Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹15.1 L+₹5.1 L (51.4%)Accepted-Finance AT PO PEDAGADI PS KAPTIPADA DIST MAYURBHANJ PIN 757040 | MAYURBHANJ | ODISHA | 757040 | L2 | Accepted-Finance Accepted | |
| 3 | L2₹15.1 L+₹5.1 L (51.4%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 4 | L2₹15.1 L+₹5.1 L (51.4%)Accepted-Finance AT BAUNSAPAL PO BHIMTALI PS UDALA DIST MAYURBHANJ PIN 757041 | MAYURBHANJ | ODISHA | 757041 | L2 | Accepted-Finance Accepted | |
| 5 | L2₹15.1 L+₹5.1 L (51.4%)Accepted-Finance | L2 | Accepted-Finance Accepted |
Tender Value
₹15.1 L
EMD Value
₹15,130
Closing Date
29 Jun 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, UDALA
PWD Road to Sarbanaghaty_Road_PMC seal coat0.000 to 1.000
2026_CERWI_132628_1
02(Online)/ RWD/ Udala2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
SE RW Division, Udala
2 documents required · 2 mandatory
₹6,000
₹15,130
Yes
13 Oct 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
22 Jun 2026 - 29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing & grubbing road land including uprooting rank vegetation, grass , bushes, shrubs, saplings & trees girth upto 300mm , removal of stumps etc. complete to shape as per direction of the Engineer-in-charge in the area of Light Jungle. | 1,860 | sqm | 8.6 | ₹15,996 |
| 2 | Providing, laying, spreading and compacting graded stone aggregates in Water Bound Macadam (WBM Gr-III) as per specification including all complete. | 11.36 | cum | 4,262.4 | ₹48,420.86 |
| 3 | Cleaning the existing Granular surface including removal of binding materials and other foreign materials with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous treatment. | 151.45 | sqm | 23.3 | ₹3,528.79 |
| 4 | Cleaning the existing BT surface including removal of binding materials and other foreign materials with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous treatment. | 2,736.05 | sqm | 5.6 | ₹15,321.88 |
| 5 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MORD Technical Specification Clause 502 for low porosity surface and as per direction of Engineer-in-Charge. | 151.45 | sqm | 91.7 | ₹13,887.97 |
| 6 | Applying tack coat with bitumen emulsion etc. complete to shape as per direction of the Engineer-in-charge. | 2,887.5 | sqm | 18.3 | ₹52,841.25 |
| 7 | Providing 20 mm thick premix carpet using 0.27 cum of 13.2 mm to 5.6 mm size crushed stone chipping & 14.6 kg penetration grade of bitumen per 10sqm including hand packing to proper camber & consolidation with PRR including cost & conveyance of materials, labour, T&P, royalty & taxes etc. complete as per direction of the Engineer-in-charge. | 2,887.5 | sqm | 283.4 | ₹8,18,317.5 |
| 8 | Providing 6 mm thick precoated seal coat type -B using 0.06 cum of 6.7 mm size chips & 6.8 kg of bitumen per 10sqm including consolidation with PRR, cost & conveyance of materials, labour, T&P, royalty & taxes etc. complete as per direction of the Engineer-in-charge. | 2,887.5 | sqm | 114.5 | ₹3,30,618.75 |
| 9 | Earth work in excavation of foundation in hard soil with initial lead and lift and to required depth including dressing and levelling the bed and depositing the excavated materials away from work site etc.complete as per direction of the Engineer-in-charge. | 49.5 | cum | 287 | ₹14,206.5 |
| 10 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance of materials, labour T&P, royalty etc.complete as per direction of the Engineer-in-charge. | 8.25 | cum | 633.3 | ₹5,224.72 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
finance_597453.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.75 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_597453.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .