth beam complete in all respect. As per direction of E/I. | 2.4 | Cum | 10,658.96 | ₹25,581.5 |
| 0.000 | RCC Work 1:1.5:3 slab complete in all respect. As per direction of E/I. | 0.09 | Cum | 10,658.98 | ₹959.31 |
| 0.000 | MS Iron work in reinforcmenet bar & above all complete in all respect. As per direction of E/I. | 0.07 | Kg | 9,412.12 | ₹658.85 |
| 0.000 | P/L Cement concreete 1:4:8 including all complete in all respect. As per direction of E/I. | 7.26 | Cum | 582.97 | ₹4,232.36 |
| 0.000 | 12mm thick plaster 1:4 cement & fine sand including all complete in all respect. As per direction of E/I. | 31.11 | sqm | 175.2 | ₹5,450.47 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_2171988.xls
BOQ • 0.25 MB
Biddocument.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .